mechanics project meeting welcome and introduction n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
MeChanICs Project meeting Welcome and introduction PowerPoint Presentation
Download Presentation
MeChanICs Project meeting Welcome and introduction

Loading in 2 Seconds...

play fullscreen
1 / 9

MeChanICs Project meeting Welcome and introduction - PowerPoint PPT Presentation


  • 96 Views
  • Uploaded on

MeChanICs Project meeting Welcome and introduction. G. Riddone, 22/03/2011. CLIC – 3 TeV. Accelerating structures. TD24#2 at CERN (12 GHz). TD18#3 at SLAC. TD18#2 at KEK. Cu OFE UNS C10100 Shape accuracy ± 2.5 µm Roughness Ra 0.025 µm Ø 45 to 80 mm, 30 disks Length 300 mm. PETS .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'MeChanICs Project meeting Welcome and introduction' - prem


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
clic 3 tev
CLIC – 3 TeV

G. Riddone, MeChanICs,22.03.2011

accelerating structures
Accelerating structures

TD24#2 at CERN (12 GHz)

TD18#3 at SLAC

TD18#2 at KEK

  • Cu OFE UNS C10100
  • Shape accuracy ± 2.5 µm
  • Roughness Ra 0.025 µm
  • Ø 45 to 80 mm, 30 disks
  • Length 300 mm

G. Riddone, MeChanICs,22.03.2011

slide4
PETS

PETS (12 GHz, TBTS)

PETS (11.4 GHz, test at SLAC)

  • - Cu OFE UNS C10100
  • Shape accuracy ± 7.5 µm
  • Roughness Ra 0.1 µm
  • 8 octants
  • Length 300 mm

G. Riddone, MeChanICs,22.03.2011

rf components
RF components

High-power dry load

Hybrid

G. Riddone, MeChanICs,22.03.2011

Variable high power splitter

baseline procedure
Baseline procedure

Engineering design (INPUT: RF design)

Diamond machining (sealed structures)

Cleaning with light etch

J. Wuang

H2 diffusion bonding/brazing at ~ 1000 ˚C

Vacuum baking

650 ˚C > 10 days

G. Riddone, MeChanICs,22.03.2011

J. Wuang

clic two beam module
CLIC Two-beam module

A. Samoshkin

CLIC at 3 TeV (20924 modules)

142812 Accelerating structures

71406 PETS

~ 400000 RF components

CLIC at 500 GeV (4248 modules)

26312 Accelerating structures

13156 PETS

~ 70000 RF components

G. Riddone, MeChanICs,22.03.2011

status
Status
  • Now: end of Critical Design phase  feasibility demonstration
  • From 2011/2011 project preparation phase starts
    • Qualification of new companies
    • Optimization of RF structure fabrication
    • Industrialization and cost optimization
    • ….

G. Riddone, MeChanICs,22.03.2011

mechanics project
MeChanICs Project

https://indico.cern.ch/conferenceDisplay.py?confId=106300

  • FP7/People/IAPP (Industry-Academia Partnerships and Pathways) projectMeChanICs, “Marie Curie linking Industry to CERN”
  • start September 1st 2010, 4 year project
  • to enhance knowledge exchange btwn Partners on precision manufacturing by two-way intersectoralsecondments
  • objective: enable & enhance long term industry participation in CLIC, Compact LInear Collider, RF structure R&D

G. Riddone, MeChanICs,22.03.2011