OPP Office Advisory Committee May 18, 2011

Loading in 2 Seconds...

play fullscreen
1 / 8

OPP Office Advisory Committee May 18, 2011 - PowerPoint PPT Presentation


  • 48 Views
  • Uploaded on

Linking logistics, infrastructure, and research proposals: improving the planning process and the metrics for success. OPP Office Advisory Committee May 18, 2011. Central Transantarctic Mountains (CTAM) Camp. Supported 17 projects and more than 100 scientists

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'OPP Office Advisory Committee May 18, 2011' - regis


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Linking logistics, infrastructure, and research proposals: improving the planning process and the metrics for success

OPP Office Advisory Committee

May 18, 2011

central transantarctic mountains ctam camp
Central Transantarctic Mountains (CTAM) Camp
  • Supported 17 projects and more than 100 scientists
  • Constructed in only 28 days; benefit of the Field Camp Standardization Plan
  • Open for science 3 December – 26 January
icecube
IceCube
  • Fully operational 86-string neutrino detector
  • Exceeded original scientific expectations for detector size
optimization
Optimization
  • Field Camp Standardization Plan
  • Code waiver process
  • Simplified Operational Requirements Worksheet
  • SIP inventory requests feed into contractor databases for efficient allocations
planning improvements
Planning Improvements
  • AIL working with ANT to complete in-depth support reviews on large projects in advance of successful scientific review
  • Contractor working with PIs on feasibility studies in advance of proposal submission
  • AIL & Contractor staff available to consult; need to get the word out
process improvements
Process Improvements
  • Support Information Package needs a refresh
    • Match worksheet structure and inventory to current practice
  • Science outbrief process needs to be more efficient
current metrics
Current Metrics
  • Antarctic Support Contractor measures performance in aggregate
  • ASC does not track performance specific to each science project
  • NSF has GPRA metrics to track productive science days
oac assistance
OAC Assistance
  • Suggestions for how to define project success criteria with respect to contractor support
    • What support is most important to each project?
    • How do we measure that?
  • Suggestions for how best to receive feedback on support
    • On-ice or off?
    • Direct to NSF rather than through contractor?