An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Some technical aspects of testing and adaptation of existing detectors Gusev Konstantin, Kurchatov Institute / JINR

  2. Preparation of adaptation consists of: • Testing of existing enriched detectors; • Repairing of detector performance in the actual cryostats, if it will be needed; • Estimation of the risks of crystal repacking procedures and Careful check of all necessary operation with typical non-enriched detectors. Gusev Konstantin, Kurchatov Institute / JINR

  3. TESTING OF EXISTING DETECTORS Gusev Konstantin, Kurchatov Institute / JINR

  4. TESTING OF EXISTING DETECTORS For best realization we need: • Spectrometricchannel with the best performance; • Precision pulse generator; • Model of PA first stage. Gusev Konstantin, Kurchatov Institute / JINR

  5. REPAIRING OF DETECTOR PERFORMANCE For heat and pump procedures we must have: Turbo molecular pump with enough efficiency; Nitrogen traps for elimination of any contaminations of detector; Valve for connecting between pump and detector cryostat; Absolutely clear or new vacuum elements (rings, fillers, etc.); Heater, maybe electric fan (temperature not higher than 150°C). Gusev Konstantin, Kurchatov Institute / JINR

  6. POSSIBLE RISKS • Contamination of detector surface because of too early opening of cryostat. • Damage of implantation layer due to careless dismounting of diode from existing support or packing it into the new holder. • Damage of crystal because of too strong pressure in the new support. • Damage of crystal due to thermal shock. • Damage because of keeping and transportation of naked diodes in non-adequate conditions. • Deterioration of lithium layer after too long staying of detectors at room temperature. Gusev Konstantin, Kurchatov Institute / JINR

  7. Conclusions • Testing of all existing detectors. • Repairing of detector performance inside the actual cryostats. Required time for I and II is about one month at best. • For elimination of estimated risks when we open cryostats: • Special tools for accurate repacking must be ready; • Leak proof box for crystals keeping must be ready too; • All adaptation procedures at non-enriched detectors must be realized. Gusev Konstantin, Kurchatov Institute / JINR