'Me1 2' presentation slideshows

Me1 2 - PowerPoint PPT Presentation


Some Preliminary Test Beam Results

Some Preliminary Test Beam Results

Some Preliminary Test Beam Results. T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct 29 - 30, 2004. Outline. RPC impact on CSC in the June ‘04 test Installation and use of the GRID client for file transfer from CERN to Fermilab

By ollie
(121 views)

EMU Alignment System Analog Data Analysis for ME+1 y ME+4 Stations Run: Aug 25-28, 2006

EMU Alignment System Analog Data Analysis for ME+1 y ME+4 Stations Run: Aug 25-28, 2006

Endcap Muon Meeting at CERN Sept 18-19, 2006. EMU Alignment System Analog Data Analysis for ME+1 y ME+4 Stations Run: Aug 25-28, 2006 Magnetic field up to 4.0 Tesla Contents: Z-sensors R-sensors Proximity sensors Biaxial Inclinometers Temperature sensors Summary.

By cricket
(122 views)

What we need

What we need

Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS). What we need. Cherry picker with free access to ALL of the IP side of YE±1 This means both far and near sides

By karsen
(90 views)

ME+1/2 and ME+1/3 Positions

ME+1/2 and ME+1/3 Positions

ME+1/2 and ME+1/3 Positions. James N. Bellinger University of Wisconsin-Madison 20 January 2009. 2 Link Connections. The inner connection has new numbers from Celso

By twyla
(98 views)

Disassembly Steps by point.

Disassembly Steps by point.

Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS). Disassembly Steps by point. Access with the cherry picker to the position, 20’.

By temira
(119 views)

Status of the CSC Track-Finder

Status of the CSC Track-Finder

Status of the CSC Track-Finder. Darin Acosta University of Florida. CSC Sector Processor Prototype 2. 15 × 1.6 Gb/s optical link connections from CSC electronics. Xilinx Virtex-2 800 User I/O. Test Status. Basically all functionality has been successfully tested Optical links:

By bryson
(129 views)

Zian Zhu

Zian Zhu

Zian Zhu. Production Readiness Review at IHEP August 2, 2001. The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements. CSC Production at IHEP Beijing. Wire Tension and Pitch Machine. CSC Production at IHEP Beijing.

By vevay
(178 views)

What we need

What we need

Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS). What we need. Cherry picker with free access to ALL of the IP side of YE±1 This means both far and near sides

By rhonda-holden
(116 views)

CMS Muon System

CMS Muon System

CMS Muon System. Guenakh Mitselmakher University of Florida. Muon detectors. Barrel DTs and RPCs. Endcap CSCs and RPCs. - 250 DTs coupled with RPCs - 468 CSCs in 4 stations (ME4/2 descoped) - 3 stations of Endcap RPCs (REs) ( 4 th RE station and η > 1.6 descoped).

By jerry-jefferson
(133 views)

CMS/CSC 2004 Beam Test

CMS/CSC 2004 Beam Test

X. 5. A. CMS/CSC 2004 Beam Test. X5A area. HV/LV/Signal. Balcony. C. Room. Gas. HWD 162. -. 164. 2m. ~10m. Front view. 5 m. Beam. 3m. Gas. PP. ME3/2. HV/LV racks. ME2/2. Top view. Iron. ME1/2. Counting. Room. ME1/1. p,m. A. Lanaro.

By tarik-hoffman
(107 views)


View Me1 2 PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Me1 2 PowerPoint presentations. You can view or download Me1 2 presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.