1 / 17

CARE And Design Studies

CARE And Design Studies. Susan Smith (ASTeC) . Particle Physics Accelerator R&D Activities In The European Framework 6 Programme. Content. CARE JRAs Networks ELAN Design Studies LCDS. http://esgard.lal.in2p3.fr /. CARE. JOINT RESEARCH ACTIVITIES. Infrastructures and Projects.

rupali
Download Presentation

CARE And Design Studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CARE And Design Studies Susan Smith (ASTeC) Particle Physics Accelerator R&D Activities In The European Framework 6 Programme LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  2. Content • CARE • JRAs • Networks • ELAN • Design Studies • LCDS LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  3. http://esgard.lal.in2p3.fr/ LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  4. CARE LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  5. LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  6. JOINT RESEARCH ACTIVITIES LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  7. Infrastructures and Projects LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  8. NETWORKS LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  9. LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  10. Current Status LCABD Through Manchester University 70kEuro/35kEuro Kick Off meeting Frascati 4th -6th May 13:00 LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  11. Plans for the Frascati Meeting: 1st day (Tuesday May 4 ) Plenary 9h-13h: Design Study for a future GLC ITRP (choice of technology for a GLC) Presentation from WP (including connections) Parallel + common WP: 5 rooms needed ? Welcome Drink 18h30 2nd day(Wednesday May 5 ) Parallel + common WP Critical discussion of our strategy (plenary afternoon) Dinner 3d day(Tuesday May 6 ) Summaries Steering Committee meeting LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  12. CERN DESY LOI LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  13. LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  14. LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  15. LC Design Study 1. Management Eckhard Elsen (DESY) eckhard.elsen@desy.de Gilbert Guignard (CERN) gilbert.guignard@desy.de 2. BDS Susan Smith (CCLRC) s.l.smith@dl.ac.uk 3. DR Suzanne Guiducci (INFN-LNF) susanna.guiducci@lnf.infn.it 4. Pol. e+ source Achim Stahl (DESY) achim.stahl@desy.de 5. Diagnostics Grahame Blair (RHUL) blair@pp.rhul.ac.uk 6. Lumi stab. Studies Daniel Schulte (CERN) daniel.schulte@cern.ch 7. Metrology & Stab. Yannis Karyotakis (LAPP, Fr) karyotakis@lapp.in2p3.fr 8. GAN tba LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  16. LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

  17. University Input Phil Burrows is coordinating the technical input Manchester (Roger Barlow) is acting as the Participating Organisation. Others will be contractors or associates of Manchester * brief description of task with milestones and deliverables * contact person * integrated # person months of effort over the DS period (3 years, starting 1/1/05) * cost of the integrated person months (3) * cost of equipment (3) * cost of travel (3) * total cost of task (3) LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith

More Related