Quebec Interop 06 TutorialChange Order ManagementTorsten IhrigHeidelberger Druckmaschinen AG
Overview • Scenario • What is Change Order Management • Example • What is possible with JDF • Job resend • Specific Change • Summary • What is possible with Prinect
Scenario MIS Production Controller ( Preset, Scheduling, ..) Cutter Folder Proofer PlateSetter Press PrePress Press PostPress
What is Change Order Management Changes made to the job after submitting the JDF from the MIS to Production • Changes to the job made in the MIS .. initiated from the customer... initiated from the operator. • Changes made in Production.. because the planned Device is not available... Initiated from the customer by sending different content. • Changes made at the device by the operator (post facto).
Example • MIS creates the Job based on the specifications of the customer “Saddlestitched Brochure A4 with 4p/4c Cover, 16p/4c Body” • The Production Job is sent to the Production Controller • Production Controller starts processing the Job (Expanding GrayBoxes, Submitting Processes to Devices) • Customer initiates change to his job through his CSR:“2500 Copies instead of 2000” • Customer initiates change by sending the content for the cover pages with two additional Spotcolors.
Changes from MIS Production MIS resends the Job
Job resend ResubmitQueueEntry • Only valid as long as the Job in the Queue is “Held” or “Waiting” Job not started in Production • There is no information for the Production Controller what has been changed. • All preset is lost.
Job resend AbortQueueEntry/SubmitQueueEntry • Necessary when Job started in Production. • Before the “AbortQueueEntry” can be returned all running processes have to be aborted. • If only the Amount should be changed the running Body-Sheet on the press has to be aborted and then restarted. • The MIS has to merge the Auditinformation from two tickets. • The MIS has to set all executed Processes to completed and the produced Resources to available.
From MIS Production MIS sends specific changes
Specific Change ResourceCommand • MIS can • Create new Resources • Update for existing Resources • Change the Amount • Resource has to be known to Sender and Receiver • The implications are often not quite obvious.
Specific Change NodeInfo JMF (JDF 1.2) • Changes for the NodeInfo-Element Scheduling.- FirstStart- LastEnd- SetupDuration- CleanupDuration.. • JDF 1.3 = Resource JMF with the NodeInfo Resource
Specific Change ModifyNode • ActivationChanging the “Activation” Attribute. • CommentURLChanging the CommentURL Human readable digital Job bag • NewCommentAdd, Modify or Remove comments in the Ticket at any node.
Specific Change UpdateJDF • Complex Changes to the running Job possible. • Creation of new JDF Nodes • Modifying links in existing Processes • CreateResource • CreateLink • MoveResource • RemoveLink • JDF
UpdateJDF CreateResource ResourcePool Flat Cover Folded Cover RemoveLink JDF Cutting Folding SaddleStitch CreateLink
Specific Change NewJDF • Creation of new Jobs (Discouraged) • Creation of new Processes. ( GrayBoxes Expansion) • Production MIS • If a new process is created and executed the Device sends Status JMF which will be received by the MIS. • If the JobPartID is not known it’s difficult to handle those.
Summary Job resend • easier for the MIS. • only as long as the job is not running. Specific JMF • Receiver can reject the change. • MIS knows whether the change has been accepted. • Production to MIS can use the same functionality. • JMF can also be used in the „Triangle“ MIS, PrePress Controller, Press Controller
Summary • Change Order ICS • Workitem in the MIS WG • is not available yet
What does Prinect support? • ResubmitQueueEntry • ResourceCommand • Amounts • Media, Colors, Dimension, Device. • ModifyNode • Comments