1 / 48

Technical Associates Ltd.

Technical Associates Ltd. An ISO 9001:2008 Company. Energising India since 1969…. About Us. Manufacturers of. Power and Distribution Transformers upto 220 kV. Turnkey Transmission & Distribution EPC Projects.

posy
Download Presentation

Technical Associates Ltd.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Associates Ltd. An ISO 9001:2008 Company Energising India since 1969…

  2. About Us Manufacturers of Power and Distribution Transformers upto 220 kV Turnkey Transmission & Distribution EPC Projects We offer solutions spanning the full length of Transmission & Distribution Opportunities

  3. About Us • Currently manufacturing transformers from 5 KVA, 11 kV up to 200 MVA 220 kV class • Planned production of Power Transformers upto 765 kV at new plant in India • Manufacturing Capacity: approx. 18,000 MVA p.a. • Turnkey Projects for building electrical substations, transmission & distribution lines upto 400 kV Aggressive Targets, Confidence to grow

  4. About Us: Milestones 1967: Technical Associates Ltd. is founded 1969: TA gets it’s first order for manufacturing 5 kVA, 11KV Distribution Transformers 1973: Present manufacturing location at Lucknow established 1979: TA sets up first Transformer unit in Punjab at Sangrur 1985: Indian Transformer Manufacturers’ Association (ITMA) set up with TAL as a founder member 1991: TA gets ISO 9000 certification for complete transformer manufacturing process 2001: TA becomes regular manufacturer of 40.0 MVA, 132 kV Power Transformers 2006: Manufacturing activities certified by BSI, UK as complying to ISO 9001:2000 standards 2006: Turnkey Power Projects division set up for executing Transmission & Distribution EPC projects. 2007: Work commences on setting up a state of the art manufacturing plant in Sitarganj, Uttarakhand for manufacture of Extra High Voltage Power transformers up to 400 kV class. 2008: State of the art plant commissioned at Sitarganj (Uttarakhand). It will enlarge TAL’s transformer product portfolio to include EHV Transformers up to 400 kV; a quantum leap in manufacturing and technology. 2009: Second Transformer production unit at Sitarganj gets commissioned. 2009: TAL commissions Vapour Phase Drying Plants and Impulse Generators (HAEFELY, Switzerland). 2010: Both plants of TAL certified for compliance with ISO 9001:2008 standard. 2011: TAL delivers it's first 100 MVA 220/132 kV Auto Transformer to APTRANSCO. 2011: TAL executes it's first export order for Power Transformers for ZESCO, Zambia. 2011: TAL successfully type tested for 160 MVA, 220/132 kV voltage class Power Transformer by ERDA Vadodra. 2012: TAL executes export order for Power Transformers for Tokai Power Products Ltd., Bangladesh and Distribution Transformation for ABERME, Republic of Benin, West Africa. 2012: TAL installed UP's first 2 MWp Solar Photovoltaic Power plant in District Barabanki Inaugurated by Honorable Chief Minister of Uttar Pradesh. 2013: TAL executes export order for Power & Distribution Transformers for Energie du Mali, Africa. 2013: TAL received an approval from RDSO for manufacturing and supply of Traction Power Transformers upto 30MVA, 220 KV Voltage class. 2013: TAL received an approval from Power Grid corporation of India Ltd. for supply of 1 Ph. & 3 Ph. Transformers upto 66 KV Class.

  5. Pan India Presence Transformer sales Project Execution Sales Network

  6. Products Portfolio

  7. Power Transformers • 100 MVA, 220/132/11 kV Power Transformer • 12.5 MVA, 66/11 kV Power Transformer • 40 MVA, 132/33 kV Power Transformer

  8. Distribution transformers – Three phase • 8 MVA, 33/11 kV Distribution Transformer • All the above rating can also be manufactured for 33 kV or 22 kV voltage range • Transformers upto 300 kVA, 11/0.433 kV are generally manufactured with aluminum winding, though copper wound transformers can be manufactured if required • Transformers of 315 kVA and higher ratings are with copper winding • Distribution Transformers (11 kV) • Distribution Transformers (33 kV)

