SlideServe Logo
  • Browse
    • Recent Presentations
    • Recent Articles
    • Content Topics
    • Updated Contents
    • Featured Contents

    • PowerPoint Templates
    • Presentation
    • Article
    • Survey
    • Quiz
    • Lead-form
    • E-Book
  • Pro
  • Upload

Ga target - PowerPoint PPT Presentation


BLIP operations 03-8-11

BLIP operations 03-8-11

BLIP operations 03-8-11. Status – running at 117.5MeV BLIP weekly average beam increased to 100.9µA,. Operations increased to 166.4 hours, highest this year. Isotope production of Sr-82 has resumed, as secondary user has ramped up demand.

★ ★ ★ ★ ★

153 views • 3 slides



BLIP operations 03-29-11

BLIP operations 03-29-11

BLIP operations 03-29-11. Status – running at 117.5MeV BLIP weekly average beam reduced to 79.2µA purposely. Weekly operations somewhat decreased to 158.8 hours. Isotope production of Sr-82, Ge-68 and irradiation LBNE targets downstream of the isotope targets continues at reduced current.

★ ★ ★ ★ ★

167 views • 2 slides


View Ga target PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Ga target PowerPoint presentations. You can view or download Ga target presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.

  • English
  • Français
  • About
  • Privacy
  • DMCA
  • Blog
  • Contact
© 2026 SlideServe. All rights reserved.