40 likes | 179 Views
RAD hardening. Input connector. RAD-hard cable. Standard cable. Output connector. Half of dual HV supply or quarter of quad HV supply w breakout. Ion Pump: RAD area. Ion Pump: non-RAD area. Notes.
E N D
RAD hardening Input connector RAD-hard cable Standard cable Output connector Half of dual HV supply or quarter of quad HV supply w breakout Ion Pump: RAD area Ion Pump: non-RAD area
Notes • The Standard cable is the long cable from the rack-mounted HV supply to the area near the ion pump; it is plenum rated. • Where RAD-hard is not a requirement, the short segment is not used; alternatively, a full length RAD-hard cable can be used.
Break-out Standard HV cable Half of dual HV supply or quarter of quad HV supply w breakout Ion Pump Direct-to-pump using controller-provided break-out
Break-out 1:2 Breakout Box Half of dual HV supply or quarter of quad HV supply w/o breakout Standard HV cable Standard HV cable Ion Pump Indirect-to-pump using inline break-out box