1 / 13

MaxiTRANS

Greg Brown, Technical Manager. MaxiTRANS. Flat top, skel, curtain sided trailers & road trains. Refrigerated & dry freight vans. Steel & aluminum tippers, side tippers (semi’s, truck & dog) & road trains. MaxiTRANS Brands. 4 AXLE. A DOUBLE. Routes Loads Different States

rodd
Download Presentation

MaxiTRANS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Greg Brown, Technical Manager MaxiTRANS

  2. Flat top, skel, curtain sided trailers & road trains Refrigerated & dry freight vans Steel & aluminum tippers, side tippers (semi’s, truck & dog) & road trains MaxiTRANS Brands

  3. 4 AXLE A DOUBLE

  4. Routes Loads Different States Process very time consuming Customer Confusion

  5. VEHICLE ASSESSMENT PREPARE 50 PAGE NHVR APPLICATION MINIMUM 60 WORKING DAYS Some $1,000s MINIMUM NHVR APPLICATION REVIEW Approx. 10 WORKING DAYS VEHICLE BUILT AND CERTIFIED Approx. 5 WORKING DAYS AFTER BUILT Up to $4,500 NHVR FINAL APPROVAL Approx 10 WORKING DAYS ROAD AUTHORITY APPROVAL AND OBTAIN PERMIT Approx 15 WORKING DAYS Approval Process • TOTAL • 120 WORKING DAYS • Many$1,000s • FRUSTRATION !!!!!!

  6. VEHICLE ASSESSMENT PREPARE NHVR APPLICATION PRE APPROVED PRE APPROVED NHVR APPLICATION REVIEW PRE APPROVED VEHICLE BUILT AND CERTIFIED Approx. 5 WORKING DAYS AFTER BUILT $3,500 NHVR FINAL APPROVAL Approx. 10 WORKING DAYS ROAD AUTHORITY APPROVAL AND OBTAIN PERMIT Approx.15 WORKING DAYS Hamelex White - Pre Approved Process • TOTAL • 5 WORKING DAYS • $3500 MAXIMUM • COMPLETED BY HXW

  7. Hamelex White - Victoria 3 AXLE 20M MAX OVERALL LENGTH 48.5T GENERAL ACCESS (level1) 49.5T ‘B’ DOUBLE ROUTE (level 2-HML) 33.8 T LEVEL 2 PAYLOAD 4 AXLE 19M OVERALL LENGTH 50.5T GENERAL ACCESS (level1) 56.5T ‘B’ DOUBLE ROUTE (level 2-HML) 39.6 T LEVEL 2 PAYLOAD 4 AXLE 20M OVERALL LENGTH 50.5T GENERAL ACCESS (level1) 57.5T ‘B’ DOUBLE ROUTE (level 2-HML) 40.5 T LEVEL 2 PAYLOAD

  8. Hamelex White – Victoria (cont.) 5 AXLE 25M OVERALL LENGTH 63T ‘B’ DOUBLE ROUTE (level 2-HML) 44.0 T LEVEL 2 PAYLOAD 6 AXLE 25/26M OVERALL LENGTH 68.5T ‘B’ DOUBLE ROUTE (level 2-HML) 47.0 T LEVEL 2 PAYLOAD

  9. Hamelex White – Queensland 3 AXLE 20M MAX OVERALL LENGTH 45.0T General Access 48.5T GML 49.5T CML & HML 33.8 T CML & HML PAYLOAD 4 AXLE 19M OVERALL LENGTH 50T General Access 54.5T GML 56.0T CML & HML 39.0 T CML & HML PAYLOAD 4 AXLE 20M OVERALL LENGTH 50T General Access 56T GML 57.5T CML & HML 40.5 T CML & HML PAYLOAD

  10. Hamelex White – Queensland (cont.) 5 AXLE 25M OVERALL LENGTH 59.5T GML 61.5T CML 63.0T HML 44.0 T HML PAYLOAD 6 AXLE 25/26M OVERALL LENGTH 62.5T GML 64.5T CML 68.5T HML 47.0 T HML PAYLOAD

  11. Operators must make themselves aware of & comply with all operating conditions & restrictions imposed by Federal, State & Local authorities Different rules

  12. Self certification Manufacturer complies with all other ADRS If a combination is level 2 it should be allowed level 2 access Process for repeat units or similar needs to be streamlined Too many steps each adds time Improvements

  13. Whilst every effort is made to ensure information contained in this presentation is correct, MaxiTRANS accepts no liability THANK YOU

More Related