GRT - Background. The last 50 years have seen remarkable increases in the demand for moving people and goods. The surface transportation system has been under pressure to sustain the substantial increase in heavy truck and personal traffic volume levels.

penn
Download Presentation

GRT - Background

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRT - Background • The last 50 years have seen remarkable increases in the demand for moving people and goods. • The surface transportation system has been under pressure to sustain the substantial increase in heavy truck and personal traffic volume levels. • Considerable annual expenditures worldwide are allocated for developing the transportation infrastructure, including urban roads and highways. • GRT provides products to build new, upgrade unpaved, and maintain existing roads.

  2. Major Milestones 2008 Forestry Plantations Queensland Roads 2009 BC Iron– Western Australia (WA) Roads 2009 BHP Billiton– Mt Whaleback WA Hardstand 2009 Papua New Guinea (PNG) Roads 2009 Fortescue Mines (WA) Roads 2010 Rio Tinto – Tom Price Mine WA Roads 2010 PNG Highlands – Remote Villages Roads 2010 Canada – Environment Canada Approval Approvals 2011 PNG – National Road Program Potholes 2011 PNG – National Road Program Roads 2011 Entered Markets of Indonesia, India, East Timor 2011 Expanded Laboratory Testings Facilities 2011 Expanded Design & Project Management Capability

  3. An innovative formula for instant infrastructure

  4. GRT – Dust Suppression GRT 8000 GRT 8000 Untreated Road Surface Untreated Road Surface Treated Road Surface Treated Road Surface

  5. Dust Suppression Installation • GRT8000 has an initial three stage application process over three days that creates a surface layer which is semi-impervious to water and also provides the dust attenuation outcome. • Longevity of the application is in directly proportion to traffic, loading, and insitu material conditions. Further applications of GRT8000 are typically budgeted to be applied periodically as required to meet wearing rates according to operational and environmental conditions. • The below project has demanding conditions of more than 200 semi trailer water trucks per day on a road formation of White Gravel & Black Cotton Soil (clay) blend road through flat terrain of poor drainage with propensity of flooding. • Initial Treatment of three applications at 2x150mL /m2 and 1x200mL /m2 totaling 500mL /m2. • The estimated maintenance requirement per annum being five (5) additional coats at 100mL /m2 each application after the initial treatment. Note: Each situation is different and roads may require less or more maintenance as required. • Therefore a total budget of 0.5L of GRT8000 per m2 to maintain the section per year; giving rise to a total budget of 1.0L of GRT8000 /m2 for the first year. Note: The road surface prior to application of GRT8000 is best to be in a condition of reasonable cut, trim, and compacted surface with water before application.

  6. GRT Road Construction Description: Governor Powers Parkop GRT Wildlife Road section trial section, Port Moresby PNG Construction Phases • Trim existing road to profile. • Add imported material as required for formation. • Run stabiliser through area • Spray GRT9000per dosage over width of treatment area to OMC. • Run stabiliser through area twice • Trim surface with grader adding surface moisture as required. • Compact with static drum roller. • Final trim and multi tyre roller • 2-coat chip seal GRT8000 • Final compact multi tyred roller.

  7. GRT – Cost Summary (QLD, AU) Conventional Construction Sub-Base: Import, Supply, Place, Compact $18/m2 Base: Import, Supply, Place, Compact …………………………………………..$14/m2 1 Coat Asphalt Seal…………….$xx/m2 Total Rate…………………………..$32/m2 Project……………………………….$1.12m GRT Construction Sub-base: Insitu material blend and compact $ NIL Base: Insitu /or import supply, Blend & Compact ………………………………………………..$22/m2 1 Coat GRT Seal………………………. $xx/m2 Total Rate…………………………………$22/m2 Project……………………………………..$770k

  8. GRT Products - Stabilisation GRT7000 (clear) GRT9000 (black) • White liquid • Polymer based on Alkyl Acrylate-styrene copolymer • Specific Gravity: 1.02g/cm3 • Recommended for use in applications where: • Visual environmental impact is a high significance • visual appearance to be natural soils finish • Black liquid • Polymer-Bitumen based on Copolymer base ingredients • Specific Gravity: 1.02g/cm3 • Recommended for use in applications where: • General Road building and integration is significant • Visual appearance to be natural or black finish