  9. Distribution transformers – Single phase wound core • Transformer of 10 kVA are copper / aluminum wound • Transformer of 16 kVA and higher rating can be made either with copper or aluminum or composite windings • Transformer with primary voltage of 11 kV and intermediate ratings are also manufactured

  10. Manufacturing Facilities

  11. Manufacturing process Insulation Conductor Tank fabrication Core Press Board, Insulating paper, Permawood Aluminum / Copper rod Ready cut core Crgo coil Fabricated Tank Slit paper, blocks, spacers, supports, strips Bare Strip / Wire to size Slitting and cutting Paper covering for Strip / Wire Annealing Coil winding LV & HV Tanking End frame fabrication Core assembly Coil pre heating & pressing Oil filling Core coil assembly Filtration Ratio check Testing Main assembly connections Inspection Ratio Check Dispatch Vacuum Drying/ Vapour Phase Drying

  12. Manufacturing facilities – Ismailganj, Lucknow • Spread out over 8 acre area with ~ 6,000 sq. meters of covered sheds • Shops are of adequate height with liberal floor area and are equipped with E.O.T cranes and other material handling facilities • Separate facilities have been earmarked for assembly of Distribution and Power Transformers • TAL has invested heavily in backward integration and does in-house production of major raw materials • Core processing (Slitting, Cutting and Annealing) • Conductor manufacturing (Drawing, Annealing and Paper covering) • Transformer oil processing • Tank fabrications • Winding • Assembly and tanking • Manufacturing capacity of ~ 4,000 MVA per annum of mixed transformer ratings • Paper Covering facility for conductor • Power Transformer Bay • Distribution Transformer Bay • Power Transformer Test Station

  13. Lucknow plant Winding Machines for handling heavy weight coil winding at variable speeds upto 10.0 MT capacity Core Cradles designed especially for high quality large Core Assembly

  14. Lucknow plant Complete facilities for Insulation cutting/ processing

  15. Lucknow plant Complete facilities for Drawing of Round/ Rectangular Copper/ Aluminium conductor for use in Transformer windings Multi Layer Paper strip covering machines for Winding conductor

  16. Lucknow plant Cranes of 5, 10, 25, 35, 150 MT lifting capacity

  17. Lucknow plant Power Transformer Assembly Power Transformer Assembly Sheds with adequate space and roof heights for fast processing

  18. New manufacturing facility at Sitarganj T8: Fabrication T9: 220/ 400 kV Assembly T2: 33 kV transformer assembly T9: Impulse Test Area T7: Core Slitting, cutting, annealing T1: 11 kV transformer assembly T6: 66/ 132 kV Assembly & Testing EHV Test Area T5: 66/ 132/ 220/ 400 kV Winding T4: Insulation Processing T3: Central Store New Plant in Uttarakhand, North India

  19. Manufacturing facilities – Sitarganj • Spread out over 12.5-acre area and is fully equipped to manufacture EHV power transformers upto 765 kV voltage class • The manufacturing sheds occupy a total covered area of ~ 23,000 sq.m. ranging from 4 m to 24 m in height, and spans of 12 m to 24 m • The plant has been designed for optimal material and work flow, and integrated manufacturing operations with separate bays planned for: • Single phase and Three phase 11 kV distributions transformer • Three phase 33 kV distribution transformer • Three phase 66 & 132 kV power transformer • Single phase and three phase 220 to 765 kV power transformer • Coil winding • Insulation processing • Mild steel fabrication • Impulse testing set-up • Manufacturing capacity of 14,000 MVA per annum of mixed transformer ratings. Would be able to manufacture and deliver one 132 kV transformer per day • Material Handling Facility up to 300MT (2 X 150) • Distribution Transformer Bay • Power Transformer Test Station • Power Transformer Bay

