slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Presented by: Nahid Boustani SYST. 660-Spring 2013 PowerPoint Presentation
Download Presentation
Presented by: Nahid Boustani SYST. 660-Spring 2013

Loading in 2 Seconds...

play fullscreen
1 / 10

Presented by: Nahid Boustani SYST. 660-Spring 2013 - PowerPoint PPT Presentation


  • 99 Views
  • Uploaded on

Book: The Global Airline Industry By: Peter Belobaba Flight Crew Activities During a Typical Flight Sections 8.3.1 – 8.3.8. Presented by: Nahid Boustani SYST. 660-Spring 2013. Typical Flight Phases. Flight Crew Activities 1 & 2. 1. Flight Crew Sign in. 2. Operations/Planning.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Presented by: Nahid Boustani SYST. 660-Spring 2013' - pennie


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Book: The Global Airline IndustryBy: Peter BelobabaFlight Crew Activities During a Typical FlightSections 8.3.1 – 8.3.8

Presented by:

NahidBoustani

SYST. 660-Spring 2013

flight crew activities 1 2
Flight Crew Activities 1 & 2

1. Flight Crew Sign in

2. Operations/Planning

Flight plan: Aircraft type, forecast weather conditions, aircraft performance, loads and operating weights, aircraft mechanical condition, marketing constraints, airport limitations/curfews, alternate airports and company priorities.

Airline Operations Control Center (AOCC)

1 hour prior to the departure of the first leg

selecting the best routing in terms of time, fuel burn, ride conditions, etc.

flight crew activity 7
Flight Crew Activity 7
  • The take off is rejected if a critical problem is occurred before reaching V1
  • Communicate the problem to the control tower to close the runway