1 / 13

The Status of MICE

1/13. The Status of MICE. V. Blackmore, University of Oxford, on the behalf of the MICE Collaboration. 2/13. About MICE. Ionisation cooling The Muon Ionisation Cooling Experiment (MICE) Key systems. 3/13. Ionisation Cooling.

saxton
Download Presentation

The Status of MICE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1/13 The Status of MICE V. Blackmore, University of Oxford, on the behalf of the MICE Collaboration

  2. 2/13 About MICE Ionisation cooling The Muon Ionisation Cooling Experiment (MICE) Key systems

  3. 3/13 Ionisation Cooling Cooling: reduction of the beam in 2, 4, or 6 dimensional phase space. Light-to-moderate cooling required for Neutrino Factory. Intense cooling required for Muon Collider. Begin with ionisation cooling. RF Require small at absorber  tight focus field Absorber Restores only longitudinal momentum , phase space reduced Reduces all momentum components Minimise Cooling Heating (Mult. Scat)

  4. 4/13 The Muon Ionisation Cooling Experiment (MICE) In construction at Rutherford Appleton Laboratory, UK. Full cell of ionisation cooling lattice. Test performance in different operational modes. Require relative precision of  use particle physics detectors. RF Measure Cool Absorber Reaccelerates muon, restoring lost energy Spectrometer Solenoid Measure Liquid hydrogen or solid Lithium Hydride. Reduces muon momentum vector 4T Solenoid field containing scintillating fibre tracker. Measures muon components:

  5. 5/13 Elsewhere...

  6. 6/13 JAI & MICE

  7. 7/13 Focus Coil

  8. 8/13 Focus Coil: Commissioning

  9. 9/13 Diffuser • Provide input beams of difference emittance (multiple scattering) • Sits in 4T field • Completely non-magnetic, air operated

  10. 10/13 Multiple Scattering Models MuScat New Model ELMS What do we trust? T. Carlisle Cooling Heating (Mult. Scat)

  11. 11/13 Step I Data Preliminary

  12. 12/13 nuSTORM: A Neutrino Factory “Test Facility” A. Bogacz & C. Tunnell 150 m Muons decaying away from detector. Low beta function, small magnets. Muons decaying towards detector. Large beta function, large momentum acceptance, large aperture magnets. 100kW

  13. Nom! Magnetic MICE soon. Preparation for Step IV in full swing. First single-particle emittance measurements of the MICE beam line. JAI has lots of responsibilities. MICE Step VI promises to be very exciting! 13/13 Conclusions

More Related