SHORT TERM OPEN ACCESS CASE STUDIES

SHORT TERM OPEN ACCESS CASE STUDIES. STOA CASE - 1. JINDAL(KPTCL) to MSEDCL 100 MW for 31 days from 0000 to 2400 hrs. STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS. KAR. AP. CUSTOMER: PTC. TRADER: PTC. INJECTING UTILITY JINDAL. WR GRID. MSEDCL.

roxy
Download Presentation

SHORT TERM OPEN ACCESS CASE STUDIES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHORT TERM OPEN ACCESS CASE STUDIES

  2. STOA CASE - 1 JINDAL(KPTCL) to MSEDCL 100 MW for 31 days from 0000 to 2400 hrs.

  3. STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP CUSTOMER: PTC TRADER: PTC INJECTING UTILITY JINDAL WR GRID MSEDCL DRAWEE UTILITY MSEDCL HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING REGIONAL LINK SR-WR INTERVENING STATE TRANSMISSION UTILITY KPTCL CAPACITY APPROVED 100 MW JINDAL DAILY PERIOD 0000 HRS – 2400 HRS DATE OF COMMENCEMENT 01-03-06 DATE OF EXPIRY 31-03-06…

  4. STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP LOSSES IN KPTCL 4.06% EXPORT AT JINDAL 100 MW WR GRID MSEDCL AT ER-SR PERIPHERY 95.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.50% AT SR-WR PERIPHERY 92.5 MW LOSSES IN WR 4% MSEDCL RECEIVES 88.8 MW JINDAL

  5. STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 1000 FOR KPTCL WR GRID MSEDCL HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 757.04 FOR KPTCL JINDAL TOTAL TRANSMISSION CHARGE PER UNIT 12.5/. Ps…

  6. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF JINDAL,KPTCL – MSEDCL OF PTC (100 MW)

  7. STOA CASE - 2 KAYAMKULAM CCGP, NTPC to PSEB 150 MW for 31 days on Round the Clock basis

  8. SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR CUSTOMER: NVVNL TRADER: NVVNL HVDC BACK TO BACK AT VINDHYACHAL IN WR INJECTING UTILITY KYCPP,KSEB DRAWEE UTILITY PSEB WR INTERVENING REGION WR HVDC BACK TO BACK AT BHADRWATHI IN WR • INTERVENING REGIONAL LINK • SR-WR • WR-NR INTERVENING STATE TRANSMISSION UTILITY KSEB KERALA CAPACITY APPROVED 100 MW DAILY PERIOD 0000-2400 HRS DATE OF COMMENCEMENT 01-05-06 DATE OF EXPIRY 31-05-06 KAYAMKULAM CCGT(NTPC)

  9. SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR EXPORT AT KYCPP BUS 150 MW HVDC BACK TO BACK AT VINDHYACHAL IN WR WR LOSSES IN KERALA 0.75% AT KERALA PERIPHERY 148.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.12% AT SR-WR PERIPHERY 144.3 MW LOSSES IN WR 4.0% KERALA AT WR-NR PERIPHERY 138.5 MW LOSSES IN NR 3.0% PSEB RECIEVES 134.4 MW KAYAMKULAM CCGT(NTPC)

  10. SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION NR • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 3000 FOR NRLDC • Rs 1000 FOR KSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR WR HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 345.1 FOR CTU-WR • Rs 560.09 FOR WR-NR LINK • Rs 521.37 FOR CTU-NR • Rs 672.07FOR KSEB KERALA TOTAL TRANSMISSION CHARGE PER UNIT 16.8/. Ps… KAYAMKULAM CCGT(NTPC)

  11. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)

  12. PAYMENT TERMS FOR JINDAL AND KPTCL • AS PER THE STOA TRANSACTION DAY AHEAD SCHEDULE WILL BE FINALISED. • IN REAL TIME OPERATION, IF JINDAL INJECTS MORE THAN 105% OF THE SCHEDULE IN ANY 15 MINUTE TIME BLOCK THEN PAYMENT WILL BE RESTRICTED TO 105% OF THE SCHEDULE AS PER SR UI RATE.

  13. PAYMENT TERMS FOR JINDAL AND KPTCL MORE THAN 101% OF THE SCHEDULE IN A DAY THEN PAYMENT WILL BE RESTRICTED TO 101% OF THE SCHEDULE. (CALCULATING AS PER SR UI RATE)

  14. PAYMENT TERMS FOR JINDAL AND KPTCL IN REAL TIME OPERATION, IF JINDAL INJECTS BETWEEN 100% TO 95 % OF THE SCHEDULE IN ANY 15 MINUTE TIME BLOCK THEN JINDAL HAS TO PAY AS PER SR UI RATES LESS THAN 95% OF THE SCHEDULE IN ANY 15 MINUTE TIME BLOCK THEN JINDAL HAS TO PAY 110% OF SR UI RATE

  15. PAYMENT TERMS FOR KAYAMKULAM,NTPC AND KSEB IF ACTUAL GENERATION IS MORE THAN SCHEDULE IN A DAY THEN NO PAYMENT WILL BE PAID TO KAYAMKULAM, NTPC. IF ACTUAL GENERATION IS LESS THAN SCHEDULE IN A DAY THEN KAYAMKULAM, NTPC HAS TO PAY VARIABLE COST OF PLANT OR AVERAGE DAY UI RATE OF SR WHICHEVER IS HIGHER.