1 / 47

P2STPIBN TUSI dan PROGRAM KEGIATAN oleh : Dedi Sunaryadi

P2STPIBN TUSI dan PROGRAM KEGIATAN oleh : Dedi Sunaryadi. Februari 2014 JAKARTA. TUSI.

razi
Download Presentation

P2STPIBN TUSI dan PROGRAM KEGIATAN oleh : Dedi Sunaryadi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P2STPIBN TUSI dan PROGRAM KEGIATAN oleh: DediSunaryadi Februari 2014 JAKARTA

  2. TUSI Melaksanaan penyiapan perumusan kebijakan teknis, pembinaan, pengembangan dan pengendalian pengkajian pengawasan dalam bidang keselamatan, keamanan danseifgard pada sistem Instalasi Nuklir Non Reaktor yang mencakup tapak, desain, konstruksi, operasi, perawatan, dan dekomisioning, dan bahan nuklir

  3. Pusat Pengkajian Sistem dan Teknologi Pengawasan Instalasi dan Bahan Nuklir (P2STPIBN) membawahi 3 (tiga) bidang yang mendukung pelaksanaan tugas dan fungsi P2STPIBN , yaitu : • Bidang Pengkajian Reaktor Daya; • Bidang Pengkajian Reaktor Non Daya; • Bidang Pengkajian Instalasi Nuklir Non Reaktor.

  4. Bidang Pengkajian Reaktor Daya mempunyai tugas melaksanakan penyiapan perumusan kebijakan teknis, pembinaan, pengembangan dan pengendalian pengkajian pengawasan dalam bidang keselamatan, keamanan dan seifgard pada sistem reaktor daya yang mencakup tapak, desain, konstruksi, operasi, perawatan, material atau komponen dekomisioning, dan bahan nuklir. • Bidang Pengkajian Reaktor Non Daya mempunyai tugas melaksanakan penyiapan perumusan kebijakan teknis, pembinaan, pengembangan dan pengendalian pengkajian pengawasan dalam bidang keselamatan, keamanan dan seifgard reaktor non daya yang mencakup tapak, desain, konstruksi, operasi, perawatan, material atau komponen, dekomisioning, dan bahan nuklir. • Bidang Pengkajian Instalasi Nuklir Non Reaktor mempunyai tugas melaksanakan penyiapanperumusan kebijakan teknis, pembinaan, pengembangan dan pengendalian pengkajian pengawasan dalam bidang keselamatan, keamanan dan seifgard pada sistem di bidang Instalasi Nuklir Non Reaktor yang mencakup tapak, desain, konstruksi, operasi, perawatan, dekomisioning, dan bahan nuklir.

  5. Struktur organisasiP2STPIBN

  6. REGULATION TECHNICAL SUPPORTS LICENSING INSPECTION

  7. Sedang berjalan: • UNS (Prof. Ari Ramelan) • (MCNP, RELAP, MVP) • ITB (Prof Zaki Suud) • (MCNP, RELAP, SOFTWARE Tapak/Seismic) • Menunggu Perpanjangan Kerma: • UGM • Fakultas Teknik (DR. Andang, Prof. Panut) • Material Science, Neutronik, (MCNP, RELAP, SOFTWARE Tapak/Seismic) • PSE (DR. Deendarlianto) • Neutronik & Thermohidrolik • Komputer (DR. Pekik) • Computing, Simulasi (metode paralel computing) • MCNP (perlu memory yg besar) Program KerjasamadenganPerguruanTinggi

  8. Masyhur Irsyam*dkk. • *Ketua - Tim Revisi Peta Gempa Indonesia 2010 • Ketua - Pusat Penelitian Mitigasi Bencana ITB • Ketua - Tim Asistensi Ristek Kegempaan – Kemen Ristek Kajian Teknis Penentuan Kriteria Penerimaan Aspek Seismik dan Geoteknik “Kajian Teknis Evaluasi Pengawasan Reaktor Daya” Jakarta 9 November 2011

  9. Aspek Kegempaan: Ground Motion • Aspek Kegempaan: Liquefaction • Aspek Geoteknik: Settlement dan Fondasi • Aspek Geoteknik: Kelongsoran Lereng Cakupan

