三、 综合单价

三、 综合单价. 编制项目表,编制文字说明. 人工. 人工费. 编号. 计量单位. 消耗指标. 综合单价. 材料费. 材料. 机械费. 机械. 单 价. (一)、编制方法. 用如下图示:. 项目名称. 管理费. 利润. 风险费用. 编制项目表,编制文字说明. 人工. 人工费. 定额编号. 计量单位. 消耗指标. 基价. 材料. 材料费. 机械. 机械费. 单 价. (定额基价编制方法 ). 用如下图示:. 项目名称. 人 工 单 价. (二)、 综合单价的确定. 1 、人工单价

Download Presentation

三、 综合单价

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 三、 综合单价

  2. 编制项目表,编制文字说明 人工 人工费 编号 计量单位 消耗指标 综合单价 材料费 材料 机械费 机械 单 价 (一)、编制方法 用如下图示: 项目名称 管理费 利润 风险费用

  3. 编制项目表,编制文字说明 人工 人工费 定额编号 计量单位 消耗指标 基价 材料 材料费 机械 机械费 单 价 (定额基价编制方法 ) 用如下图示: 项目名称

  4. 工 单 价 (二)、 综合单价的确定 1、人工单价 (1)人工单价:是指一个建筑安装工人一个工作日在预算中应计入的全部人工费用。 (2)组成内容: 标准工资 基本工资 工资性津贴 附加工资 辅助工资 劳动保护费

  5. KA KB KC b A B C (3)、人工单价的确定: • 日工资=日基本工资+附加工资+辅助工资+劳保费 其中:基本工资=标准工资+工资性津贴 标准工资=地区一级工资标准*工资等级系数KB • B级工资等级系数KB的确定方法: KB= KA+( KC- KA)*b 式中: KA ——A级工资等级系数 KC——C级工资等级系数(C=A+1) b ——B级工与A级工的级差(b=B-A)

  6. 供应价 材 料 价 格 运费 调车费 装卸费及附加费 合理损耗费 2、材料价格的确定 (1)材料价格:是指材料(包括构件、成品及半成品等)从其来源地或交货地点到达施工工地仓库后的出库价格。 (2)组成: 材料原价 供销部门手续费 包装费 运杂费 采保费

  7. 3、机械台班单价的确定 (1)机械台班单价:是指一台施工机械,在正常运转条件下一个工作班中所发生的全部费用。 (2)组成内容: 折旧费 大修理费 第一类费用 (不变费用) 机 械 台 班 单 价 经常修理费 安拆费及场外运费 人工费 第二类费用 (可变费用) 燃料动力费 养路费及车船使用税

  8. (3)、影响机械台班单价的因素: • 施工机械的价格; • 机械使用寿命; • 机械的使用效率和管理水平; • 政府征收税费的规定等。 4、综合单价的编制 综合单价=人工费+材料费+机械费+管理费+利润+风险费用 人工费=人工消耗量*人工单价 材料费=∑(材料消耗量*材料预算价格)+其他材料费 机械费=∑(机械台班消耗量*机械台班单价) 综合单价 管理费=取费基数*费率 利润=取费基数*费率 风险费用