Simplified Solar Power Plant Visualization For iPhone
210 likes | 315 Views
This project outlines the development of a solar thermal power plant visualization application for iPhone and iPod Touch. It generates electricity using solar energy, involving components like a tower and heliostats. The app aims to demonstrate the complexities of solar energy generation, including shading and blocking effects in heliostat fields. Key functionalities include dynamic field views and user input mechanisms, with a focus on accurate representation of solar angles and heliostat arrangements. The project serves both educational and marketing purposes.
Simplified Solar Power Plant Visualization For iPhone
E N D
Presentation Transcript
Capstone Team#5 Fall 2009 Simplified Solar Power Plant Visualization For iPhone
Table of Contents Visualization iPhone Fall 2009
Team Information Website: http://dcm.uhcl.edu/capf09g5 Yogesh Banchhod Team Leader Email: ypbanchhod@gmail.com Major: Computer Science Role: Programmer/Research Darshan Chipade Email: dchipade@gmail.comMajor: Computer Information SystemRole: Programmer/Research/Webmaster Syed Zaidi Email: syedhmz@gmail.com Major: Computer Science Role: Programmer/Documentation Mohammed Gooni Email: mohammedgooni@gmail.comMajor: Computer Science Role: Programmer/Research/Testing Visualization iPhone Fall 2009
Instructor/Mentors Information Dr. Michel Izygon Co-Founder, Senior Vice Preident, CTO, Tietronix Software Inc.Email: Michel.Izygon@tietronix.com Dr. Kwok-Bun Yue Professor, Computer Science and Computer Information Systems Chair, Division of Computing and Mathematics University of Houston-Clear Lake Email: yue@cl.uh.edu Peter Armstrong Tietronix Software Inc.Email: peter.armstrong-1@tietronix.com Claus Nilsson Tietronix Software Inc.Email: claus.nilsson@tietronix.com Insiya Iftiqhar Tietronix Software Inc.Email: insia.iftiqhar@tietronix.com Visualization iPhone Fall 2009
Company Information • Tietronix Software, Inc. was founded in 1999 by Victor W. Tang, Michel E. Izygon, Ph.D, and Stuart S. Engelhardt, each of whom has worked on the development of some of the world’s most advanced software-based technology solutions. • Tietronix is a full-service provider of custom software applications and advanced technology solutions for the worlds most selective customers including NASA and Fortune 1000 companies. • The core of Tietronix technical capabilities consists of an unrivaled methodology incorporating Unified Modeling Language and Object-Oriented Technologies, a formula that has led to the company’s 100 percent software development success rate. Visualization iPhone Fall 2009
Introduction • Solar thermal power plant generates electricity from energy of the sun. • Field consists of a tower and heliostats. • A receiver located on top of the tower. • iPhone/iPod Touch Application. • Marketing Purpose. Visualization iPhone Fall 2009
Heliostat • The heliostat is composed of several mirror modules rather than having single large mirror. Visualization iPhone Fall 2009
Shading • Shading occurs at low sun angles when heliostat casts its shadow on a heliostat located behind it. Visualization iPhone Fall 2009
Blocking • Blocking can be observed in a heliostat field by noting reflected light on the backs of heliostats. Visualization iPhone Fall 2009
Requirement Specification • Hardware • iPhone/iPOD Touch • Apple Macintosh • Software • iPhone SDK • Unity Indie 3D Game Engine Visualization iPhone Fall 2009
Current Progress Visualization iPhone Fall 2009
Implementation Task • Specifications from user. • Compute sun and heliostat position. • Formation of the field in a grid view. • Display a single cell. Visualization iPhone Fall 2009
User Input Visualization iPhone Fall 2009
Grid Layout Visualization iPhone Fall 2009
Cell View Visualization iPhone Fall 2009
Demonstration Visualization iPhone Fall 2009
Milestones To Be Achieved • Blocking & Shading Calculation • Dynamic Field View • Deployment on iPhone/iPOD Touch • Testing, Validation and Verification Visualization iPhone Fall 2009
Project Timeline Visualization iPhone Fall 2009
References • “An Algorithm for the Shading and Blocking Computations of a Field of Heliostats Arranged in a Grid Layout”, Peter Armstrong,Tietronix Software, Inc;September 3 2009. Visualization iPhone Fall 2009