1 / 18

IPC Working Group 27- Update on IT support for the IPC

IPC Working Group 27- Update on IT support for the IPC. Geneva June 7, 2012. Patrick Fievet Head of IT Operations and Support Section. Agenda. Updates on IPC-related IT support IPCRECLASS status IPC-Eforum functional evolutions Specification for the IPC scheme file. IPCRECLASS.

sallies
Download Presentation

IPC Working Group 27- Update on IT support for the IPC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section

  2. Agenda Updates on IPC-related IT support • IPCRECLASS status • IPC-Eforum functional evolutions • Specification for the IPC scheme file

  3. IPCRECLASS Opening for production use- STATUS mid-April 2012 • No problem reported during one and half month testing period • Opening for production use: Occurred as planed on April 12, 2012 • Missing some Residual Working lists (RWL)

  4. IPCRECLASS Current STATUS: • Some Offices did not update their Email contact details • IPC reclassification process blocked to avoid inappropriate feedback from IPCRECLASS • 2007, 2008 and 2012 RWL uploaded • Missing some residual Working lists (2009, 2010, 2011) • Reclassification Email submissions are piling up.

  5. IPCRECLASS Perspectives: • Awaiting MCD provision of RWL for IPC revisions 2009, 2010, 2011 • Unblock the email based submission part of the IPC reclassification process • Upload of working list for IPC 2013.01

  6. IPCRECLASS Reminder about current login access limitation: • Login name should be typed in upper-case • Passwordshould be typed in lower case • In case of failed login

  7. IPC E-FORUM IPC-IEF 2012 Functional evolutions

  8. IPC E-FORUM IPC-IEF 2012 Functional evolutions • Based on the reworked IPC-IEF 2012 • Detailed requirement and functional specifications available under project CE445 • Integrate into IPC IEF modified version of some IPC-calendar functionalities

  9. IPC E-FORUM IPC-IEF 2012 Functional evolutions overview • Action list tab with various filters • E-mail reminders for deadlines i.e. For the next action in a project action plan • Filter by technical field • New file formats allowed for annex submissions • E-mail notifications grouping • Rapporteur summary

  10. New file formats for annex submissions • Limited list of authorized file formats • Automatic PDF conversion for some only • New formats: • MS Excel, MS PowerPoint, • Various image formats (TIF, JPG, PNG…) • XML, ZIP • Direct submission in PDF format • ...And more if needed (but without automatic conversion to PDF) • Systematic virus checking

  11. New file formats for annex submissions

  12. Action List Tab

  13. Mailing list

  14. Rapporteur summary

  15. Rapporteur summary

  16. IPC-IEF 2012 functional evolutions • Demonstration (release not available outside WIPO) • Provisional plan for move into production: Week 25

  17. Specification of IPC XML scheme file • Specification of the current IPC XML scheme file • Available under QC010 project • Preparation for potential evolutions of the scheme • Preparatory steps for the FI/IPC/CPC parallel viewer • XML scheme files for CPC and FI as modifications of IPC scheme master files

  18. Update on IT support for the IPC • QUESTIONS? contact WIPO at claims@wipo.int

More Related