1 / 8

Plan for future GaAs samples for TestBeam measurements

Plan for future GaAs samples for TestBeam measurements. JINR DLNP group (presented Z. Krumshteyn). FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen. Table 1. GaAs samples 2008. FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen.

pisces
Download Presentation

Plan for future GaAs samples for TestBeam measurements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plan for future GaAs samples for TestBeam measurements JINR DLNP group (presented Z. Krumshteyn) FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  2. Table 1. GaAs samples 2008 FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  3. Table 2. GaAs samples 2008(Fabrication method) FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  4. Table 3. experimental GaAs detectors 2009 FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  5. 160-200 µm 300 µm Shape of GaAs sample 2008 Shape of GaAs sample 2009 FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  6. In Joint Institute for Nuclear Research (JINR), Dubna the project of new Intense REsonance Neutron source (IREN) is under construction now. The IREN will be used as a neutron source of new generation for research of the broad spectrum of problems in fundamental and applied nuclear physics. The IREN source is intended for nuclear physic investigations by a time-of-flight on a place and in a building of LUE-40 + IBR-30 installation removed from operation, thus the existing infrastructure of eight neutron beams with fly paths from 10 up to 750 m, an experimental hall and measuring pavilions is completely used. The IREN source exploiting a booster principle should provide a fast multiplication of initial neutrons produced by an electron beam from a linear accelerator in electron-neutron converter.So its design has to ensure as short as possible time t <10 ns for one act of neutron multiplication into a subcritical blanket, the total duration of a fast neutron pulse about 400 ns with the repetition rate 150 Hz, and a neutron yield at a level 1015 n/s. The project will be implemented in two stages. At the first stage the linear accelerator and nonmultiplying target will be constructed. FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  7. COMPARISON OF THE IREN SOURCEWITH OTHER NEUTRON SOURCES AIMED FOR NUCLEAR PHYSICS t – duration of fast neutron burst ; dt – real duration of neutron pulse at En = 100 eV after moderation of neutrons; С is define by relation φ(En)=C/ En*L2 ,were φ(En ) – neutron flux with energy Еn (eV) on the 1 cm2 sample, located on the distance L meter from source, а <In >- total yield of neutrons per second. FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

  8. LINEAR ACCELERATOR The travelling wave electron linac LUE-200 was designed at the Budker Institute of Nuclear Physics (BINP), Novosibirsk IREN 1-st stage parameters FCAL Collaboration Meeting , June 29 -30, 2009, Zeuthen

More Related