1 / 37

Theater Support Vessel

Theater Support Vessel. LTC Philip Schoenig. 27 January 2004. A dvanced C oncept T echnology D emonstrator. PEO CS&CSS Organization. PEO COL (P) Patrick O’Reilly. DPEO Ms. Pat Plotkowski (Intm). Force Projection ----- COL Gino Dellarocco. Measurement, Electric

romeo
Download Presentation

Theater Support Vessel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Theater Support Vessel LTC Philip Schoenig 27January2004 Advanced Concept Technology Demonstrator

  2. PEO CS&CSS Organization PEO COL (P) Patrick O’Reilly DPEO Ms. Pat Plotkowski (Intm) Force Projection ----- COL Gino Dellarocco Measurement, Electric Power, & Protection ----- COL Mark Jones Chief of Staff COL Phil LoSchiavo Obj Force Office Mr. Bill Madro Operations Chief Business Manager Mr. Arthur White Army Watercraft Systems LTC Brian Winters Human Resources Ms. Mary Schmidt Large Power Sys (USAF) VACANT Bridging LTC Thomas Svisco Medium Power Systems LTC John Peterson (FY04) Tactical Vehicles ----- COL Robert Groller Const Equip. / Mat’l Handling Equip. Mr. Joel Wagner (Actg.) Small Power Sys (USMC) LtCol Robert McKenzie Force Sustainment Systems LTC Lawrence Silas Physical Security Equipment LTC Eugene Stockel Heavy Tactical Vehicles LTC Lisa Schleder-Kirkpatrick Petroleum & Water Systems LTC Fransisco Espaillat Test, Measurement, & Diagnostic Eq. Mr. Richard Paul Medium Tactical Vehicles Mr. David Dopp Recovery Mr. William White Light Tactical Vehicles LTC Kevin Peterson Sets, Kits, Outfits, & Tools Mr. Wayne Schaaf (Actg.) Trailers LTC John Myers

  3. 15 Programs $1,268.3 M (FY02-09) PM Army Watercraft Systems PM LTC Brian Winters 586-574-8830 DPM-Current Systems Mr. Jim Folkl 586-574-8829 DPM-TSV Mr. Mick McGee 586-574-5240 Admin Assistant Peggy Bechtel 586-574-8829/8830 Admin Assistant Erin Wood 586-574-5240 Technical Mgt Don Paskulovich 586-574-7641 TSV ILS Chanda Smith 586-574-8842 (Matrix) Heavy Boats Support Systems Causeways and Harbor Craft Future TSV Tracy Mitchell 586-574-5375 Current TSV Kathy Lytle 586-574-3953 Program Development Bob Noel * 586-574-8834 Ian Valentine 586-574-4182 MAJ Simpson* 586-573-2772 Pat Papa 586-574-5210 MAJ Oderkirk 586-574-8844 MCS Fred Williams 586-574-6833 Kerry Riese 586-574-7926 Brenda McKinney 586-573-2285 LSV Reprocure Colleen Helmick 586-574-7918 HSV-X1 Fred Chapin 586-574-8040 Ali Baziari C4I Upgrade Doug Belanger 586-574-6081 LSV Mod Bob Noel * 586-574-8844 CMF Steve Dull 586-574-8770 TSV-1X James Stephens* 586-573-2245 HCCC MAJ Simpson* 586-573-2772 Small Tug Terry Lauscher 586-574-8141 LCU 2000 Phyllis Pope 586-574-3931 • Core • Civilian - 26 • Military - 4 TSV-ACTD Chris Maluchnik 586-574-7664 Maritime Integrated Training System MAJ Simpson* 586-573-2772 LCM8 Mod II Toniya King 586-574-6059 BD-115T James Stephens* 586-573-2245 Large Tug Jeff Darnell 586-574-6217 RIBS TARDEC * Assigned to TSV Team - still working Current Fleet Programs Watercraft Systems Integrator CW3 Garry Miller

