1 / 5

Shuttle In Sling Ready For Lift In VAB

TRANSPORTATION COST REDUCTIONS. START TIME CHANGE: $1,120,000 ELIMINATE CHOICE TRANSPORTATION: $1,260,000. Shuttle In Sling Ready For Lift In VAB. BREVARD TRANSPORTATION 432 SCHOOL BUS ROUTES. Goal : Increase 3 Run Routes. START TIME ADJUSTMENT CURRENT. Elementary 8:00-2:30

Download Presentation

Shuttle In Sling Ready For Lift In VAB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRANSPORTATION COST REDUCTIONS START TIME CHANGE: $1,120,000 ELIMINATE CHOICE TRANSPORTATION: $1,260,000 Shuttle In Sling Ready For Lift In VAB

  2. BREVARD TRANSPORTATION 432 SCHOOL BUS ROUTES Goal: Increase 3 Run Routes

  3. START TIME ADJUSTMENT CURRENT Elementary 8:00-2:30 High School 8:30-3:15 Middle School 9:15-4:00 PROPOSED +15 MINUTES Elementary 8:00-2:30 High School 8:45-3:30 Middle School 9:30-4:15

  4. START TIME ADJUSTMENTS RESULTS 28 BUS ROUTES X $40,000 ROUTE = $1,120,000 REDUCTION

  5. ELIMINATE CHOICE TRANSPORTATION ELEMENTARY 24 BUS RUNS $480,000 SECONDARY 39 BUS RUNS $780,000 63TOTAL CHOICE RUNS 63 Bus Runs x $20,000 = $1,260,000 REDUCTION

More Related