PRESENTATION OUTLINE

LBT ADAPTIVE SECONDARY MECHANICS CONSTRUCTION STATUS REPORT Arcetri, 21.02.2005 D.Gallieni (ADS International). PRESENTATION OUTLINE. the adsec construction process where we are: mechanical components manufacturing and integration unit #1 integration detailed plan shell handling issues

Download Presentation

PRESENTATION OUTLINE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT ADAPTIVE SECONDARYMECHANICS CONSTRUCTION STATUS REPORTArcetri, 21.02.2005D.Gallieni (ADS International)

  2. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 PRESENTATION OUTLINE • the adsec construction process • where we are: mechanical components manufacturing and integration • unit #1 integration detailed plan • shell handling issues • installation procedures and tools • interfaces and maintenance issues • conclusions

  3. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005

  4. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 THE ADSEC CONSTRUCTION PROCESS • ADS: • mechanical compoents manufacturing • integration (structure + optics) • magnets gluing • MICROGATE: • ( electronics manufacturing ) • integration of the electronics on the optomechanical assembly • electromechanical testing • ARCETRI: • optical testing • calibration

  5. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION - WHERE WE ARE • CONSTRUCTION: • all the components for BOTH units have been manufactured together • items still missing: • coldplate #2 (pending the measure of its backplate holespattern) • about 500 magnets (deliverd 100/month) • about 200 actuators inclding spares (new machining run after LBT672a is completed) • hub #1 and #2 • hexapod #2 ( ? ) • LBT672a INTEGRATION STATUS: • actuators coil winding - DONE, for both units • magnets integration - DONE • crates integration - DONE, for both units • BP-CP “dry integration” and alignment check - ONGOING

  6. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION WHERE WE ARE • ACTUATORS: • 1200 actuators produced and integrated

  7. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION WHERE WE ARE • SHELL SAFETY: • bias magnet installed into each coil bobbin  1.4 g passive pulling force

  8. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION WHERE WE ARE • PERMANENT MAGNETS: • 800 magnets produced and integrated • efficiency = 0.55  0.61 N/sqrt(Watt) MMT336 = 0.35 N/sqrt(Watt)

  9. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION WHERE WE ARE • CRATES: • 6 crates integrated • PCB heat sinks ready for both units

  10. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION WHERE WE ARE DISTRIBUTION BOARDS INTERFACE CHECK

  11. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 LBT672 CONSTRUCTION WHERE WE ARE LBT672a PRE INTEGRATION

  12. ADS PLANNING LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005

  13. ADS PLANNING LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005

  14. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 SHELL HANDLING

  15. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 INTEGRATION STAND

  16. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 TRANSPORT STAND

  17. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 TRANSPORT STAND 2

  18. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 INSTALLATION

  19. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 INTERFACES • HUB INTERFACES: • mechanical coupling to swing arm 4 x 4 screwed flanges • adsec & hexapod J-box (150x300mm) • cooling line manifolds (IN & OUT) • 11 lit/min • DT = 2.6 C • TIN issue (cool first coldplate) • DP < 1 bar

  20. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 MAINTENANCE • OPTIONS: • dismount the whole hub and operate into the clean room • time issue • on telescope activity (gap gleaning) • shell centring issue

  21. LBT Adaptive Optics meeting Arcetri - Feb. 21-24, 2005 CONCLUSION(S) • INTEGRATION: • started “full steam” • […]