  20. New manufacturing facility at Sitarganj

  21. New manufacturing facility at Sitarganj

  22. New manufacturing facility at Sitarganj

  23. New manufacturing facility at Sitarganj

  24. 66/132 kV Winding Area

  25. 66/132 kV Winding Area

  26. 66/132 kV Winding Area

  27. 66/132 kV Winding Area

  28. 66/ 132 kV - Assembly

  29. 66/ 132 kV - Assembly

  30. 100 MVA 220/132/11 kV Auto Transformer CCA

  31. Autoclave with Vacuum capability upto 1.0 Torr

  32. 132 kV transformers under test

  33. 132 kV transformers under test

  34. 66/132 kV test station

  35. 220/ 400 kV assembly with 2x150 MT EOT cranes

  36. Impulse Test area: 1600 kVP, 160 KJ Impulse Generator

  37. Design & engineering and R&D EXPERT DESIGN & ENGINEERING TEAM TAL’s GM and senior consultant are both Ex GMs of BHEL The director of the design & engineering has been working with TAL for last 41 years STRONG R&D TAL has strong R&D team having capabilities of developing new products in house All the products manufactured by the company have been developed in-house including the 220 kV & 132 kV transformers The company has a fully computerized design office and all transformer designs are done on the basis of in-house developed software For mechanical design, Computer Aided Design tools like AutoCad & Solidworks are used extensively Large number of TAL transformers have successfully cleared Impulse Voltage Withstand Capability tests at 3rd party, Government accredited Laboratories like CPRI (Central Power Research Institute) TAL also has some of the largest no. of transformers that have cleared 3rd party short circuit tests, amongst companies of TAL’s size TAL has a very strong, highly experienced design & engineering and R&D team capable of taking new challenges

  38. Testing facilities OVERVIEW Independent testing facilities for distribution and power transformers at both Lucknow and Sitarganj plant. Fully automated, computerized test benches & advanced testing software for all routine tests and temperature rise tests as per international standards like IS 2026 and IEC 60076. In-house facilities created for ALL routine tests, Type tests such as Temperature Rise & Impulse test, and specialised tests such as FRA, Noise & Vibration measurement, etc. Short circuit tests are subjected to third party testing at CPRI (India’s leading, independent test centers). Impulse voltage withstand ability tests are carried out through two impulse generators (1600 kVp, 160 kJ and 900 kVp, 45 kJ) from Haefely, Switzerland with expandable capacity to test transformers of 765 kV voltage class. Impulse Testing Facility Testing with Yokogawa Power Analyzer

  39. Our Quality Policy Q We, at Technical Associates, are committed to achieve total satisfaction of our customers by: • Effectively implementing and continually improving the Quality System. • Delivering on time, products conforming to agreed specifications at competitive prices. • Collectively and individually striving to do things right – the first time and every time - both in personal life as well as at the workplace. • Continuous up-gradation of technology and active involvement of all employees and associates in productivity improvement.

  40. Critical Quality check points Q • Core • Grade of Material • Laminations Burr Level • Pocket Height & Tolerance • Clamp Plate / Tie Road Dimensions & Material • Windings • Transposition • Concentricity of Blocks - Axially & Radially • Proper Ducts for Cooling & Voltage Withstand • Measurement of Winding Resistance • Tank • Pressure & Vacuum Tests • Dye Penetration Test on Lifting Components (optional) • Core- Coil & Terminal Gear Assembly • Radial & Axial Gap Measurements - as per Core-Coil Drg. • Checking of Cable, Flats Dimensions & Paper Insulation Thickness • Route of Cables, Flats & their Gaps w.r.t End Fames, Tank, Coils, OLTC, Earth Points etc. • Measurement of Ratio, Winding Resistance, Magnetizing Current, Vector Group, %Z & Load Loss, Core-Isolation • All Taps Resistance Measurement to ensure joints Healthiness • Processing • At 100°C ± 5°C & upto1.0 torr Vacuum • Meggar& PI Values Measurements after Core & Coil Assembly Processing • Tanking • Electrical Clearances in Oil & Air • Core & Coil Assembly Locking at Tank Base & Tank Cover • Core Earthing • All Routine Tests as per IS:2026/IEC:60076 • Additional tests on Customer requirements • RSG Test at Low Voltage- To Ensure Insulation Requirement at Different Points • SFRA Test to ensure Healthiness of Core, Coil & Assembly- At our Works & At Site • Temperature Rise Test & Impulse Voltage withstand Tests - at least on one unit of each design • Measurement of Surface Temperature by Non Contact Type Electronic Gun • DGA Test before & After Heat Run Test • S/C Test as per IS:2026/IEC:60076 – on Customer request • Tests before Dispatch • Over Excitation of Transformer at 125% Rated • Measurement of Magnetizing Current at Low Voltage • Magnetic Balance Test • Measurement of Polarization Index

