1 / 7

HCAL DPG in LS1

HCAL DPG in LS1. Olga Kodolova and Sunanda Banerjee. From Lucia. Re-reconstruction of data and simulated events The massive re- reco of all data (2.1 billions) is foreseen during 2013.

pepin
Download Presentation

HCAL DPG in LS1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HCAL DPG in LS1 Olga Kodolova and Sunanda Banerjee

  2. From Lucia • Re-reconstruction of data and simulated events The massive re-reco of all data (2.1 billions) is foreseen during 2013. CMS also has “parked” data (1.2 billions which were not reconstructed during 2012 year but just kept at the mass storage). Part of the parked data (depending on the available resources) will be reconstructed in 2013-2014. (Requires certification?!) • Preparation for post-LS1 and post-LS2 Samples will be produced assuming the capacity of 1B/month for MC digi–reco at Tier1 sites and 400M/month for MC Gen-SIM at Tier2 sites.

  3. 5.1 Detector Performance • 5.1 Detector Performance Tasks 5.1.2 Stability Monitoring and Tool developments (in 2012 – 12 months) 5.1.3 Prompt feedback (in 2012 - 30 m) 5.1.4 Shift tools dev/support (2012-30m) 5.1.5* Offline shifts (2012-24m) 5.1.6 Anomalous events filters (2012-24m)

  4. 5.2 Monitoring and Data certification • 5.2 Monitoring and data certification 5.2.2 Online DQM (2012-6m) 5.2.3 Offline DQM (2012-6m) 5.2.4 Data Certification (2012-6m)

  5. 5.3 Database • 5.3 Database 5.3.2 Online database (3m) 5.3.3 Offline database (6m) 5.3.4 Interface Tools (6m) 5.3.5 WBM infrastructure (4.8)

  6. 5.4 CMS Software • 5.4 CMS Software 5.4.2 Simulation, Geometry and Material model (6m) 5.4.3 Digitization (8.4) 5.4.4 Reconstruction (9.6) 5.4.5 Validation (9) 5.4.6 Upgrades: Reconstruction and simulation (2.4)

  7. 5.5 Calibration and conditions • 5.5 Calibration and conditions 5.5.2 Calibration methods (9) 5.5.3 Trigger, AlCaReco and Monitoring (12) 5.5.4 Conditions updates and Validation (12) We have a real problem here-all our paths are strongly pre-scaled and we do not have enough events – should we report to management?

More Related