multiple indicator cluster surveys survey design workshop n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Multiple Indicator Cluster Surveys Survey Design Workshop PowerPoint Presentation
Download Presentation
Multiple Indicator Cluster Surveys Survey Design Workshop

Loading in 2 Seconds...

play fullscreen
1 / 15

Multiple Indicator Cluster Surveys Survey Design Workshop - PowerPoint PPT Presentation


  • 65 Views
  • Uploaded on

Multiple Indicator Cluster Surveys Survey Design Workshop. General Structure of a Survey Plan. Country Survey Plan. Country teams will be required to draft and present a ‘country survey plan’ on the last day of the workshop. Country Survey Plan. 5-10 minutes presentations

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Multiple Indicator Cluster Surveys Survey Design Workshop' - rachel


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
multiple indicator cluster surveys survey design workshop

Multiple Indicator Cluster SurveysSurvey Design Workshop

General Structure of a Survey Plan

MICS4 Survey Design Workshop

country survey plan
Country Survey Plan
  • Country teams will be required to draft and present a ‘country survey plan’ on the last day of the workshop

MICS4 Survey Design Workshop

country survey plan1
Country Survey Plan
  • 5-10 minutes presentations
  • Presentation by the UNICEF officer or the survey coordinator
  • Followed by short general discussion
  • There will be preparatory discussion and group work

MICS4 Survey Design Workshop

country survey plan2
Country Survey Plan
  • Sessions specifically allocated to group work on Country Survey Plans

MICS4 Survey Design Workshop

country survey plan3
Country Survey Plan
  • Power point presentation is encouraged
  • Handouts are optional
  • Please copy all power point presentations to the workshop laptop
    • All presentations will be copied to USB disks that will be distributed to all participants

MICS4 Survey Design Workshop

country survey plan4
Country Survey Plan
  • Between now and the time of your presentation, facilitators will work with groups of countries both during workshop hours and after the workshop hours, if needed
  • Bilateral meetings will also be organized to meet with country teams, if needed
  • Country teams will use ‘Country Survey Plan’ Template to develop/finalize their plans

[Word file - MICS4 Country Survey Plan Template.doc]

MICS4 Survey Design Workshop

presentations
Presentations
  • Countries planning a MICS
    • Initial or draft ‘Country Survey Plan’ is expected to be presented
    • A revised ‘Country Survey Plan’ is expected to be submitted after the workshop

MICS4 Survey Design Workshop

presentations1
Presentations
  • Countries planning a mixed survey
    • MICS-DHS,
    • DHS-MICS,
    • MICS-other, or
    • Other cases
    • Initial plans and preparations for surveys

MICS4 Survey Design Workshop

presentations2
Presentations
  • Countries not planning a survey and/or recently completed one
    • May present summary information on
      • completed surveys
      • content
      • data availability
      • future data collection plans

MICS4 Survey Design Workshop

csp should answer
CSP should answer….
  • Implementing agency, MICS/Survey Team and Governance Structure
  • Questionnaires
    • Which modules will be retained, which modules will not be used?
    • Any issues regarding specific questions or question groups?

MICS4 Survey Design Workshop

csp should answer1
CSP should answer….
  • Sampling
    • What will be the sample size?
    • Sample frame? Updating necessary?
    • What will be the general design characteristics of the sample?
    • What will be the level of aggregation?

MICS4 Survey Design Workshop

csp should answer2
CSP should answer….
  • Survey Instruments Needed
    • Equipment and supply needs
  • Training of Fieldwork Staff
    • Timing, participants, length
  • Fieldwork
    • Timing, constraints, team composition, duration, logistics, monitoring

MICS4 Survey Design Workshop

csp should answer3
CSP should answer….
  • Data Entry and Data Processing
    • Timing, data entry team, duration, monitoring
  • Budget
    • How much will the MICS4/major budget line items cost?
    • Available funding and funding needs
    • Budget template [excel file] will be available

[Separate session on budget calculations]

MICS4 Survey Design Workshop

csp should answer4
CSP should answer….
  • Timetable
    • What is the timetable envisaged for MICS4 activities?

[Separate session on Timetable]

  • Major Challenges and Support from UNICEF
    • What are the major challenges?
    • What kind of technical support will be needed? In what areas? Who from?

MICS4 Survey Design Workshop

getting started document
‘Getting Started’ Document
  • General information
  • Tables
    • Timetable template
    • Budget template
    • Costing framework

Next session:

Timetable and Budget Calculations

MICS4 Survey Design Workshop