An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MARS Taskforce RMS Update October 13, 2010

  2. Definitions • AMC – • AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP • AMDG – • 15 Minute LSE data containing both generation and load values , also profile included DG with AMS (IDR) meter type • AMS data included Distributive Renewable Generation  • Estimated – • ERCOT estimated data because profile showed AMS (IDR) meter type, however the 15-minute LSE data wasn’t available in ERCOT’s Settlement system at the time the ESI ID was being processed for Settlement .   

  3. InitialSettlement As of October 5, 2010 Operating Date: September 27, 2010 • AMC ESI ID Totals: 1,522,381AMDG ESI ID Totals: 229 • Estimated ESI ID Totals: 11,051

  4. FinalSettlement As of October 5, 2010 Operating Date: August 9, 2010 • AMC ESI ID Totals: 1,282,123 • AMDG ESI ID Totals: 183 • Estimated ESI ID Totals: 1,764

  5. True-Up Settlement As of October 5, 2010 Operating Date: April 8, 2010 • AMC ESI ID Totals: 721,360 • AMDG ESI ID Totals: 84 • Estimated ESI ID Totals: 2,100

  6. AMS Meter Installation Status Report Oncor(approximately): • Installed: 1,343,458 as of 9.30.2010 • Deployment Plan: • 2010 – 929,000 meters • 2011 – 902,000 meters • 2012 – 902,000 meters

  7. AMS Meter Installation Status Report CNP (approximately): • Installed: 661,238 as of 9.30.2010 • Deployment Plan, includes projected growth: • 2010 – 756,684 meters • 2011 –   960,327 meters • 2012 –   373,423 meters

  8. AMS Meter Installation Status Report AEP (approximately): • Installed: 115,053 as of 9.29.2010 • Deployment Plan schedule: • 2010 – 188,212meters • 2011 –   251,571 meters • 2012 –   279,329 meters • 2013 – 278,280 meters

  9. Market AMSInstalled Totals 2,119,749

  10. PUCT Project 34610 Advanced Metering Implementation Team (AMIT) Documentation & Meeting Schedules can be found on: • Public Utility Commission of Texas Project 34610 Website: • http://www.puc.state.tx.us/electric/projects/34610/34610.cfm

  11. September AMIT Deep Dive Meetings • Deep Dive into Roadmap and Strategic Re-alignment completed in September • ALLAMIT PROJECTS: • Project 1 - Interim Project • Project 2 – Smart Meter Texas Web Portal • Project 3 - ERCOT “Interim” Settlement Solution • Project 4 – Home Area Network (HAN) • Project 5 - Retail Market Interface • Project 6 – Education • Project 8 – “Long Term” Settlement Solution

  12. Deep Dive Results • Deep Dive into Roadmap and Strategic Re-alignment completed in September • ALLAMIT PROJECTS:

  13. Advanced Metering Implementation Team (AMIT) • October • 26-27th (F2F) • Tue: 9:30-5:30 • Wed: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of Meetings available at: http://www.texasadmin.com/puct.shtml

  14. Advanced Metering Implementation Team (AMIT) • November • 2nd (F2F) • Tue: 9:30-5:30         • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • 16-17th (F2F) • Tue: 9:30-5:30 • Wed: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of November Meetings available at: http://www.texasadmin.com/puct.shtml

  15. Advanced Metering Implementation Team (AMIT) • December • 7th (F2F) • Tue: 9:30-5:30         • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of December Meeting available at: http://www.texasadmin.com/puct.shtml

  16. Questions?