Presentation To The Hon.CERC on performance of GEB Managed Thermal Power Stations PowerPoint Presentation
Download Presentation
Presentation To The Hon.CERC on performance of GEB Managed Thermal Power Stations

Loading in 2 Seconds...

play fullscreen
1 / 44

Presentation To The Hon.CERC on performance of GEB Managed Thermal Power Stations - PowerPoint PPT Presentation


  • 107 Views
  • Uploaded on

Presentation To The Hon.CERC on performance of GEB Managed Thermal Power Stations . New Delhi Nov.11,2003. Introduction. GEB Established under Section 5 of E(S) Act 1948 in 1960 Present network . Power Scenario of Gujarat during 2002-03.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Presentation To The Hon.CERC on performance of GEB Managed Thermal Power Stations' - rhett


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Presentation

To

The Hon.CERC

on

performance

of

GEB Managed

Thermal Power Stations

New Delhi Nov.11,2003

Gen. Dept., GEB,HO,Vadodara

introduction
Introduction
  • GEB Established under Section 5 of E(S) Act 1948 in 1960
  • Present network

Gen. Dept., GEB,HO,Vadodara

power scenario of gujarat during 2002 03
Power Scenario of Gujarat during 2002-03
  • Installed Capacity MW - 8576
  • Max.Daily MUs Catered - 173
  • Max.Daily GEB MUs Catered- 88.869
  • Max.U/R Demand MW - 9040
  • Max.Demand Catered MW - 7743

Gen. Dept., GEB,HO,Vadodara

generation capacity for gujarat system in mw
Generation Capacity for Gujarat System in MW
  • GEB GEN.capacity 4888
  • Pvt. Sector Capacity 2156
  • Central Sector (Share) 1532
  • Gujarat System Total 8576

Gen. Dept., GEB,HO,Vadodara

generation and plf for geb managed thermal power stations
Generation and PLF for GEB Managed Thermal Power Stations

YearGen.in MUSPLF%

  • 1998-99 22518 63.74
  • 1999-00 24139 63.70
  • 2000-01 25640 67.85
  • 2001-02 25749 68.14
  • 2002-03 26338 69.69

Gen. Dept., GEB,HO,Vadodara

our good performance attributed to the following activities
Our Good Performance attributed to the following activities
  • Maximize the utilization of available generation capacity
  • Adopted good O&M practices as suggested by CENPEEP.
  • Implementation of recommendations made by M/s TERI for fuel stock management
  • Carrying out R&M activities to improve Generation level at all power stations.
  • Use of washed coal up to 30% at Ukai TPS and imported coal up to 25% at Gandhinagar TPS.
  • Change of Milling system by MPSP system at Ukai TPS & Wanakbori TPS.
  • Energy and Thermal audit in thermal power stations.
  • Intensive boiler tube thickness survey during AOH.

Gen. Dept., GEB,HO,Vadodara

slide7
Implementation of recommendations made by Centre for Power Efficiency & Environment Protection(CENPEEP) for performance optimization
  • Performance Optimization with participation of working level engineers from operation, maintenance, C&I, O&E Deptt.
  • Fixation of monthly performance targets and action plan for major problem area by performance group.
  • Routine performance testing on boiler system with accurate instrument
  • Feed back of work done to promote efficiency,heat rate improvements

Gen. Dept., GEB,HO,Vadodara

implementation of recommendations made by m s teri for fuel stock management
Implementation of recommendations made by M/s TERI for fuel stock management
  • The stocks are not spreaded to entire length of the yard and are well organised and consolidated
  • Coal is stacked in smaller and regular shapes preferably trapezoidal or conical shapes to facilitate accurate measurement
  • Coal stocks are kept compressed by using dozers to remove air pockets to avoid fires
  • Bulk densities of compressed coal stock is determined regularly to arrive at an average figure for reporting actual physical stock

Gen. Dept., GEB,HO,Vadodara

implementation of recommendations made by m s teri for fuel stock management contd
Implementation of recommendations made by M/s TERI for fuel stock management (contd..)
  • Direct feeding of Indian coal is done to bunkers as far as possible to avoid unnecessary stocking/reclaiming
  • Coal stocks are used on first come first out basis to avoid deterioration in coal quality resulting in lowering of TPS performance
  • Ground stocks are minimised to reduce rehandling costs
  • Coal reject is being monitored vigorously so that it remains within the limit of 0.5 to 1 %
  • 100 % coal reject utilization.

