Strategic Road Projects. May 2018. Corridor VIII. Cherno More Motorway Length of the alignment – 95 km Indicative value – EUR 723 million This year is forthcoming launch of public procurement procedure for elaboration of expanded conceptual design. Corridor X.
E N D
Strategic Road Projects May 2018
Corridor VIII Cherno More Motorway Length of the alignment – 95 km Indicative value – EUR 723 million This year is forthcoming launch of public procurement procedure for elaboration of expanded conceptual design.
Corridor X • Kalotina – Sofia Motorway • Sections: • Kalotina BCCP – Dragoman – 14.5 km • In September 2017 tender procedures for engineering were launched. • Indicative value – EUR 72.5million,VAT excluded. • Funding – Connecting Europe Facility and state budget. • Dragoman – Hrabarsko road junction – 17 km • In September 2017 public procurement procedure for engineering was launched • Indicative value – EUR 59.8 million, VAT excluded. Funding – state budget • Hrabarsko road junction – Sofia Ring Road • Length of the alignment – 16.5 km • At present the project is at a stage of preparation of technical design and Detailed Development Plan
Corridor IV • Vidin – Botevgrad direction • Total length – 167 km • In March 2018 public procurement procedures were launched for engineering of the following sections: • Mezdra – Botevgrad , Lot 1– 19.3 km • Mezdra– Botevgrad, Lot 2 – 13.4 km • This year will be launched public procurement procedures for engineering of the following sections: • Vidin – Rujintsi, from km 3 to km 33 – 30 km • Vidin – Rujintsi,from km 33 to km 47 – 13.6 km • Vidin – Rujintsi, from km 47 to km 58 – 11 km
Corridor IV Struma Motorway Lot 3 Length of the alignment – 61,6 km Lot 3.1 Blagoevgrad – Krupnik – 12,6 km Lot 3.1 Zheleznitsa tunnel – 4,4 km (2 km tunnel and 2,4 kmroad before and after the facility) Lot 3.2 Krupnik – Kresna – 21 km Lot 3.3 Kresna – Sandanski – 23,6 km