1 / 24

DIVISION OF CITY SCHOOLS City of Mandaluyong

DIVISION OF CITY SCHOOLS City of Mandaluyong. Division Plan for CY 2013. Type of Learners:. In-school : 33,859 Elementary/kinder 18,193 Secondary 174 Elem. SPED 21 Sec. SPED 3,027 Jose Fabella Memorial School (Special School).

rusk
Download Presentation

DIVISION OF CITY SCHOOLS City of Mandaluyong

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DIVISION OF CITY SCHOOLS City of Mandaluyong Division Plan for CY 2013

  2. Type of Learners: • In-school: • 33,859 Elementary/kinder • 18,193 Secondary • 174 Elem. SPED • 21 Sec. SPED • 3,027 Jose Fabella Memorial School (Special School)

  3. The secondary schools have a PCR of 64.67 which means that it does not meet R.A. 7880, schools with severe shortage of classrooms. • The PCR of Elem. Schools is 54.15 which means that it does not meet the R.A. 7880 even with double shifting. ACCESS PROBLEM ANALYSIS

  4. GER (Elem.) has increased to 88.38 in 2011, however it is below the PDP target of 108.27%. • GER (HS) has increased to 81.32 in 2011 , however it is below the PDP target of 86.86.

  5. Causes: • In the elementary the enrolment of the entire Division increased from 29,923 to 31,308 (2009-2011). • The enrolment for secondary schools increased from 16,270 to 17,857 (2009-2011) • A significant number of learners are enrolled in Private Schools and public schools in nearby divisions. • Transfer of learners to other public schools in nearby divisions and provinces

  6. ACCESS Strategies: • Request to the LGU Executives for the construction of medium rise building in Andres Bonifacio Integrated School and Jose Fabella Memorial School with buildable space. • Establishment of new School Annexes and Integrated Schools(1 elem. School and 1 Integrated School) • Conduct of school mapping to determine the school-age children. • Conduct of advocacy campaigns.

  7. QUALITY • Increase/decrease of NAT MPS for elementary has been erratic in the last three years and way below the 75% National MPS target.

  8. QUALITY • Increase/decrease of NAT MPS for secondary has been erratic in the last three years and way below the 75% National MPS target.

  9. QUALITY Causes: • Low reading performance as manifested in Phil-IRI results. • Teacher competence and capacity in managing different types of learners, innovative teaching style and strategies and curricular reforms. • Frequent suspension of classes due to heavy rains and typhoons • Existence of 2 shifts in all schools divisions in some schools divisions • Overlapping of extra-curricular activities across levels (attending trainings, workshops, celebrations, contests and meetings) • Frequent floodings and other geophysical problems in four schools. • Instructional supervisory style/strategies of School Heads and Supervisors. • Absence for Incentive and Award System for high performing learners

  10. QUALITY Strategies: • Roll out of PASBE - SBM ACCESs • Implementation of K to12 Curriculum • Implementation of strategic reading program in all schools. • Identification of least mastered skills in NAT and provide appropriate learning activities for remediation/reinforcement • Enhancement of Assessment/Testing Program of the Division and Schools • Effective and efficient implementation of the K-12 Curriculum and other reforms • Development of learning modules as a catch-up instruction during suspension of classes/ holding of make-up Saturday classes. • Establishment of additional Special Science Elementary Schools • Enhancement of library hubs, eClassrooms and ICT Integration in teaching. • Creation of the learning resource portal (division and school websites) • Regulation of Co-Curricular activities for learners and add-on tasks for teachers division heads, supervisors and principals. • Capability building programs for instructional managers, school heads and teachers. • Launching of Incentive and Award System for High Performing Learners

  11. EFFICIENCY • Elem. Schools have an insignificant drop-out rate for the last three year ranging from 0.67% to .0.49% whereas HS have a range of 5.95% to 2.13%. It can be noted that Elem. and HS have decreasing drop-out rate for the last three years. • Completion Rate for both elementary and secondary is below the PDP target. (93.8% elem. and 77.97% HS) • CSR for both elem. and HS is above the PDP targets.