  9. Products – Dust Suppression/Seal GRT7000 (clear) GRT8000 (black) • White liquid • Polymer based on Styrene - Carboxylated hybrid polymer • Specific Gravity: 1.02g/cm3 • Recommended for use in applications where: • Visual environmental impact is a high significance • visual appearance to be natural soils finish • Black liquid • Polymer-Bitumen based on Styrene - Carboxylated hybrid polymer • Specific Gravity: 1.02g/cm3 • Recommended for use in applications where: • General Road building and integration is significant • Visual appearance to be standard black road finish

  10. GRT Products – Toxicology Study GRT completed Toxicology Testing for GRT7000 and GRT9000: • An acute toxicity test with stock solution of GRT7000 and GRT9000 at ratios of (1:1000),(5:1000) and (10:1000) was done with P.reticulata • In order to determine the in situ field impacts of GRT7000 and GRT9000 acute toxicity screening tests, with P.reticulata were done on soil leachate of 1 soil sample compacted, cured and treated with GRT9000 as well as a control which was not treated. The results can be summarised for the acute toxicity test on stock solution as follows: • Acute toxicity tests indicated that without adjusting PH the stock solution of GRT7000 and GRT9000 at 0.1%, 0.5% and 1% was not harmful to the P.reticulata in 2ltrs of water after 72hr period. From the above mentioned results the following conclusions can be made: • Results of the soil leachate tests. Using P.reticulata ,indicated that GRT7000 and GRT9000 is not toxic for a typical material stabilised with these product when broken down and placed in 2ltrs of water . • 100% SURVIVAL RATE OF P.RETICULATA IN GRT TREATEMENTS • FULL REPORT AVAILABLE IN TECHNICAL MANUAL UPON REQUEST • BACTERIAL REPORT (E-COLI; TFC;SPC;SALMONELLA) IN TECH-MANUAL

  11. Design Approaches • GRT conforms to designs to standards including: AustRoads, AASHTO, and others. • Typically, structural design approaches to flexible pavement are empirical in nature. • However limitations of the empirical approach are becoming increasingly obvious with developments in the transportation system and increased knowledge in the fields of pavement mechanics and material science. • Premature failures of asphalt overlays within few years of construction are not uncommon, and the need for a more comprehensive mechanistic pavement design model has been recognized. Despite efforts by researchers in the last decades to enhance the mechanistic part of the design, no fully satisfactory, comprehensive alternative to the empirical approach has been found. • Research conducted by the Directorate for Transportation of the European Commission, in the late 1990s, to evaluate existing advanced analytical pavement design models, showed that the output varied considerably from model to model • Now there is a major effort to develop a new AASHTO Design Guide, with a potential to address the specific effects of the environment and traffic on the materials that relates its structural response to a realistic pavement performance. • GRT is working with leading Pavement Design Engineers to provide a GRT Mechanistic Design Tool to optimise GRT treated Roads.

  12. GRT Testing – CBR Performance RESULTS PROVIDED BY CLIENTS’ REGISTERED LABS TO NATIONAL STANDARDS GRT retains up to 80% of Dry strength in a Soaked Test *FIELD DCP TESTS WERE CONDUCTED WITH 2HRS SOAKAGE AFTER FLOODS IN AREA

  13. GRT Testing – Mpa Soak 4 Days QLD TRANSPORT & MAIN ROADS TEST REPORT: A6154 GRT9000 WITH CBR 35 MATERIAL

  14. GRT – Typical Pavement Dosage

  15. Case Study – Regional Highway Estimate Required Thickness for ESAL 2.5 for Life 20yrs @ R80% • Conventional 533mm • Sub-base, Base A&B >406mm • Surface course >130mm • GRT 185mm • Treat Sub-base >120mm • Surface course >65mm • Significant cost savings in Time & Machinery plus single pass with CBR 25 material treated and rolled Each Road is different and all projects require individual design by Civil Engineers Indicative Cross Sections

  16. Case Study Palm Plantation Stage 1 • 4 of 60km Haul Roads required rating of 16t/axle • 10 of 350km Access Roads required rating 3t/axle • Another Soil Stabilisation product had been used on the Main Roads & Access Roads • The product used was a sulphate product • The intense wet season destabilised the roads • GRT was requested to conduct tests on the soil and seek a solution using GRT product

