1 / 10

16ng WG IP over IEEE 802.16 Networks

16ng WG IP over IEEE 802.16 Networks. 67 th IETF, San Diego. Soohong Daniel Park ( soohong.park@samsung.com ) Gabriel Montenegro ( gabriel_montenegro_2000@yahoo.com ). Preliminaries. Blue sheets Scribes. Agenda (1/3). Administrative – chairs 15 mins Agenda bashing WG report

phoebe
Download Presentation

16ng WG IP over IEEE 802.16 Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 16ng WGIP over IEEE 802.16 Networks 67th IETF, San Diego Soohong Daniel Park (soohong.park@samsung.com) Gabriel Montenegro (gabriel_montenegro_2000@yahoo.com) - 16ng @ 67th IETF, San Diego -

  2. Preliminaries • Blue sheets • Scribes - 16ng @ 67th IETF, San Diego -

  3. Agenda (1/3) • Administrative – chairs 15 mins • Agenda bashing • WG report • Interim report • IEEE 802.16 liaison report – DJ Johnston 5 mins - 16ng @ 67th IETF, San Diego -

  4. Agenda (2/3) • 16ng problem statement – Daniel Park 10 mins • WGLC issues • Goal: Ready for the IESG (Informational RFC) • IPv6 link model analysis – Dave Thaler30 mins • WGLC issues • Goal: Ready for the IESG (Informational RFC) • IPv6 over IPv6CS – Basavaraj Patil 30 mins • WGLC issues • Goal: Ready for the IESG (Proposed Standard RFC) - 16ng @ 67th IETF, San Diego -

  5. Agenda (3/3) • IP over EthernetCS – Max Riegel 30 mins • ID: draft-riegel-ip-over-eth-over-80216-01 • Goal: WG adaptation • IP over IPv4CS – Daniel Park 10 mins • ID: none • Goal: Introduction to the work • Closing – chairs 05 mins Total: 135 mins - 16ng @ 67th IETF, San Diego -

  6. What happened from 66-IETF (1/2) • July 21 • IEEE 802.16 liaison (DJ Johnston) to the IETF • July 24 • DT foundation (IPv6 Prefix Subnet Model Analysis) • August 31 • A new technical advisor – Dave Thaler • September 12 – 13 • 1st 16ng interim meeting in Mannheim hosted by Siemens • September 28 • Call for consensus on IPv6 link model • Per-MN model was selected - 16ng @ 67th IETF, San Diego -

  7. What happened from 66-IETF (2/2) • September 29 • Milestone was updated  next slides • A new deliverable was added • draft-ietf-16ng-ipv6-link-model-analysis • Not trimmed WG charter • October 12 • WGLC on draft-ietf-16ng-ipv6-link-model-analysis-00 • Informational RFC • October 17 • WGLC on draft-ietf-16ng-ps-goals-00 • Informational RFC • October 27 • WGLC on draft-ietf-16ng-ipv6-over-ipv6cs-01 • Proposed Standard RFC - 16ng @ 67th IETF, San Diego -

  8. Milestone (1/2) • Oct 2006 Working Group Last Call on IPv6 over IPv6 CS transmission over IEEE 802.16 networks • Oct 2006 Working Group Last Call on IPv6 subnet model analysis • Oct 2006 Working Group Last Call on 16ng problem statement, goal and requirement • Nov 2006 Submit IPv6 over IPv6 CS transmission over IEEE 802.16 networks to IESG for publication as Proposed Standard RFC • Nov 2006 Submit 16ng problem statement, goal and requirement to IESG for publication as Informational RFC • Dec 2006 Working Group Last Call on IP over Ethernet CS transmission over IEEE 802.16 networks • Dec 2006 Submit IPv6 subnet model analysis to IESG for publication as Informational RFC • Dec 2006 Working Group Last Call on IPv4 over IPv4 CS transmission over IEEE 802.16 networks - 16ng @ 67th IETF, San Diego -

  9. Milestone (2/2) • Jan 2007 Submit IP over Ethernet CS transmission over IEEE 802.16 networks to IESG for publication as Proposed Standard RFC • Jan 2007 Submit IPv4 over IPv4 CS transmission over IEEE 802.16 networks to IESG for publication as Proposed Standard RFC • Mar 2007 Working Group Last Call on IP deployment over IEEE 802.16 networks • Aug 2007 Submit IP deployment over IEEE 802.16 networks to IESG for publication as Informational RFC • Aug 2007 Review on draft-ietf-mipshop-fh80216e to be ready to IESG in conjunction with MIPSHOP WG - 16ng @ 67th IETF, San Diego -

  10. Interim Meeting • Mannheim Sep 12-13 • Hosted by Siemens • Two days of good discussion on: • IPv6 over IPv6 CS • Much discussion on the design team analysis • Resulted in consensus call on per-MS prefix model • IP over ETH CS • Some consolidation of editors and text • Initial discussions which led to a subsequent teleconf • IPv4 over IPv4 CS • No discussion then - 16ng @ 67th IETF, San Diego -

More Related