proposed itc roadmap n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Proposed ITC Roadmap PowerPoint Presentation
Download Presentation
Proposed ITC Roadmap

Loading in 2 Seconds...

play fullscreen
1 / 6

Proposed ITC Roadmap - PowerPoint PPT Presentation


  • 115 Views
  • Uploaded on

Proposed ITC Roadmap. Mar 30, 2005. Overview. Define ITC’s long-term goals Recognize schedule ITC is working toward Map long-term goals to Schedule. ITC’s Long-Term Goals. Progress has occurred during Feb/Mar ’05 ITC meetings Several discussions resulted in common high level goals

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Proposed ITC Roadmap' - pierce


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
overview
Overview
  • Define ITC’s long-term goals
  • Recognize schedule ITC is working toward
  • Map long-term goals to Schedule
itc s long term goals
ITC’s Long-Term Goals
  • Progress has occurred during Feb/Mar ’05 ITC meetings
    • Several discussions resulted in common high level goals
    • Duaine Pryor (Mentor Graphics) summarized the discussion topics into presentation form
  • Appears to be a general agreement on high-level goals:
    • Maintain existing SCE-MI goals (performance, portability, compatibility with SCE-MI 1.X)
    • Support a common verification environment and model architecture for both simulation and emulation, …thereby
      • broadening use of acceleration by end-users
      • broadening the availability of common verification-IP in the market.
  • General agreement on ‘how’ to achieve high-level goals
    • Lower ‘barriers-to-entry’
      • Ease modeling effort
      • Ease use model adoption
      • Maintain performance focus
itc schedule
ITC Schedule
  • Accellera Board has tasked ITC:
    • Bring out next revision of SCE-MI (2.0) ‘within a year’
  • Proposal: ITC should aim for yearly updates to standard
    • Provide real benefit and improvement in a timely manner
    • Demonstrate progress and member cooperation to end-user and IP providers to bolster ‘permanent’ view of SCE-MI
    • Take ‘small’ (one-year-sized) steps in evolution of the standard, allowing IP providers to ‘keep up’ with changes.
map goals to schedule
Map Goals to Schedule
  • Generally-Agreed Goals are quite broad
    • Focus on Interface issues
  • Continue to refine long-term SCE-MI goals as a background task
    • Define 2-year/3-year plan at high-level
    • Possibly a separate committees for
      • Modeling-related issues (Modeling Technical Committee, MTC?)
      • Usability, application and debug issues (the ”other” basket)
  • Plan first step (version 2.0) along long-term roadmap of SCE-MI:
    • ITC-agreed first steps (in late 2003)
    • These near-term goals fit within the context of the long-term goals discussed in Feb/Mar ’05 ITC meetings