  17. Condition of Road at Inspection After the first wet season roads had significant Deformation Operators Deemed Road to beNon-Trafficable due to failure

  18. GRT Laboratory Testing - Soak Sample Untreated Sample Treated with GRT9000

  19. Soak Test at 0 Hours Untreated already breaking up Treated sample unaffected

  20. Soak Test at 3 Hours Untreated completely collapsed Treated sample unaffected

  21. Soak Test at 16 Hours Untreated completely collapsed Treated sample unaffected

  22. Case Study - Roads Access Roads at Inspection Access Roads after Installation

  23. GRT - Pilot Project Recommendations Specific • State a defined outcome/result • Be precise Measurable • Quantifiable • Define reasonable criteria for success Achievable • Within the capabilities of the products but challenging • Comparable with objectives for other systems • Within available resources (time and/or money) • Appropriate resource should be in place Relevant • Directly linked to the objectives and priorities • Appropriate to current and future developments Time-framed • Set a date for completion • Identified as medium or long-term • Part of a series of phased dates for long-term. Strategic Actions Typical outputs that might be expected from this stage include: • Communication plan – Publicity, Reports etc. • Lessons learnt • Input to standards • Maintenance plan • Handover documentation • Business plan review • Risk review. • Further Projects scheduled

  24. GRT Pilot Project – Road Stabilisation The Pilot Project at Shultz’s Road, Ducklow, QLD. required 200+ Semi-Trailer water trucks, plus many Bdouble trucks daily, and drill rigs to be trafficable in all weather to mitigate down time of drilling operations. (Drill rigs were ultimately trafficked along this road in flood conditions). Road Was Unsealed White Rock 70mm over Cotton Black Soil Treatment to blended 50:50 White Rock & Black Soil with 2.5L GRT9000 per square metre with seal coat of GRT8000. Construction Phases Standard Procedure modified to utilise grader mixing in lieu of stabilising machine • Rip to depth and widen existing road to profile with grader as required. • Add imported material as required for formation to repair and/or upgrade. • Run stabiliser through area to be treated in section • Spray GRT9000 per dosage over width of treatment area to OMC. • Run stabiliser through area twice • Trim surface with grader adding surface moisture as required. • Compact with static drum roller. • Final trim • Spray seal coat GRT8000 • Final compact multi tyred roller.

  25. Pilot Project - Completed • Road Condition before • Road Condition after • Road Condition during heavy rain, normally closed in similar conditions

  26. Pilot Project – Project Procedure • Initial Application of GRT9000 • Grader turning/mixing GRT9000 into insitu material GRT recommends use of stabilisation machine for mixing GRT products into materials. Use of a grader should be last resort for mixing product and should always be undertaken under the supervision of GRT Technical Personnel.

  27. Pilot Project – Project Procedure • Further application of GRT9000 to grader turned Insitu material • Further application of GRT9000 to grader turned Insitu material

  28. Pilot Project – Project Procedure • Spreading windrow of GRT9000 blended material with Grader • Rolling trimmed road with drum roller GRT recommends use of stabilisation machine for mixing GRT products into materials. Use of a grader should be last resort for mixing product and should always be undertaken under the supervision of GRT Technical Personnel.

  29. Pilot Project – Project Procedure • Close up of finished road • Freshly finished

  30. Pilot Project - Completed • Road Condition when cured • Road Condition after Traffic • Road Condition during heavy rain normally closed in similar conditions

  31. Case Study - Roads Control Test: Test site 7 was untreated and used as Control White Rock untreated retained CBR 30% Cotton Black Soil untreated retained average of 13% All testing onsite was with only 2hrs of soakage

  32. Case Study - Roads

  33. Case Study - Roads

  34. Broken Roads Leads toBroken Communities

  35. CONTACT INFO:Level 15 Corporate Centre One, 2 Corporate Court Bundall QLD 4217 AUSTRALIA Head Office: +61 7 55 919 502Fax: +61 7 55 919 555 Email: info@globalroadtechnology.comWeb: www.globalroadtechnology.com