An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activities Status and Plan for the week D. Giugni Monday Meeting 2012-09-3

  2. Plan of the week

  3. Plan of the week • WELDING • Last batch is at CERN!!! • HeX • Pipe pressure/leak testing should be finished today (Mito) • Michal should be back today. Next HeX’s set is A56 (then C78) (Michal) • Bellows are missing! Needs to produce at 2 sets (Mito + Jan) • Urgently needs to swage C56 and apply extension pipes to C56 + A78 (Michal) • Comments: Michal, Mito

  4. Plan of the week • Final assembly • A12 and C12 are completed but still need to be surveyed (see later) • C56 needs to wrap up LEMO and ER_Bundles Hans, Mito • A78: • Panel OSP A8 has been repaired… needs to be tested (Daniel) • Planned to go all the way through… (Valery) • Panel OSP A6 needs to replace the D-Bundle with a B-Bundle (Valery) • Comments: Valery, Hans, Maurice, Bryan and Daniel

  5. SURVEY • Problems with the Romer arm. Tool got aligned only last Friday • This week we plan to survey all the available backbones and verify whether the fix works. • Fix is then applied to all the backbones . • A12, C12, C56 and A78 are surveyed afterword and eventually fixed. Comments: Hans, Maurice Monday Meeting 2012-09-3

  6. DBM Bundles and NTC Sensors • Prototype Power+Signal Bundles have been soldered to the DBM PP0 board. Found a swap in the connectivity  Corrected! • ~10 NTC pigtails have been produced. THIS WEEK: Plan is not crystal clear: few options: • Produce the second DBM “production” bundle … but LEMO AWG36 pins are still missing… • Work out a routing solution for the NTC on any of the available nSQP and define the final lengths of the NTCpigtails and the connector position. • Move Olga to help Mito in the Pipes Lab. Monday Meeting 2012-09-3

More Related