wisdot updates n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
WisDOT Updates PowerPoint Presentation
Download Presentation
WisDOT Updates

Loading in 2 Seconds...

play fullscreen
1 / 26

WisDOT Updates - PowerPoint PPT Presentation


  • 93 Views
  • Uploaded on

ACEC/WisDOT Transportation Improvement Conference. WisDOT Updates. March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development. WisDOT Updates. Preventive Maintenance (PM) Agreement 3D Technology Initiatives in: Design Construction. PM Agreement. PM Agreement.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'WisDOT Updates' - petra


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
wisdot updates

ACEC/WisDOT Transportation Improvement Conference

WisDOT Updates

March 10, 2011

Jerry Zogg, P. E.

WisDOT – Bureau of Project Development

wisdot updates1
WisDOT Updates
  • Preventive Maintenance (PM) Agreement
  • 3D Technology Initiatives in:
    • Design
    • Construction
pm agreement1
PM Agreement

Current Status:

  • PM Agreement executed by WisDOT and FHWA in Nov 2010
  • WisDOT published the new PM Agreement and FDM 3-1-5 in FDM Transmittal

No. 379 on 12/21/10

pm agreement2
PM Agreement

Key Improvements:

  • Provides definition of a “pavement in good condition” to better clarify eligible work
  • Reformatted PM Agreement for easier use by creating table of eligible work and requirements.
pm agreement4
PM Agreement

Key Improvements (con’t):

  • Identifies 3 Groups of Pav’t Treatments
  • Provides proper balance between:
    • Engineering efforts
    • Safety requirements
    • Need to preserve infrastructure
pm agreement6
PM Agreement

Key Improvements (con’t):

  • Provides more flexibility to allow substandard roadside slopes to remain depending on crash history
  • Allows PM projects to continue if safety issues identified. Document safety issues and address with future programming
pm agreement7
PM Agreement
  • Abbreviated DSR for some PM Projects
  • In-house Statewide Webinar on new PM Agreement

on April 11

3d initiatives design construction1
3D InitiativesDesign & Construction

Today’s Topics:

  • Civil 3D Implementation
  • 2011Pilot Efforts on USH 10
    • Use of WisDOT produced 3D Models
    • Automated Machine Guidance (AMG) for HMA Base Course
  • Building Information Model (BIM) Implementation in SE Region
civil 3d implementation
Civil 3D Implementation
  • Began statewide implementation mid-July of 2010
  • Currently have approx:
    • 130 staff statewide engaged in training
    • 15-20 projects underway
  • Have requested Regions to begin new projects with Civil 3D
  • Methods Staff:
    • Rick Larson
    • Brad Hollister
    • Eric Arneson
    • Lisa Herrmann
pilot efforts ush 10
Pilot Efforts – USH 10
  • Wis Rapids in-house staff wrapping up 4 major grading/base/paving projects in Civil 3D
  • 1st - 3D Models designed/produced in Civil 3D
  • Key PD staff:
    • Nick Voss
    • Kyle Harris
    • Kevin Garrigan
    • Jeff Stewart
    • Matt Bronson
next steps for 3d models
Next Steps for 3D Models
  • Determine ultimate requirements for 3D Models
  • Feedback from USH 10 pilots very important
  • Set future dates for:
    • 3D models to be a required PSE deliverable
    • SunsettingCAiCE
    • Transitioning out of

Microstation for

Roadways

next steps for amg
Next Steps for AMG
  • Finalize AMG spec for HMA base & incorporate into Std Specs
  • Begin efforts to prepare for the use of AMG for:
    • PCC pav’t & base
    • HMA pav’t
  • Above uses of AMG will

require combination of

    • GPS
    • Laser

to achieve vertical accuracy

bim implementation in se
BIM Implementation in SE
  • Static/Mobile LiDAR - Data Collection:

Integrated Static/Mobile LiDAR Project-Zoo IC

  • BIM/CAD - Design/Construction:

3D-4D BIM Pilot Project-Mitchell IC Tunnels/Zoo IC

  • AMG Grading/GPS Rovers-Construction Inspection:

I-94 North-South Project

  • BIM/GIS - Assets/Infrastructure Lifecycle:

O&M-As-Builts, Planning-PIP, etc.

bim work flows data flows
BIM Work Flows & Data Flows

WisDOT Design-Construction

Oversight/Integration/Coordination

Roadways, Structures, Geotech, Utilities, FTMS, Signals, Survey, Geotech, Materials,

Traffic, Environmental, Materials Lighting Environmental

Clash Detection, Analysis, Simulation & Visualization (Navisworks/Navigator)

Clash Resolution (Navisworks/ Navigator-Civil 3D Microstation) (RFIs/DINs/Plan Revs)

Existing & Proposed 3D Models (MS/In-roads & C3D to LandXML to Navisworks &

Revit Structures/MEP to Navisworks + Construction Tasks/Sequences/Scheduling

(Primavera Expedition/MS Project Schedules to Autodesk Navisworks/Bentley Navigator)

Paving/Structures/Misc-

(Roads, Ramps, Tunnels, Bridges,

Ret./Sound Walls, Sign Bridges,

RRs, PM, Traffic, Geotech, etc.)

Surfaces-DTMs/TINs

(Conventional/Photogrammetric

/GPS/LiDAR generated DTMs

& Field-checked DTMs)

Utilities-UG/AG/OH

(Storm, Sanitary, Water, Electric, Gas, FO, TV, Tel, Comm, FTMS, Lighting, Fire Protection, etc.)

great week in wi sports
Great Week in WI Sports !

Super Sunday !

Spectacular Saturday !