  4. ACTD Background • First ACTDs initiated in Fiscal Year 1995 • ACTD structure and execution focus has continued to change since the start: • Adapted to and drives the DoD acquisition reform initiatives • A more defined selection process • Annual Call for proposals • Concentrated Breakfast Club review • Approval process culmination in JROC prioritization & approval • Major focus and shift since program inception on joint warfighting issues • Significant involvement of Combatant Commanders • ACTD growth mirrors development & prominence of Combatant Commanders

  5. Anatomy of an ACTD • Addresses an important military need with mature technology • Provides a technology solution with demonstrated CONOPS • Evaluates a solution in field demonstrations conducted by warfighters • Usually joint, often combined/coalition forces or organizations • Multi-agency • Developer service/agency: Technical Manager • Sponsoring Combatant Commander: Operational Manager • Lead Service/Agency(Title 10 Authority): Transition Manager • Two-Four Years, or less, to final demonstration/prototype • Two year support for residuals and transition • Multiple Funding Sources • OSD typically provides 10-30% of the funding

  6. ACTD Goals • Develop Military Utility Analysis of concepts & technologies • Early & inexpensive • Does the concept make sense? • Done by the users • Provide experience/insight for an informed acquisition decision • Establish real requirements • Explore joint and coalition solutions • Develop real CONOPS • Try before buy • Find the 80% solution • Aim for early transition to acquisition or sustainment • User and service decision • Accelerate the acquisition process • Sustain software products • Leave a “go to war” residual where appropriate including: • ACTD products that can be used immediately • Viable CONOPS

  7. ACTD Objectives for Success • Formal success objectives • Transition to service/agency sponsored Program of Record • Satisfy operational requirement with residual • Confirm technology appropriate/inappropriate for military utilization • Operational success objectives • Develop CONOPS/operational requirements employing ACTD technologies • Contribute technical elements into existing /new programs • Informal failure indicators • Overlook technologies to solve known military problems • Allow spiraling technologies/requirements to postpone transition

  8. ACTD Roles in Technology Transition • Promote joint requirements lacking service “critical mass” • Demonstrate military utility for established communities • Mitigate risk • Try before buy • Provide rapid prototypes of leap-ahead technologies • Accelerate transition by testing technical solutions & concepts • Introduce warfighters to hands-on, mature technologies • Spur concurrent development of CONOPS & system requirements • Overcome institutional reluctance

  9. TSV ACTD Organizational Structure • Deputy Undersecretary of Defense, Advanced Systems & Concepts (AS&C) Chairs the TSV ACTD Oversight Group • US Army is Lead Service • Central Command (CENTCOM) is the Operational Manager • PM Force Projection is the Technical Manager & the Transition Manager • Combined Arms Support Command (CASCOM) is the Requirements Integrator and the Deputy Operational Manager • Army Test & Evaluation Command (ATEC) provides operational test and evaluation support • Naval Surface Warfare Combatant Craft Directorate (NSWCCD) assists in R&D and is technical tester

  10. TSV ACTD Concept • Lease Commercial Vessels - TSV-1X and HSV-X1 • Installation of Military Modifications / Applications • Suitability • Availability • Location • Demonstrations w/multiple exercise scenarios • Operational Use • Test and Evaluation • Military Utility Assessment • Technical performance • Operational Capability • Operational Affordability • Evaluate Life-cycle Cost issues

  11. High Speed Vessel Data Collection • Continue collecting experiences and lessons learned: • HSV-X1, USAV Joint Venture • TSV-1X, USAV Spearhead • USN HSV-X2, Swift • USMC WESTPAC EXPRESS • Tirrenia Aries - Propulsion Test

  12. TSV Operational Tenets/Requirements • Increase Throughput: Soldiers, Equipment and Leaders Go Together • Reduce Battlespace RSO&I • Increase Survivability: Threat Identification System • Active and Passive Capability • to Defeat Rockets/Missiles • Increase Situational Awareness: Army Crewed and Armed • Enroute Mission Planning • Joint Interoperable Communications • Increase Responsiveness: Rapid Worldwide Responsiveness • Access to Austere Ports • Increase Access Points within the Theater • Improve Closure Rates: 36 to 50 knots (~31 to 58 mph) • Sustained Deployment Momentum • Offset/Complement Intra-theater Airlift • Provide Intermodal Operations Capability • Shallow Draft (less than 15 feet) Speed Precision Knowledge Increases Ports Accessible To JTF Commander By a Factor of Five

