MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections - PowerPoint PPT Presentation

rafiki
mndot acec mn annual conference creating multimodal connections n.
Skip this Video
Loading SlideShow in 5 Seconds..
MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections PowerPoint Presentation
Download Presentation
MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections

play fullscreen
1 / 6
Download Presentation
Presentation Description
109 Views
Download Presentation

MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections Facilitator Patrick Watz, AECOM March 5, 2013

  2. Central Corridor – The Common Link • 18 new stations • 11 miles long • 9.8 miles of new double track • 47 new Light Rail Vehicles • 40,940 average weekday ridership in 2030 • 18 new stations • 11 miles long • 9.8 miles of new double track • 47 new Light Rail Vehicles • 40,940 average weekday ridership in 2030

  3. Central Corridor Timeline 2007 Preliminary Engineering (PE) Environmental Documentation Final Design - Heavy Construction Begins Full Funding Grant Agreement Continue Heavy Construction Start Operation 2009 2010 2011 2011 - 2013 2014

  4. Regional Transitway System

  5. Connecting Transit Modes


  6. Today’s Presentations The Interchange Project: Innovation in Multimodal Planning & DesignGeorge Fantauzza, Project Architect, The Interchange Union Depot Renovation & Restoration: A Multimodal Transportation HubGreg Brown, URS Corporation Kevin Dalager, Mortenson Michael Bjornberg, HGA