RAJIV LIFT IRRIGATION SCHEME (BHIMA). RAJIV LIFT IRRIGATION SCHEME (BHIMA). RAJIV LIFT IRRIGATION SCHEME (BHIMA). RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT). CATEGORY-II. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT). CATEGORY-II. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT).

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'RAJIV LIFT IRRIGATION SCHEME (BHIMA)' - rafer


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide4

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

CATEGORY-II

slide5

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

CATEGORY-II

slide6

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Name of the Contractor : M/s R.M.M &BRC (JV)

Agreement Amount : Rs. 57.97Crs.

Agreement Date : 03-03-2005

Period of Completion : 24 Months (8 milestones)

Date of completion : 03-03-2007

Package No. 13/Cat-II : Excavation of High level right main canal, distributary system including construction of CM & CD works from Sangambanda BR to feed ayacut of 18400 Acres.

  • Investigation completed : Completed
  • Designs : 9.2 KM approved against 24 KM
  • Execution (Main canal) : 15 KM length in progress against total length of 24.00KM
  • Qty. of earth work done : 6.00Lakh Cum against 37.32 Lakh Cum.
  • Qty. of concrete work done : 500 cum against 3500 cum
  • No. of Machinery : Deployed = 15Nos (Excavators =2 Nos.,Tipper-8Nos., T Roller- 2Nos., Dozers = 1 Nos., Water tank -1No.Crushing plant-1No.)
  • Land Acquisition : Required 1000 Acres, Requisition : 260 acres, Acquired – 81 acres
  • Expenditure : Rs. 14.90 Crs. against Rs. 57.97 Crs.,
  • Mob. Adv. Paid : Rs. 2.90 Crs.
  • Mob. Adv. Recovered : Rs. 2.90 Crs.
  • Bottlenecks : Land Acquisition
slide7

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Name of the Contractor : M/s VPR– Coromandal (JV)

Agreement Amount : Rs. 68.94Crs.

Agreement Date : 05-03-2005

Period of Completion : 24 Months (8 milestones)

Date of completion :24-02-2007

Package No. 14/Cat-II : Excavation of High level left main canal, distributary system including construction of CM & CD works etc. to feed an ayacut of 35,800 Ac. Under Sangambanda BR,

  • Investigation : Completed (40.645 KM)
  • Designs : Main canal completed (40.465 KM)
  • Execution (main canal) : 28.75KM length in progress against total length of 40.645 KM
  • Qty. of earth work done : 18 Lakh Cum against 26.20 Lakh Cum.
  • Qty. of concrete work done : 1500 cum
  • No. of Machinery : Deployed = 29Nos (Excavators = 6 Nos., Dozers = 2 Nos, Tippers = 21Nos. etc)
  • Expenditure : Rs. 29.88 Crs. against Rs. 68.94 Crs.,
  • Mob. Adv. Paid : Rs. 6.88 Crs.
  • Mob. Adv. Recovered : Rs. 1.68 Crs.
  • Land Acquisition : Required 1867 Acs, Requisition : 651 Acquired– 205.54 Acres
slide8

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. 15/Cat-II : Investigation, design, estimation and excavation of canal distributary system including construction of CM & CD works from Yenukunta BR, Waddewata (V), Kottakota (M), Mahabubnagar (D) to feed about 14,000 Acres upto Rangasamudram BR.

Name of the Contractor : M/s Prathibha – Ch MR- (JV)

Agreement Amount : Rs. 51.27 Crs.

Agreement Date : 05-03-2005

Period of Completion : 24 Months (8 milestones)

Date of completion : 05-03-2007

  • Investigation : Completed (30.25 KM)
  • Design : 26.75 KM approved against 30.25 KM
  • Execution (main canal) : 13 KM length in progress against total length of 30.25 KM
  • Qty. of earth work done : 5,70,000 Cum against 20,00,000 Cum
  • No. of Machinery : Deployed = 28Ns (Excavators = 6 Nos., Tippers=20Nos, Leveller =2No.)
  • Land Acquisition : Required 943 Acres, Requisition :407Acs. Acquired – 218.71Acs.
  • Expenditure : Rs. 8.12 Crs. (Inc. Mob. Adv. Rs. 5.12 Crs.) against Rs. 51.27 Crs.
slide9

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Name of the Contractor : M/s RNS-GSR & Co. (JV)

Agreement Amount : Rs. 70.80Crs

Agreement Date : 02-03-2005

Period of Completion : 24 Months (8 milestones)

Date of completion : 02-03-2007

Package No. 16/Cat-II : Excavation of canal distributary system – including construction of CM & CD works from Ranga Samudram to feed an ayacut of 21,000 Acres.

