River Loads

DESCRIPTION

The “Mallard Island Study” Nicole David, John Oram, Lester McKee, SFEI Russ Flegal, UCSC. River Loads. Sampling Location. Sampling. Hg v SSC (all data). Influence of Salinity. Suspended Sediment and Hg Loads. Organic Contaminants.

1 / 9

Download Presentation

River Loads

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The “Mallard Island Study” Nicole David, John Oram, Lester McKee, SFEI Russ Flegal, UCSC River Loads

  2. Sampling Location

  3. Sampling

  4. Hg v SSC (all data)

  5. Influence of Salinity

  6. Suspended Sediment and Hg Loads

  7. Organic Contaminants *four samples collected in May 2003 had TPCB concentrations ranging from 890 – 6700 pg/L

  8. Preliminary Loading EstimatesLoads are preliminary and were estimated using Regression (REG) and Flow Weighted Mean Concentrations (FWMC). Preliminary estimates of errors are approximately ± 25%.

  9. Project Schedule • Summer/Fall 2005: $51k - Write “Final report” for data collected during WYs 2002, 2003, 2004, and 2005 • WY 2006: $60k - Collect wet season “first flush data and update report • WY 2007: $0k - Use RMP contingency funds if necessary to sample a large flood • WY 2008: $0k - Use RMP contingency funds if necessary to sample a large flood • WY 2009: $120k – Sample and report on all floods for the season in addition to reinterpreting the first 8 years of chemical data and 15 years of suspended sediment data