10 likes | 17 Views
When the addition of drugs is required, close the side branch valves of the dosing unit. The addition of drugs can be carried out when the valves on both sides of the dosing unit are opened.Install the water inlet and outlet of the dosing unit according to the direction of water flow, to ensure its leak-proofness. Add a few turns of Teflon tape to the helix of the male hose each time before connecting the male and female hoses to ensure a tight seal. For More Information : https://quantumblast.com.au/rust-inhibitor-dosing-unit-installation-manual/ <br>
E N D
RUST INHIBITOR DOSING UNIT – INSTALLATION MANUAL RUST INHIBITOR DOSING UNIT Model: 5801 Product Feature Model: 5801 Proportional Range: 0.4% ~ 4% Flow-Rate Range: 20 ~ 2500 L/H Flow Temperature: 4 ~ 30 °C Water Temperature: 0.2 ~ 6 Kg Inlet & Outlet diameter: ¾ inch PRODUCT INSTALLATION Choose the location: the water inlet and water outlet of the dosing unit must be in accordance with those of the main pipe. Dosing unit must be installed according to the method that the dosing unit is above the fluid intake tube. Fix the dosing unit to a wall or other facilities. Install the water inlet and outlet of the dosing unit according to the direction of water flow, to ensure its leak-proofness. (As shown in figure 2 and 3 below) Install 100-120 mesh screen between the inlets of water valve and dosing unit. When the addition of drugs is required, close the side branch valves of the dosing unit. The addition of drugs can be carried out when the valves on both sides of the dosing unit are opened. Crack sound will be heard when dosing unit begins to work. Currently, push the air vent valve on the top of the dosing unit and release the valve when small amount of water flows out. In this way, normal operation of doser can be ensured. CONTACT US Address : 1K/18 Beafield Road, Para Hills West SA 5096 Australia Phone : 1300 822 569 Email : sales@quantumblast.com.au Website : www.quantumblast.com.au