  13. TSV ACTD Objectives • Conduct high-speed, intra-theater lift of forces and equipment • Establish and operate waterborne intra-theater lift for upload and discharge operations for containerized and palletized cargo • Conduct Inland Waterways and Riverine Operations, Joint Logistics Over the Shore (JLOTS) & augment Amphibious Operations • Integrate existing and emerging technologies

  14. TSV Impact on RSO&IReduced Requirements for the AOR RECEPTION STAGING ONWARD MOVEMENT INTEGRATION C-17 (Personnel) APOD + + + JLOTS Redefining RSO&I for Future AOR’s Staging Area SPOD LSV (Equipment) AOR AOR CONUS/ Theater • Notional Force Structure Required: • LOGCAP • Truck Company • Cargo Transfer Company • QM Company (Force Provider) • Security Elements • Medical Support • LSV • Ordnance Support • Medium Boat Company • Aircraft Maintenance Support Force Structure Required: TSV Battalion RS O &I • Theater Transportation Command • Admin/Finance Support • Port Movement Control • Engineer Support • Movement Control Company • QM Battalion • Transportation Harbormaster Ops • Terminal Operations • Rail Operating Company • Airfield Control Combat unit with its equipment Enroute Mission Planning Enhanced C4I *Combat Ready*Full Armor *Full Ammunition*Full Fuel *Full Communications

  15. TSV C4ISR ACTD Strategy • C4ISR IPT Concept - Integration of existing / emerging C4ISR technologies into platforms • HSV-X1 • TSV-1X • Surrogate Platforms • Benefits • Demonstrate capabilities of various technologies for potential insertion into the OTSV • Identify C4ISR implications to MOS • Exploit operational capabilities of TSV • CONOPS, Tactics Techniques & Procedures (TTPs), Lessons-Learned • Risk mitigation • C4ISR Priority • KU Band Capability and SIPRNET • Tactical Communications • Enroute Mission Planning and Rehearsal • Sensor Technology (warning systems FLIR, etc) • Special Mission Equipment • Self Defense Capabilities (Remote Weapons, hard/soft kill)

  16. TSV C4ISR ACTD Path Forward • Path Ahead (120 Days) • Continue coordination with the CENTCOM and PACOM G-6 to determine mission requirements and exercise scenarios • Upgrade existing HSV C4ISR Architecture to provide EMPR capability • Install Secure Enroute Communications Package - Improved (SECOMP-I) and Enroute Mission Planning and Rehearsal (EMPR) capability into the TSV-1X • Determine supportability and training requirement for HSV and TSV • Provide contractor maintenance and training support for both the HSV and TSV Develop • Measures Of Performance (MOP) • Measures Of Effectiveness (MOE) • Test Plan

  17. Army Vessel Comparison Reached 48 knots during Sea Trials HSV-X1 TSV-1X Length O/A Beam O/A Draft Speed Engines Waterjets 95.47m (313ft) 26.60m (87.3ft) 4m (13.12ft) ~ 35kts (40.3mph), loaded 4 x CAT 3618 (38,621HP) 4 x Lips 120E 97.22m (319ft) 26.60m (87.3ft) 3.43m (11.25ft) ~38kts (43.8mph), loaded 4 x Ruston 20RK270 (38,232HP) 4 x Lips 120E

  18. Lessons Learned from HSV-X1:Modification for TSV-1X HSV-X1 No Standard/284 10,850sq.ft. 4,036sq.ft. No No Quartering (35T) C4I/Adhoc 220Gal./day N/A TSV-1X Improved/292 14,070sq.ft.(30%) 4,261sq.ft. (6%) Slewable (72T) Improved Removed (34T) Dedicated 750Gal./day No paint (~2T) 96 of 104 Lessons Learned Applied • Crew quarters/Berthing • Seating • Deck space: • Crew Galley and Mess • Passenger Galley • Ramp • Crew-served weapons and storage • Mezzanine Deck • Enhanced staff planning space • Reverse Osmosis Water Purif. Unit (ROWPU) • Other — trash compactor, red lighting, enhanced oily water storage • Paint