Gen. Dept., GEB,HO,Vadodara

major r m activities on hand
Major R&M activities on hand
  • RLA study for renovation of 2x120 MW units of Ukai TPS (BHEL)
  • RLA study for renovation of 2x120 MW units of Gandhinagar TPS ( NTPC)
  • Renovation programme for 2x 70 MW units of KLTPS
  • Repowering of 4x63.5 MW units of Dhuvaran TPS

Gen. Dept., GEB,HO,Vadodara

slide11
Saving due to reduction in aux.consumption and Sp. Oil consumption compared previous year for GEB & GSECL Thermal Power Stations

Gen. Dept., GEB,HO,Vadodara

stationwise performance ukai
Stationwise performance UKAI

Gen. Dept., GEB,HO,Vadodara

stationwise performance sikka
Stationwise performance- Sikka

Gen. Dept., GEB,HO,Vadodara

stationwise performance kltps
Stationwise performance- KLTPS

Gen. Dept., GEB,HO,Vadodara

stationwise performance dhuvaran tps
Stationwise performance- Dhuvaran TPS

Gen. Dept., GEB,HO,Vadodara

outage details for 200 210 mw thermal units 13 units cap 2710 mw
Outage details for 200/210 MW thermal units (13 units,cap-2710 MW)

In percentage

Gen. Dept., GEB,HO,Vadodara

slide24

Outage details for 120 MW thermal units (6 units, Cap-720 MW)

In percentage

Gen. Dept., GEB,HO,Vadodara

outage details for 63 5 mw lshs thermal units 4 units cap 254 mw
Outage Details for 63.5 MW LSHS thermal units(4 units, Cap-254 MW)

In percentage

Gen. Dept., GEB,HO,Vadodara

outage details for 140 mw lshs thermal units 2 units cap 280 mw
Outage Details for 140 MW LSHS thermal units(2 units, Cap-280 MW)

In percentage

Gen. Dept., GEB,HO,Vadodara

outage details for 70 75 mw lignite thermal units 3 units cap 215 mw
Outage Details for 70/75 MW Lignite thermal units (3 units, Cap-215 MW)

In percentage

Gen. Dept., GEB,HO,Vadodara

r m activities carried out during last five years
R & M Activities carried out during last five years

Ukai TPS

  • Replacement of water gland sealing with steam gland sealing in 120 MW unit no.1
  • Introducing MPSP system in all coal mills.
  • Replacement of bituminous class-B insulation of Generator stator winding with epoxy class-F insulation in unit no.3 &4
  • Installation of Dual flue gas conditioning system to improve flue gas SPM emission level in unit no. 4
  • Filling up of Dummy fields and providing microprocessor based control in ESP of Unit 3,4&5 to improve the performance of ESP.
  • Replacement of excitation system with static excitation system in unit no 1&2.

Gen. Dept., GEB,HO,Vadodara

r m activities carried out during last five years1
R & M Activities carried out during last five years

Gandhinagar TPS

  • Replacement of low temperature superheater in unit No 1
  • Replacement of suction type coal mill with new pressure type coal mill in unit no.1. Work in progress for unit no.2
  • Replacement of top and middle air preheater blocks in unit no.1. Work in progress for unit no. 2
  • Renovation and Modernisation of complete ash disposal system in progress.
  • Replacement of 2 nos. ABB make 220 KV circuit breakers with SF6 circuit breakers.

Gen. Dept., GEB,HO,Vadodara

r m activities carried out during last five years2
R & M Activities carried out during last five years

Wanakbori TPS

  • Replacement of Air Pre heater elements in unit 1 to 6
  • Replacement of coal mills by MPSP system with controlled rejection level in unit 1 to 6
  • Replacement of condenser tubes in unit 1 to 3
  • Replacement of HP heaters in unit 4 to 6
  • Replcement of Jyoti make 6.6 kV min.Oil Ckt.breaker with vacuum SF6 circuit breaker
  • Replacement of economiser coils in unit 1,2,3
  • Replacement of 1200 KW motors for ID and PA fans
  • Providing 100% leak proof gas isolators in flue gas path in unit 1 to 3

Gen. Dept., GEB,HO,Vadodara

r m activities carried out during last five years3
R & M Activities carried out during last five years

Dhuvaran TPS

  • Residual Life Assessment of all 6 units carried out during 1999-00
  • Replacement of old unserviceable HP heaters of unit no 1 to 4
  • Construction of new IDCT for unit 5&6
  • Replacement of 11 KV min.Oil circuit breaker with Jyoti make Vacuum circuit breaker

Gen. Dept., GEB,HO,Vadodara

materials management
Materials management
  • ARC for following consumable items to reduce procurement process time and the inventory level
    • MPSP mills spares
    • Ash plant spares
    • Bearings
    • Welding electrodes
    • All chemicals
  • Procurement of spares from OEM
  • Finalisation of orders within 90 to 120 days

Gen. Dept., GEB,HO,Vadodara

service life of geb power stations
SERVICE LIFE OF GEB POWER STATIONS

Gen. Dept., GEB,HO,Vadodara

o m expenses for ukai tps
O&M expenses for UKAI TPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara

o m expenses for gandhinagar tps
O&M expenses for Gandhinagar TPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara

o m expenses for wanakbori tps
O&M expenses for Wanakbori TPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara

o m expenses for sikka tps
O&M expenses for Sikka TPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara

o m expenses for dhuvaran tps
O&M expenses for Dhuvaran TPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara

o m expenses for utran gas based tps
O&M expenses for Utran Gas based TPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara

slide43

THANK YOU

Gen. Dept., GEB,HO,Vadodara

o m expenses for kltps
O&M expenses for KLTPS

Rs in Crores

Gen. Dept., GEB,HO,Vadodara