  10. Fault rupture Manusia memiliki kebutuhan dasar untuk terlindungi dari implikasi buruk adanya gempa (FEMA 451b, 2007) Strategi Mitigasi Gempa Infrastruktur perlu dirancang tahan gempa Infrastruktur Tahan Gempa

  11. SENDAIEARTHQUAKE 2011

  12. Major Tectonic around Indonesia (Bock et al., 2003) There are 4 major tectonic plates in this region: Eurasia, Indoaustralia, Pacific and Philipine. Indoaustralia and Philipine/pacific plates subduct beneath the Eursia plate with the rate of 6cm/year and 12 cm/year

  13. Overview: Seismicity of Indonesia Indonesia is one of the most seismically active countries in the world, it is situated in South-east Asia tectonic regime.

  14. Peak Ground Acceleration (PGA) at Bedrock SB Probability of exceedence 2% in 50 years (2,500 years EQ) Peak Ground Acceleration (PGA) at Bedrock SB Probability of exceedence 2% in 50 years (2,500 years EQ)

  15. Seismic Hazard Map of Indonesia (SNI-03-1726-2002) HorizontalPeak Ground Acceleration at bedrock SB for 10% in 50 years(+500-years)

  16. Historical Earthquakes along The Sumatran Fault Zone 1822 1964 1892 (7.7) 1967 1893 Seismic Gap? 1990 1900 1997 1936 1908 1921 1909 (7.6) 1916 1916 1984 1987 1921 ( >7) 1892 1926 (~7) 1822 1926 1933 (7.5) 6 March 2007 (M6.3 & 6.1) 1943 1936 (7.2) 1909 1995 1942 (7.3) 1952 1943 (7.3) 1942 1900 1 Oct 2009 (M6.7) 1952 (6.8) 1893 1964 (6.5) 1933 1994 1967 (6.8) 1908 1979 (6.6) 2000 1984 (6.4( 1987 (6.6) 1990 (6.5) 1994 (6.9) 23 destructive events in the past 200 years or 1-2 large earthquakes occur every decade 1995 (7.0) 1997 (6.5)

  17. 1985 MEXICO EARTHQUAKE

  18. Parameter bangunan: karakteristik material danelemen struktur Standard2 perencanaan infrastruktur tahan gempa Perancangan Infrastruktur Tahan Gempa Tergantung: : Parametergerakan tanah : M, R, Kondisi Geologi dan tanah Peta gempa Indonesia + Mikrozonasi Kota/ Area Soft soil layer R M

  19. Gaya-gaya Gempa H Ground Motion di Batuan Dasar

  20. Karakteristik Gerakan Tanah (FEMA 451b): • Percepatan, kecepatan, dan perpindahan • Respon spektra • Fourier amplitude spectra • Duration • Percepatan dan kecepatan puncak efektif • Incremental velocity Untuk mengetahui gaya-gaya gempa:Diperlukan parameter Pergerakan Tanah Dalam aplikasinya, sesuai tingkat kesulitan dan akurasi: Ground Motion untuk Engineering Design Respon spektra amax T Parameter pergerakan tanah Time histories percepatan

  21. Seismic Hazard Analysis Deterministic (DSHA) Probabilistic (PSHA) • Gabungandaripengaruhseluruhsumberdisekitarlokasi • Bukan hanya worst case scenario, tapi juga berbagai level dan kemungkinan • Yang digunakan dalam SNI-2002 • Akibatsuatusumbertertentu • Worst case scenario/kondisi terjelek (jarakterdekatdan Magnitude terbesar) SNI-2011: Cara terbaik dengan mengintegrasikan keduanya • Probabilistic maps: years • 50 • 100 • 200 • 500 • 1,000 • 2,500 • 10,000 Lokasi dekat Sesar yang menentukan adalah hasil Deterministik Istilah “Gempa 2500 tahun” bukan menunjuk kepada kejadian gempa yang terjadi sekali setiap 2500 tahun, tetapi lebih sebagai gambaran ttg probabilitas suatu percepatan yang memiliki kemungkinan 1/2500 untuk terjadi setiap tahun Deterministic maps

