'Hv side' presentation slideshows

Hv side - PowerPoint PPT Presentation


FHH HealthVault Integration Project

FHH HealthVault Integration Project

FHH HealthVault Integration Project. Iteration 4 Review Retrospective Iteration 5 Plan. November 30, 2009. Agenda. SPRINT REVIEW (2.3 M4) Review Actions from last meeting Project Timeline Demonstrate Iteration 4 Results SPRINT PLANNING (2.3 M5) Proposed Iteration 5 Objectives

By boyd
(149 views)

DT Hardware Status and Monitoring

DT Hardware Status and Monitoring

DT Hardware Status and Monitoring. Benvenuti INFN Bologna Muon Barrel Workshop 28/09/2010. A few items: High Voltage Low Voltage (connectors) Gas Analysis VDCs Monitoring/Alarms UX Maintenance Plans (Long Term) Out of ISR. HV Problems Summary.

By moshe
(102 views)

XRay Scan of TQF1 and Tmm3 chambers

XRay Scan of TQF1 and Tmm3 chambers

XRay Scan of TQF1 and Tmm3 chambers. TQF1 chamber’s difference from the usual ones. The resistive strips are NOT aligned with the read out strips. The chamber is divided in four different regions, as seen below.

By marion
(52 views)

ALLEGATO 2A

ALLEGATO 2A

SIDE A - CHAMBER WIRE MAP and HEDGEHOG BOARDS LIST. ALLEGATO 2A. RM003 BIL6A01. CHAMBER ID:. Side A. Read Out SIDE :. hh………. hh…………. hh………. hh………… hh…………. hh…………. 1. = missing wire slipped off from RO side;. Z. 2.

By vern
(110 views)

Results of the 2007 BLM hardware tests in LSS5

Results of the 2007 BLM hardware tests in LSS5

Results of the 2007 BLM hardware tests in LSS5. ..And a coast MD request for the 2008. Daniel Kramer for the BLM team. Standard BLMI ARC installation. Small low pass filter in the CFC input stage. HV ground cut here. BLMI. HV Power Supply. CFC is always close to the quadrupole.

By deiondre
(48 views)

Winter shutdown 08/09 Summary of HV interventions

Winter shutdown 08/09 Summary of HV interventions

Winter shutdown 08/09 Summary of HV interventions. Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009. HV status as of November 08.

By arlo
(234 views)

Criteria for SEM Location

Criteria for SEM Location

Criteria for SEM Location. Metering Philosophy under ABT regime. NTPC Station. Aux. Aux. Aux. M2. M1. B. A. C. D. E. C1. C2. ISGS -I. H. S2. G. S1. F F'. J J'. K K'. L. M. SEB-A. ISTS. S. T. U. W. V. N. O. P. SEB-B. R. ISTS. Q. SEB-B. SEB-A.

By yan
(98 views)

Per-Unit System

Per-Unit System

Per-Unit System. Per-Unit System. Actual value. Quantity per unit =. Base value of quantity. In the per-unit system, the voltages, currents, powers, impedances, and other electrical quantities are expressed on a per-unit basis by the equation:.

By kirsten-snow
(216 views)

CT failures as encountered in NDPL - A Dissertation

CT failures as encountered in NDPL - A Dissertation

CT failures as encountered in NDPL - A Dissertation. Types of Failures. Three types of CT failures have been noticed in the recent days at NDPL: Thermal failure of CTs. Burden failure of CTs. 4. Case 1: Thermal Failure of CT.

By kevin-vargas
(106 views)


View Hv side PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Hv side PowerPoint presentations. You can view or download Hv side presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.