  19. HSV-X1, USAV Joint VentureWhat Have We Done • Joint Army/Navy Program, Nov 01 - Aug 03 • Circumnavigated the Globe (40,000NM in 103 days) during FY01 • OEF Support: 22 missions in the AOR FY01-02 • AUSA 2002, Washington DC • Sailed up Potomac ISO Static Display/Media Event • Exercises: • Millennium Challenge: Strategically repositioned halfway around the globe • Victory Strike (VS) • Lifted Stryker company 1369 miles • Strategically repositioned to Europe/supported VS – V Corps • FY 03 - Under Navy Only Operations • Navy turned over to Army in Aug 03

  20. HSV-X1, USAV Joint VentureWhere Are We Going • Currently in Hobart for maintenance and modifications • Sea Trials Completed • Re-certification of the Helo Deck • Army Crew currently undergoing HSV training and outfitting of ship • Modifications Nearing Completion • Vessel Information Systems Interactive Telemetry (VISIT) • Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) Upgrades • Berthing Upgrades • Galley Upgrades • Near Future • Travel to USARPAC (Feb 04) • USARPAC Crewed • Will Operate under USARPAC Control and participate in USFK/USARPAC Missions & Exercises during FY04 • Planned Future Endeavors • Container Handling System II (CHS II) • Lift System from Main deck to Helo deck • Helo lift and drop

  21. CHS II Concept PLAN OF AFT MISSION DECK PLAN OF FLIGHT DECK

  22. TSV-1X, SpearheadWhat Have We Done • Deployed in support of Operation Enduring Freedom (OEF) and Operation Iraqi Freedom (OIF) since January 2003 • 117 Missions through October 2003 • 1385 passengers • 7445.60 short tons • 3124 pieces of cargo • 67,236 total miles • Vessel operations have covered most of the CENTCOM AOR • providing speed and flexibility during sustainment deliveries • movement of Army prepositioned stocks and troops • Movement Tracking System (MTS) Installed • Army Crewed….Armed…. Certified….on DEPORD

  23. TSV-1X, SpearheadWhere Are We Going • Spearhead in Hobart for annual maintenance and modification upgrades • Modifications include: • Ride Control (Retractable T-Foil) • Cargo Handling System (CHS) • Roller Floor • Load Transfer Devise • Overhead Crane • Secure Enroute Communications Package - Improved (SECOMP-I) • Significantly Improved Satellite Communications Link (KU SATCOM) • On The Horizon • Layered Self Protection System • Active Defense Measures • Passive Defense Measures • Threat Identification System • Reconnaissance • Improved Movement Tracking System (MTS) • Others to be Identified

  24. Preliminary Research Container Handling System Floor Configurations For TSV-1X BOEING PROPRIETARY

  25. Containers 463L Pallets CHS On Contract

  26. Load Transfer Device (LTD)

  27. HSV Departs Hobart HSV / TSV ACTD Schedule

  28. MS C MOA 3 3 Production Delivery 3 2 O&O / ICD / CDD Production Delivery Common Document Development Joint Venture, HSV-X1 Lease Capability Gap 5 Years Spearhead, TSV-1X Lease SBCT 3 Fielding Complete SBCT 4 Fielding Complete SBCT 5 Fielding Complete SBCT 6 Fielding Complete FCS MS C FCS IOC FCS MS B Army TSV Capability GapFY08 Start – 4 Vessels in POM

  29. Summary The ACTD Program will provide a mechanism to demonstrate the true capability of the TSV while exploiting new technologies TSV operational logistic and operational maneuver capability is a major paradigm shift, not just for Army Watercraft Systems, or the Army, but for all Combatant Commanders

