OPTIMIZING THE SOLID WASTE COLLECTION SYSTEM OF ACSS USING LINEAR PROGRAMMING & GIS. Mohammed Abdi Ali Term Project Fall 2000 CE 394 GIS for Water Resources For additional information, visit http://www.ce.utexas.edu/stu/alima/home.html/swgis.htm. Topics of the Presentation:. Introduction

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - raphael


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Optimizing the solid waste collection system of acss using linear programming gis l.jpg

OPTIMIZING THE SOLID WASTE COLLECTION SYSTEM OF ACSS USING LINEAR PROGRAMMING & GIS

Mohammed Abdi Ali

Term Project

Fall 2000

CE 394 GIS for Water Resources

For additional information, visit

http://www.ce.utexas.edu/stu/alima/home.html/swgis.htm


Topics of the presentation l.jpg
Topics of the Presentation: LINEAR PROGRAMMING & GIS

  • Introduction

    • ACSS

    • Model formulation for Solid Waste Collection Optimization

    • Use of GIS in solid waste management

  • Objective of Term Project

  • Data Acquisition & Preparation

  • Analysis Using Arc View GIS Spatial Analyst

  • Analysis Using Arc View GIS Network Analyst

  • Conclusion

  • Acknowledgment


1 introduction l.jpg
1. LINEAR PROGRAMMING & GISIntroduction

  • ACSS

    • ½ of the City’s population solid waste service provider

    • Provides service for commercial & residential customer for both recyclable and disposable solid wastes.

    • Provides both stationary container and hauled container services

    • Offloading sites :TDS, BFI, MRF,Hornsby Bend, & COA Landfill

  • Model of the optimization:

  • Input Data:

  • Source location

  • Transportation street networks

  • Transportation route length between pick-up locations

  • Waste generation data at pickup location

  • Location of offloading sites

  • Analysis (optimization):

  • Use linear modeling

  • Minimize collection cost by considering the collection distance( route) and collection time

  • Constraints: regulation, traffic loads, and working hours, truck capacity, and other conditions. Types of collection system

  • Output:

  • Optimum collection route

  • Collection time

  • Minimum cost


Slide4 l.jpg

  • Use of GIS in solid waste management LINEAR PROGRAMMING & GIS

    2. Objective of the Term Project:

  • Investigating the existing capacity of Arc View GIS tools for optimizing city’s solid waste collection system

  • To use the existing Arc View tools for preliminary route optimization

    3. Computer Data Acquisition & preparation

  • Customer locations

  • Austin City Street network

  • Offloading and Office locations

  • Identifying Commercial, residential and recyclable customers and hauled container collection system services



4 analysis using arc view spatial analyst l.jpg
4. Analysis Using Arc View Spatial Analyst LINEAR PROGRAMMING & GIS

  • The proximity analysis tools

    Procedures:



Slide8 l.jpg
5. Analysis Using Arc View GIS Network Analyst LINEAR PROGRAMMING & GISThe Closest facility to Hauled Container Collection System-Procedures:


Out put of the analysis l.jpg
Out put of the Analysis LINEAR PROGRAMMING & GIS


Sample best route analysis procedures l.jpg
Sample Best Route Analysis LINEAR PROGRAMMING & GISProcedures:


Out of the analysis l.jpg
Out of the Analysis LINEAR PROGRAMMING & GIS


6 conclusion l.jpg
6. LINEAR PROGRAMMING & GISConclusion

  • The existing Spatial and Network analyst tools have limited application in City’s solid waste collection system optimization

  • The existing tools are suitable for hauled container collection system than the stationary container system

  • Improved tools or integration of additional linear models to include all the factors that may affect the collection system is necessary

  • The existing tools may be helpful for locating transfer stations and landfill sites for new collection system

  • Acknowledgment

    -City of Austin Solid Waste Service Office