Strategic Road Projects

Strategic Road Projects. May 2018. Corridor VIII. Cherno More Motorway Length of the alignment – 95 km Indicative value – EUR 723 million This year is forthcoming launch of public procurement procedure for elaboration of expanded conceptual design. Corridor X.

Download Presentation

Strategic Road Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategic Road Projects May 2018

  2. Corridor VIII Cherno More Motorway Length of the alignment – 95 km Indicative value – EUR 723 million This year is forthcoming launch of public procurement procedure for elaboration of expanded conceptual design.

  3. Corridor X • Kalotina – Sofia Motorway • Sections: • Kalotina BCCP – Dragoman – 14.5 km • In September 2017 tender procedures for engineering were launched. • Indicative value – EUR 72.5million,VAT excluded. • Funding – Connecting Europe Facility and state budget. • Dragoman – Hrabarsko road junction – 17 km • In September 2017 public procurement procedure for engineering was launched • Indicative value – EUR 59.8 million, VAT excluded. Funding – state budget • Hrabarsko road junction – Sofia Ring Road • Length of the alignment – 16.5 km • At present the project is at a stage of preparation of technical design and Detailed Development Plan

  4. Corridor IV • Vidin – Botevgrad direction • Total length – 167 km • In March 2018 public procurement procedures were launched for engineering of the following sections: • Mezdra – Botevgrad , Lot 1– 19.3 km • Mezdra– Botevgrad, Lot 2 – 13.4 km • This year will be launched public procurement procedures for engineering of the following sections: • Vidin – Rujintsi, from km 3 to km 33 – 30 km • Vidin – Rujintsi,from km 33 to km 47 – 13.6 km • Vidin – Rujintsi, from km 47 to km 58 – 11 km

  5. Corridor IV Struma Motorway Lot 3 Length of the alignment – 61,6 km Lot 3.1 Blagoevgrad – Krupnik – 12,6 km Lot 3.1 Zheleznitsa tunnel – 4,4 km (2 km tunnel and 2,4 kmroad before and after the facility) Lot 3.2 Krupnik – Kresna – 21 km Lot 3.3 Kresna – Sandanski – 23,6 km

  6. THANK YOU FOR YOUR ATTENTION! http://www.mrrb.government.bg/