  12. EFFICIENCY Causes: • Frequent floodings and other geophysical problems. • Teacher competence and capacity in managing different types of learners, innovative teaching style and strategiesand curricular reforms • High cost of living resulting to irregular attendance of learners. • Parental involvement

  13. EFFICIENCY Strategies: • Convergence with barangay and LGU officials. • Launching of Eco-Savers Program • Institutionalization of Greening Program. • Implementation of Disaster and Risk Reduction Program. • Capability building programs for teachers. • Establishment of additional Open High Schools. • Effective and efficient implementation of the K-12 Curriculum and other reforms • Increasing the number of beneficiaries for the Feeding Program. • Strict adherence to no collection policy and regulations on the requirements of school projects and other co-curricular activities. • Institutionalization of parents support system/Guidance and counseling services to learners. • Maintain Medical and Health Services to less privilege learners. • Recommend additional beneficiaries for the 4Ps Program. • Widen coverage of relevant ALS Livelihood Programs. • Request for additional slots for GASTPE grantees

  14. GOVERNANCE • Absence of Plantilla Items for administrative and financial staff of the Division Office and Schools. • Full implementation of eBEIS, LIS. However, some ICT Support systems like LRMDS and AMS are still to be implemented. • Information dissemination process with in the division needs upgrading. • Absence of permanent ADR committees in the division and schools. • The division is only on the start up stage of the implementation Child Protection Policy. • School Audit Team is no yet in placed. • Preparation of Work and Financial Plan and Annual Procurement Plan is for compliance only • Incentive and award system for School heads, supervisors, teachers and non-teaching personnel needs enhancement. • Consultative and Support System between and among DepEd Officials, Local School Board and Congressional Office is very evident.

  15. GOVERNANCE Causes: • Division office has no authority to create and fill plantilla items • Continuing support funds for internet connections not sustained • LRMDS and AMS implementation is still on process. • Resistance to change and slow adaptability of division and school officials and personnel ICT-enhanced processes. • Low level of awareness on ADR law and processes • Central Office had just released the DepEd Order on Child Protection Policy • Low level of awareness on the significance of School Audit Teams • Low level of expertise in the preparation of Work and Financial Plan and Annual Procurement Plan • Incentive and award system is not well publicized

  16. GOVERNANCE Strategies: • Wait patiently for the approval of the Rationalization Plan • Request authority to fill for vacant non-teaching items • Include allocation of the salaries of Guards/ Utility Workers / Clerks of the division office and schools in the SEF budget. • Follow strictly the calendar of the implementation of LRMDS and AMS • Utilization of the Division website for the paperless info dissemination, transactions, and reports. • Conduct capability building for ADR and Accounting and Auditing Processes, Rules and Regulations among the division and school officials and concerned teachers. • Conduct of Orientation on DepEd on Child Protection Policy. • Retrain division and school officials on the preparation of Work and Financial Plan and Annual Procurement Plan • Convene the division and school Incentive and Awards Committees • Continuous interfacing between and among the DepEd Officials, Local School Board and Congressional Office.

  17. GOALS • Expand and improve participation and absorptive capacity of all schools and learning centers (ACCESS & EFFICIENCY) • Achieve proficiency level of performance in all learning areas/strands for all levels (QUALITY) • Ensure that the learning competencies are responsive to the fast-changing environment (QUALITY) • Ensure synergy of support systems in the management of educational services (GOVERNANCE)

  18. GOALS OBJECTIVES: • Increased GER, NER, AIR, NIR by 2% - 5% from the previous year • Increased MPS in NAT by 2% - 5% • Increased CSR, CR & GR by 2% - 5% • Decreased SDR, SLR, Failure & Repetition Rates to 0.5% in the elementary level and to 2% in the secondary level • Increased efficiency in management and operations (frontline services and other related functions)

  19. CY2013 Programs/Activities/Projects

  20. Budget Allocation

More Related