Enhancing Application Performance with Jumbo Packets: Insights from the 9k MTU Project

DESCRIPTION

Join experts from across North America as they share insights on the 9k MTU Project, a collaborative initiative aimed at improving application performance using Jumbo Packets. This workshop, held in Vancouver, BC, covers technical advancements, application-driven performance metrics, and the use of lightpaths in high-energy physics, biochemistry, and distributed systems. Speakers include Bill Rutherford, Kevin Walsh, and others from leading institutions such as NASA, Canadian universities, and tech organizations. Explore real-world applications and collaborative frameworks in drug discovery and beyond.

1 / 20

Download Presentation

Enhancing Application Performance with Jumbo Packets: Insights from the 9k MTU Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jumbo PacketsforApplication Performance Joint Techs Workshop Vancouver, BC 2005

  2. CA*net4 – 9k App Project HEPnet WestGrid Subatomic Physics

  3. Internet2 9k MTU Project • Bill Rutherford (Rutherford Research/RRX) • Kevin Walsh(Cal-ITEC/SDSC) • John Moore (NC-ITEC/NCSU) • Loki Jorgenson (Apparent Networks/SFU) • Paul Schopis (ITEC-Ohio/OARnet) • Jorge Serran (CUDI2/UNAM) • Dave Hartzell (NASA Ames Research Center) • Bill Jones (University of Texas-Austin) • Woojin Seok (Supercomputing Korea/KISTI)

  4. CA*net4 9k App Project • Bill Rutherford (Rutherford Research/RRX – Project Coordinator) • Loki Jorgenson (Apparent Networks/SFU – Project Coordinator) • Thomas Tam (CANARIE/CA*net4 – CANARIE/UCLP Coordinator) • Bryan Caron (TRIUMF/UofAlberta – TRIUMF/UCLP Coordinator) • Randy Sobie (HEPnet/UVic – HEPnet President/Grid Integration) • Brian Corrie (WestGrid/IRMACS/SFU - IRMACS Coordinator) • Rob Ballantyne (IRMACS/SFU - IRMACS Network Coordinator) • Martin Siegert (WestGrid/SFU – WestGrid/GridStore Coordinator) • Dave Bickle(HEPnet/UVic – HEPnet Coordinator/Grid Integration) • Ken Howard(Network Services/UVic – Network Coordinator) • Peter van Epp(Network Services/SFU – Network Coordinator)

  5. 2 yrs 1 yrs 3 yrs 9k DDS Project 9k MTU Project 9k App Project Core R&E Router Troubleshooting Large Xfer Measurements International Links Internet 2 Sponsored Physics Participants Manual Lightpath TRIUMF to CERN Test Few 9k Taps onto Core Main Tap SDSC Lightpath R&E Non-Routed… UCLP Build Dedicated 9k Links ZX GBICs/quad gigE/campus MM CANARIE NETERA BCNET 3 Universities Only 9k Link on Campus Physics & Biochem Participants HEPnet - WestGrid - TRIUMF 9k Node - HPC - 9k Node Viz HPC 9k Tests NFS HPC 9k Tests Lightpath R&E Clone-Tune 9k APP… Handoff Provide 9k Switch Biochem UVic - SFU - UofA Prelim 9k SOA Framework Drug Discovery System Flow Tune 9k SOA Framework Integrate 9k SOA Framework Demo 9k SOA-DDS Based Collab 9k SOA-DDS Software Dev Examples Complete Handoff … ;-) 9k MTU > App > DDS

  6. What are Jumbo Packets ? Why 9K ?

  7. Internet2 9K MTU Project - 2003

  8. CA*net4 9K MTU Project - 2004

  9. Approaching Application Performance • Metrics for network applications • E.g. MOS as indication of VoIP performance • Ranges of network behaviors • Models of dependence • ITU Y-1541 exemplar

  10. Application Test Bed

  11. 9k APP Project – Lightpaths

  12. 9k APP Project - Short Circuit Routing 1.5k 9k

  13. Approaching User Experience • User-driven application performance • Examples… • Interaction with 3D models • Collaboration with multiple models/data/voice/video • Massive data set manipulation • Typical applications • 3D Visualization on remote server • Distributed file systems

  14. 9k APP – Test Results Raw performance SFU to Devstore UoA to Devstore

  15. 9k APP – File System Results Raw performance Bonnie performance SFU to Devstore SFU to Devstore

  16. 9k APP – File System Results Raw performance Bonnie performance SFU to Vizserver SFU to Vizserver

  17. 9k APP – File System Results Raw performance Bonnie performance Data Missing UoA to Vizserver UoA to Vizserver

  18. NEXT PHASE9k DDS Project – Drug Discovery System • Combined Physics, Viz, Grid, Bio • Preliminary integration (SOA) • Collaborative viz • Distributed files (databases) • Instruments (XRD, NMR) • GTK4 integration • UCLPv2 integration

  19. 9k DDS Project – Network Overview

  20. End of Presentation