  41. Turnkey Projects

  42. Turnkey Projects • TAL Engineering Projects Division (EPD) was established in 2006 to enhance and capitalize Technical Associates’ strong presence in the power T&D sector • It undertakes complete execution of turnkey electrification projects from conceptualization , design, engineering, procurement, erection and commissioning • The tasks taken up by TAL EPD include Rural Electrification Works, Distribution & Transmission lines from LT (440 V) to 220 kV, and electrical Substations from 11 kV to 220 kV • Scope of works undertaken include: • Complete design, engineering & planning • Procurement & project management • Erection / construction / commissioning / testing • Handing over to customer / training • Works undertaken include: • Planning, erection and commissioning of HVDS network • Rural electrification planning and commissioning • Setting up of LT lines for urban / Rural networks • Setting up of 11 kV distribution substations and lines • Setting up 33/66/132/220 kV switch-yards and lines • Energy auditing • Planning, erection and commissioning of intelligent rural load management systems • Main strengths : • Experienced engineers, technicians & support staff from the field of project tendering, engineering, execution, erection, commissioning and testing • High level of quality control • 66 kV Sub-station with TAL transformer • 132 kV Sub-station under construction • 66 kV Sub-station at Mohra, Haryana

  43. Organisation Profile

  44. Organization structure CMD Director GM (Sales-Marketing) GM (Finance) GM (Technical) Quality Head Plant Head (Sitarganj) GM (Production) GM HR Head- Material Management Head- IT CEO (Projects)

  45. People: The TA edge TAL Engineers & Managers at the Lucknow Corporate Office

  46. Customers CUSTOMER SEGMENTS Key customer segments catered by TAL include: • State (regional) electricity utilities • Overseas electricity boards. • Government & private power companies • Government and private power equipment manufacturing companies • Infrastructure companies • Other manufacturing companies State electricity boards account for more than 90% of the total turnover of the company KEY CUSTOMERS

  47. Our Strengths • Transformer of 40 MVA, 132/33 KV has already been Designed, Manufactured & Tested successfully for all Routine & Type (including Temperature Rise & Impulse Voltage) Tests. • 25/20 MVA, 132/33 KV Transformer for RRVPNL; 20 MVA, 132/11 KV Transformer for PSEB & 31.5/25 MVA, 66/11 KV Transformer for HVPNL have been tested successfully for all Routine, Type & Special Tests; including Short Circuit Test. • 100 MVA, 220/132/11 KV transformer for APTRANSCO under manufacturing at Sitarganj. • TAL approved for supply of transformers upto 200 MVA, 220 kV by MSETCL • Lucknow facility approved for repair of Power Transformers upto 160 MVA, 132 kV by UPPTCL. • 70 nos. of 66 KV & 132 KV Power Transformers successfully cleared Lighting Impulse Voltage test in 1st Attempt. • 20 nos. of 66 KV & 132 KV Power Transformer s successfully cleared Short Circuit Test in 1st Attempt. • Winding failure at site is zero (Total 800 Nos. of Power Transformers supplied to various customers so far). • We are established manufacturers of 132 KV & 66 KV Power Transformers since 1997. • Regularly achieving polarization index > 2.0 (600/60 sec) indicating proper dryness of the winding. • We are using Wall Shunts/ Yoke Shunts, wherever required, for reduction of Stray Losses Boltless Core – Low No Load & Low Magnetizing Current. • TAL successfully type tested for 160 MVA, 220/132 kV voltage class Power Transformer by ERDA Vadodra. • TAL approved for supply of supply of manufacturing and supply of Traction Power Transformers upto 30MVA, 220 KV Voltage class by RDSO. • TAL approved for supply of supply of 1 Ph. & 3 Ph. Transformers upto 66 KV Class by Power Grid corporation of India Ltd. (PGCIL)

  48. Partnering with us - the advanTAge • A proven track record • Historically proven capabilities in engineering / design • State-of-the-art infrastructure • 40 year old credibility • Close proximity Your Partner in Progress

More Related