An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A CASE STUDY in actualenergy conservation Presented By Energy-Environment-EconomicsLLC E3

  2. What is a Kilo-Watt (kW)? A Kilo-Watt Hour? • What is it? A Kilo-Watt-Hour? • 2500 square foot house uses approximately 10 kW • What is it worth? • .10$/kWh? • 10-15$ per kW? • If energy costs remained constant over the years, nobody would be at this presentation and all of these system types would still be in vogue • Double duct systems • Multi-zone air handling units • Constant flow air and water systems • No energy management capabilities

  3. Commissioning Design Phase Construction Phase Acceptance Phase

  4. Commissioning Defined???? • ????????? • No Industry Standards • To some it is a glorified Test and Balance job • To some it is a point to point verification • To others it is a “installed per the CD’s” process

  5. What Commissioning is NOT • Systems Optimization • Problem solving • Operation and Maintenance cost control • The biggest bang for your energy buck, environment buck, or economic buck (E3 that is) • The final destination on your HVAC Systems Energy Conservation journey

  6. What is OptimissioningSM?? • Combination of Commissioning and Systems Optimization • Identifies pre-existing system deficiencies and develops protocols for remediation • Saves energy by fixing your problems, then and only then can the system be optimized for further energy savings

  7. WAATS CMSB - How did it all start? • Inability to use the p/f heat exchanger • Excessive utility costs • Data Rooms temperature and humidity control problems • Bentley Engineering report concluded • Save $$ by adding more capacity???? • Already had 3 times the actual required capacity

  8. Facility Description • Built in 1992 • Houses 2 simulator bays with 2 helicopter simulators each; supporting Data Rooms with Liebert CRAC units • 2nd floor office/training/conference areas • 3 chillers/towers/pumps • Hot/chilled water air handling units • Variable air and water flows • BacNet DDC system

  9. Pre and Post OptimissioningSM Energy Consumption • The following slides graphically illustrate energy consumption of the facility. We believe no explanation is necessary, except to say that the results – nearly a 50% reduction in KW and KwH consumption – are nothing short of spectacular considering that only the HVAC component of the facility’s energy consumption was addressed

  10. CMSB Energy Usage 2003-2005

  11. CMSB Energy Usage 2003-2005

  12. CMSB Energy Usage 2003-2005

  13. CMSB Energy Usage 2003-2005

  14. Cooling Degree Days

  15. Chilled Water System before

  16. Chilled Water System before

  17. Chilled water system current status • One chiller system now satisfies the building, saving approximately 250 kW • Turned off 6 Liebert CRAC’s, even during plate/frame operation, saving another 30 kW • Plate/frame used 4-5 months/year • DDC system in complete automatic, all setpoints optimized • Expected to save approximately 1,200,000kWh this year

  18. What does it take? • Leadership • Vision • Talent • Experience • Thinking outside the box • COMMITTMENT

  19. Other benefits??? • Besides reduced energy costs • Extended system life expectancy - all 3 chillers at CMSB with 30,000+ hours each, only one was ever required • Improved space conditions • Reduced O&M costs • More $$ for energy projects, including renewable energy projects

  20. Commissioning • First step • Identifies existing O & M deficiencies • Necessary to develop OptimissioningSM plan • 5-10% savings from straight commissioning • latest from CCC - 1.2 million s.f., saves 62K$ • Minimum of 30% from OptimissioningSM

  21. Retro-Commissioning • A process to commission existing buildings • Will identify problems • Will result in $$ savings • Is NOT Systems Optimization • Will identify functional issues, will not develop the engineering required to provide solutions • Will evaluate EMCS (if existing) point-to point communication, will not evaluate performance of controls sequences

  22. A combination of commissioning and systems optimization Savings 3-5 times traditional commissioning Specialized skill set required systems acumen troubleshooting skills controls expertise engineering talent OptimissioningSM

  23. Typical Characteristics of Troubled Systems • Inability to maintain design supply chilled water temperature during any occupied hour of the year • Constant hot/cold complaints • Out of capacity without adding square feet? • LARGE power bills? • Excessive maintenance costs

  24. Low system DT’s are a capacity and energy conservation cancer • Delta T is the difference between entering and leaving chilled water • Low (less than design) results in loss of capacity, temperature and humidity control problems • Reasons vary, but typically is a misunderstood phenomenon • Default response is to almost always add more capacity – is unnecessary and expensive

  25. Thanks again for your time!! Energy-Environment-Economics.LLC www.e3-az.com ethree1@cox.net