  30. POC Contact Information ACTD – Chris Maluchnik – (586) 574-7664, DSN 786-, maluchnc@tacom.army.mil Future – Tracy Mitchell – (586) 574-5375, DSN 786-, mitchelt@tacom.army.mil C4ISR – Pat Papa – (586) 574-5210, DSN 786-, papap@tacom.army.mil

  31. Symposium Tentative Agenda Monday, 17 May 04 Golf Outing Early Registration Exhibitor Reception in Exhibit Hall Tuesday, 18 May 04 Speakers Presentations Indoor Exhibits Evening Reception: Nauticus Maritime Museum and USS Wisconsin Battleship Tour Wednesday, 19 May 04 Demonstration Day at Fort Story (Joint Logistics over the Shore Operation) Outdoor Displays DoD Combat Feeding Buffet Surf & Turf Buffet Social on Beach, Fort Story Thursday, 20 May 04 Speakers Presentations Indoor Exhibits Golf Outing

  32. Target Speaker Invitees • Honorable Donald Rumsfeld, Secretary of Defense • Honorable Michael W. Wynne, Under Secretary of Defense for Acquisition, Technology, and Logistics * • Ms. Robyn L Quinlan, Assistant Director, Joint Forces Integration, USD (AT&L), OSD • SEN Carl Levin, MI (D), Ranking Member, Armed Services Committee • SEN John Warner, VA (R), Armed Services Committee – Declined • SEN George Allen, VA (R), Commerce, Science & Transportation Committee • GEN Peter J. Schoomaker, Chief of Staff of the Army • GEN John P. Jumper, Air Force Chief of Staff • GEN Michael Hagee, Commandant, United States Marine Corps • ADM Vern Clark, Chief of Naval Operations • ADM Edmund P. Giambastiani, US Joint Forces Commander • GEN John Abizaid, Commander, US Central Command • GEN John Handy, Commander, US Transportation Command • LTGEN Edward Hanlon Jr., Commanding General, Marine Corps Combat Development Command * • LTG James R. Helmsly, Chief, United States Army Reserve • BG (P) Brian I. Geehan, US Army Chief of Transportation * • BG Robert W. Cone, Director, Joint Center Lessons Learned • Ms. Felicia Stratton, Editor, Inbound Logistics Magazine - Declined • Mr. Keith Biondo, Publisher, Inbound Logistics Magazine - Declined • LTG John M. McDuffie, (US Army Ret.), Anteon Corp., Group VP, Defense Programs * Confirmed Speakers

  33. JLOTS & Demonstration DayIntent • Who: Joint service participation; demonstrate to the highest levels of military, government civilian, and industry leaders. • How: Conduct a four phased, full scale bare beach JLOTS Operation during demonstration day 19 May 2004 • Why: Raise the Symposium quality level and expand our sphere of influence in the DOD Acquisition Community and the Joint military community. This symposium will bring together Government, Industry and Academia to stimulate an aggressive exchange of concepts and ideas for future force projection systems and doctrine.

  34. FP SYMPOSIUM JLOTS ‘04 Concept of Operation • Concept of Operation: A four-phased, full-scale bare beach • operation conducting in-stream discharge of one or more vessels • using multiple discharge points. • Phase I – planning; pre-deployment activities • Phase II – deploy to area of operation • Phase III – execution (19 May 2004, Demo Day) • Phase IV - redeploy JLOTS POC: LTC Jennifer Campbell, 7th Transportation Group S-3, CampbellJK@eustis.army.mil, (757) 878-3309

  35. FORCE PROJECTION SYMPOSIUM JLOTS ‘04 Concept of Operations COA #2 COA #1

  36. Force Projection Symposium V Web Links • PM Force Projection Websitehttp://peocscss.tacom.army.mil/pmfp/ • Current Events Page • http://peocscss.tacom.army.mil/pmfp/events_current.htm • NDIA Website http://www.ndia.org/ • Force Projection Symposium V - Event #4710 • http://register.ndia.org/interview/register.ndia?PID=Brochure&SID=_1500LGD9K&MID=4710 • Registration opens 1 March 2004 on NDIA Web Site

More Related