  • Investigation (HPs) : Length 58Kms finalised against 81Kms
  • Execution : Excavation in 1.5 KM length in progress against total length of 81.00 KM
  • Qty. of earth work done : 10,000 Cum against 16,00,000 Cum
  • No. of Machinery : Deployed = 15 Nos (JCB-1No.Excavators = 4 Nos, Tippers-2Nos, S.Crushers- 2Nos, Hard top jeep-4Nos)
  • Expenditure : Rs. 3.54Crs. (Mob. Adv. Only) against Rs. 70.80 Crs.
  • Land Acquisition : Required 1415 Acres, Requisition: 162.34Acres Acquired – Nil
  • Bottle Necks : Land Acquisition
slide10

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. 17/Cat-II : Investigation, design, estimation and execution for converting the existing Rangasamudram tank, near Sri Rangapuram (V) Pebbair (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II)

Name of the Contractor : M/s A L S-KVR(JV)

Agreement Amount : Rs. 41.50 Crores

Agreement Date : 07-03-2005

Period of Completion : 24 Months (8 milestones)

Date of completion : 07-03-2007

  • Investigation : Completed
  • Designs (Earth Bund & Weir) : 80% approved
  • Execution : Started
  • Qty. of earth work done : Cut off trench excavated for a length of 1.50 KM
  • Expenditure : Rs. 2.08 Crs. (Mob. Adv. Only) against Rs. 41.50 Crs.
  • Land Acquisition : Required 2452.30Acres, Requi.: 2526.11Acrs Acquired – Nil
  • Bottle Necks : Land Acquisition
slide11

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. 18/Cat- : Investigation, design, estimation and execution for convesting the existing Shankarasamudram tank, near Knaipally (V) Kothakota (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II)

Name of the Contractor : M/s Sri Avanthika Saivenkata (JV)

Agreement Amount : Rs. 42.10 Crores

Agreement Date : 14-03-2005

Period of Completion : 24 Months(8 Mile Stones)

Date of completion : 14-03-2007

  • Investigation : Completed (3.69 KM)
  • Designs (Earth bund & Weir) : 80% of designs approved.
  • Execution : Yet to start (Water in the Tank & objections of Kanepally (V) for want of inclusion of village in R & R Package.
  • Expenditure : Rs. 2.11 Crs. (Mob. Adv. only) against Rs. 42.10 Crs.
  • Land Acquisition : Required 2220 Acres, Requisitioned: 1491Ac. Acquired – 1436 acres
slide12

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Name of the Contractor : M/s G. H. Reddy & Associates K.K.R & Co. (JV),

Agreement Amount : Rs. 36.90 Crores

Agreement Date : 19-02-2005

Period of Completion : 24 Months (Milestones : 8)

Package No. 19/Cat-II : Shankara Samudram Balancing Reservoir Right Main canal.

  • Investigation : Completed (39 KM)
  • Designs (HPs & Structures): approved
  • Execution : 34 KMlength in progress against total length of 39 KM
  • Qty. of earth work done : 5.5 Lakh Cum against 6 Lakh Cum.
  • Qty. of concrete work done: 2500 cum against 30,000 cum
  • Structure : 25 Nos. executed against 110 Nos.
  • Expenditure : Rs. 16.68 Crs. against 36.79Crores
  • Mob. Adv. Paid : Rs. 3.68 Crs.
  • Mob. Adv. Recovered : Rs. 0.70 Crs.
  • Land Acquisition : Required 800 Acres, Requisitioned 459 Acs Acquired – 236 acres
slide13

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. 20/Cat- : (i) Formation of Earth Dam of Budpur with FRL +352m (ii) Construction of spillway, (iii) Construction of Head Regulator to let out into left and right main canals.

Name of the Contractor : M/s KNR-SLEC (JV), Hyd.

Agreement Amount : Rs. 36.98Crs

Agreement Date : 07-03-2005

Period of Completion : 24 Months (8 milestones)

  • Investigation : Completed (6.10 KM)
  • Designs : Approved
  • Execution : Qty. of earth work 5.64 Lakh cum completed.
  • Expenditure : Rs. 15.43 Crs. (Inc. Mob. Adv. Rs. 3.43 Crs.) against Rs. 36.98Crs.
  • Mob. Adv. Recovered : Rs. 1.37 Crs.
  • Machinery deployed : Excavator-1No., Tippers-5No., Dozer-1No., Other M/C-7Nos.
  • Land Acquisition : Required 2073.11 Acres, Requisitioned- 2073.11 Acs Acquired – 358Acs.
slide14

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. 21/Cat-II : Investigation, Designs and excavation of left main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres

Name of the Contractor : M/s S.V.E.C Co., Hyd.

