An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. cca-forum.org Server Migration David E. Bernholdt ORNL

  2. Current Situation • 2 servers • ~5 years old • Beginning to see unexplained failures • Hosted at LBNL • Basic support provided by LBNL systems staff • Routine operations managed by Allan, Armstrong, Bernholdt & Epperly

  3. Replacement System(s) • 2 servers on order • 1 CPU x 2 cores Intel • 4 GB RAM • 750 GB system disk • ~2 TB RAID-5 • 1 hot-spare disk for RAID • To be sited in ORNL Fundamental Research Enclave (FRE) • Professional sys admin support • Install, maintain OS installation (patches) • RHEL is ORNL-supported Linux distro • CCA team will have sudo access

  4. Migration of Current Capabilities • Mailing lists • Web server • Wiki • CVS repositories • Login capability • Migrated in staged fashion • DNS poses some challenges to staging • Use one new server

  5. Upgrading Capabilities • Configure second server for Xen virtualization • Want to be able to run multiple servers from the same hardware • Easy migration of Xen VMs to alternate hardware (eventually server1 will be repurposed as backup server) • Allow easier experimentation with new capabilities for cca-forum

  6. Upgraded Software Plan • CVS  Subversion • Static web  Plone • Wiki  Wiki? or Plone • Jabber • Experiments • GForge (SourceForge fork)

  7. cca-forum Migration (server1) October New hardware delivered & OS installed Setup Mailman November Transition Mailman Transition static WWW Transition wiki December Transition CVS, Logins Setup Plone, build new site January Setup Jabber Upgrade (server2) Pending release of RHEL 5 with Xen support January Setup Xen environment Migrate all content from server1 February Plone replaces static WWW in production Repurpose server1 as Xen-based backup server Experiment with Xen VM migration Approximate Timeline