  22. Potential sources for earthquake

  23. 0.56g 0.47g 0.44g 0.40g 0.35g 0.28g SNI 2002: 0.15g Gempa Yogya 2006 a=0.25-0.30 g

  24. Peta Percepatan di Batuan Dasar (500 thn) 0.15 SNI 2002 0.10 0.15 0.20 Tim Revisi Peta Gempa2010 0.18 0.28

  25. Peta PGA SNI-03-1726-2002 rerata hasil yang dilakukan oleh empat penelitian dari berbagai latar belakang

  26. Percepatan untuk Yogyakarta: 0.25g Kertapati SNI-03-1726-2002 merupakan peta percepatan gempa yang nilainya diambil dari rerata hasil yang dilakukan oleh empat penelitian dari berbagai latar belakang Boen & Shah 0.20g PGA rata-rata = 0.24g 0.25g Theo F Najoan 0.25g Firmansyah Irsyam

  27. A probabilistic spectral hazard maps for Indonesia have been developed based upon updated available seismotectonic data, new fault models, and recent ground-motion prediction equations. Seismic sources were divided into fault, subduction, and background zones. Probabilistic Seismic Hazard Analysis has been completed for 50, 200, 500, 1.000, 5.000, and 2500 year earthquake. Deterministic Seismic Hazard Analysis has been completed. For buildings: Maximum Considered Earthquake (MCE) has been completed based on Probabilistic +Determintic Approaches + Building Fragility. Conclusions

  28. Team for Revision of Seismic Hazard Map of Indonesia 2010 • Conducting periodic updating of seismic hazard maps and buildingcodes of Indonesia every 3-5 years, • Conducting microseismic investigation active faults that have not been well identified/ well quantified, • Accelerating the installation of strong-motion accelerometer networks in Indonesia in order to develope database of time histories and attenuation functions of Indonesia, • Performing microzonation studies for big cities in Indonesia, Recommendations:

  29. National Regulation • Nuclear Energy Regulatory Agency-BAPETEN Chairman Decree No. 5 of 2007Terms of Site Evaluation of Nuclear Reactor Safety • Nuclear Energy Regulatory Agency-BAPETEN Chairman Decree Number 6 of 2008On Power Reactor Site Evaluation Aspects of External events. • Nuclear Energy Regulatory Agency-BAPETEN Chairman Decree No. 4 of 2008On Power Reactor Site Evaluation for Meteorological Aspects. • Nuclear Energy Regulatory Agency-BAPETEN Chairman Decree No. 1 of 2008 Seismic Site Evaluation of Nuclear Power Reactor

  30. ANALISIS NEUTRONIK ABSORBER AgInCd PADA REAKTOR RSG GAS Oleh: AZIZUL KHAKIM Pusat Pengkajian Sistem dan Teknologi Pengawasan Instalasi dan Bahan Nuklir (P2STPIBN) Badan Pengawas Tenaga Nuklir (BAPETEN) JAKARTA, 5 JULI 2013

  31. MODEL FE DAN CE Fuel Element Control Elemen

  32. MODEL TERAS DENGAN MCNP5 Pemodelan teras RSG GAS dengan MCNP5: (A) Beam tube tangensial; (B) Beam tube radial

  33. Animated by Azizul Khakim FUEL MANAGEMENT REFUELING … END OF CYCLE BEGINNING OF CYCLE FRESH FUELS SPENT FUELS FE FE FE FE FE FE FE H FE G FE FE FE FE CE FE F FE FE FE FE FE FE CE CE FE E FE FE FE FE CE FE D FE FE FE FE CE C FE FE FE FE FE FE CE CE CE B FE FE FE FE CE A FE FE FE FE FE FE BURN UP LEVEL 10 9 8 7 6 5 4 3 8 7 6 5 4 3 2 1

  34. RESULTS: BENCHMARK MCNP CODE MCNP Benchmark with exp’tal data of the first core and first criticality RSG GAS

  35. Elemen Bakar dan Pemodelan Elemen bakar (UZr-H) Pemodelan elemen bakar (Antariksawan, 2004)

  36. Program Kegiatan 2014 ALOKASI DANA : Rp. 1.397.000.000 JUMLAH KEGIATAN 12 KEGIATAN

  37. Thank You

More Related