Agreement Amount : Rs. 60.39 Crores

Agreement Date : 25-02-2005

Period of Completion : 24 Months (milestones)

  • Investigation : completed (32 KM)
  • Designs (HPs & Structures) : Length 28.65 Km approved against 37.825Kms.
  • Execution (Canal) : 28.10KM length in progress against total length of 37.825KM
  • Structures : 13 Nos. executed against 79 Nos.
  • Machinery deployed : 10Nos. (Tippers-4Nos, Poclains-4Nos, DRR-1No,Dozer-1No.)
  • Land Acquisition : Required 1386 Acres, Requisitioned: 316Acs Acquired – 98 Acs.
  • Expenditure : Rs. 18.04 Crs. (inc. mob. Adv. Rs. 6.04 Crs.) against Rs. 60.39 Crs.
  • Bottle necks : Land acquisition – not handed over by Revenue authorities
slide15

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. 22/Cat- : Investigation, Designs and excavation of right main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres

Name of the Contractor : M/s S.V.E.C Co., Hyd.

Agreement Amount : Rs. 26.73 Crores

Agreement Date : 25-02-2005

Period of Completion : 24 Months (8 milestones)

  • Investigation : Completed (15.025 KM)
  • Design (HPs) : Approved
  • Execution (Canal) : 14.50KM length in progress against total length of 15.025KM
  • Qty. of earth work done : 2.86 Lakh cum against 2.95 Lakh cum
  • Qty. of concrete work done: 5200 cum
  • Structures : 23 Nos. executed against 54 Nos.
  • Expenditure : Rs. 14.68 Crs. (Inc. Mob. Adv. Rs. 2.68 Crs.) against Rs. 26.73 Crs.
  • Mod. Adv. Recovered : Rs. 0.73 Crs.
  • Machinery deployed : 13Nos. (Tippers-4Nos, Poclains-7Nos, DRR-1No,Dozer-1No.)
  • Land Acquisition : Required 354 Acres, Requisitioned: 212Acres Acquired – 128 Acs.
  • Bottlenecks : Land acquisition
slide16

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. OC (Pkg. 27): Investigation, Design, excavation of left main canal, distributary system including construction of CM & CD works from Sankarsamudam Balancing Reservoir .

Name of the Contractor : M/s KNR Const. Ltd. & BPL (JV)

Agreement Amount : Rs. 149.40Crs.

Agreement Date : 9/2005

AGREEMENT DATE : 9/2005

INVESTIGATION and DESIGNS are in PROGRESS

Financial – Rs. 7.47 Crores (Mob. Adv. Only) against Rs. 149.40 Crores

  • Land Acquisition:
  • Required : 3,000 Acs.
  • Requisitioned : 169.95 Acs.
  • Acquired : Nil
slide17

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. EPC / OC- : LIFT-I : Design, manufacture, supplying & erection of pumps, motors, electro mechanical works, including tunnel, cistern and pump house etc.

Name of the Contractor : M/s Patel Engineering Ltd.

Agreement Amount : Rs. 383.349Crores

Agreement Date : 07-03-2005

Period of Completion : 30 Months (10 milestones)

  • Investigation :Completed (3.0725 KM)
  • Designs (Tunnel, Pump House, Surge pool, Cistern): 2.70 KMapproved against 3.0705
  • Execution : Excavation in progress (approach channel, tunnel, surge pool & Pump house)
  • Qty. of earth work done : 5.50 Lakh Cum against 7.82 Lakh Cum.
  • No. of Machinery : Deployed = 8 Nos (Excavators = 6 Nos., Dozers = 2 Nos. etc)
  • Land Acquisition : Required 250 Acres, Requisitioned 218Acs Acquired – 111 Acs.
  • Expenditure : Rs. 52.16 Crs. against Rs. 383.34 Crs. (Mob. Adv paid – Rs. 19.58 Crs.)
  • Mob Adv. Recovered : Rs. 1.61 Crs.
  • Bottlenecks : Land Acquisition
slide18

RAJIV LIFT IRRIGATION SCHEME

(BHIMA PROJECT)

Package No. EPC / OC- : Design and execution of Stage-I and stage-II pumping stations of lift-II at Thirumalayapalli & Kothakota (M), Mahabubnagar (D) on EPC basis.

Name of the Contractor : M/s NEC – NCC – MAYTAS (JV)

Agreement Amount : Rs. 391.55 Crores

Agreement Date : 14-03-2005

Period of Completion : 30 Months

  • Investigation : Completed (3.132 Kms)
  • Designs (Tunnel, Pump House, Surge pool, Cistern): Approved
  • Execution : Excavation 0.383Km in progress (approach channel, tunnel, surge pool & Pump house)
  • Qty. of earth work done : 1,70,000 Cum against 5 Lakh Cum.
  • No. of Machinery : Deployed = 18 Nos (Excavators = 4 Nos., Dumpers = 12 Nos., Dozers = 2 Nos. etc)
  • Land Acquisition : Required 135 Acres, Requisitioned 67 Acs. Acquired – Nil
  • Expenditure : Rs. 71.58 Crs. against Rs. 391.55 Crs.
  • Mob. Adv. Paid : Rs. 19.58 Crores.
  • Mob. Adv. Recovered : Rs. 6.00 Crores.