slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
sdo, Juni 02 PowerPoint Presentation
Download Presentation
sdo, Juni 02

Loading in 2 Seconds...

play fullscreen
1 / 26

sdo, Juni 02 - PowerPoint PPT Presentation


  • 356 Views
  • Uploaded on

References Innovative Attachment Systems For Timber Construction System WS sdo, Juni 02 Object Building Project: Silvan Space Place: Berlin, DE Product: WS-T-5x113 Application: Connection of staffs at base plate Planning: Brokking & Holthuizen GmbH, Berlin Calculations:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'sdo, Juni 02' - paul2


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

References

Innovative Attachment Systems

For Timber Construction

System WS

sdo, Juni 02

slide2

Object Building

Project:

Silvan Space

Place:

Berlin, DE

Product:

WS-T-5x113

Application:

Connection of staffs at base plate

Planning:

Brokking & Holthuizen GmbH, Berlin

Calculations:

Neubauer&Ernst Engineers, Berlin

Construction:

ARGE Silvan Space

sdo, Juni 02

slide3

Object Building

sdo, Juni 02

slide4

Hall Building

Project:

Climbing Sports Hall

Place:

Berlin, DE

Product:

WS-T-7x193/213

Application:

Post/Latch, Windplate

Planning:

FBU Finsterwalder Bauunion, Finsterwalde

Calculations:

Fa. Schnackenberg, Berlin, Hr. Sven Lange

Construction:

Holzbau Wehmeyer, Sternwalde

sdo, Juni 02

slide5

Hall Building

sdo, Juni 02

slide6

Engineered-Timber Construction

  • Project:
  • Food Market
  • Place:
  • Kainisch
  • Product:
  • WS-T-7x193
  • Application:
  • Tieback connection
  • Planning:
  • Bmst. Ing. Pilz, Gröbming
  • Calculation:
  • DI Koppelhuber, Rottenmann
  • Construction:
  • Systemholz AG, Gaishorn
  • Fa. Baumgartner, Reichenfels
slide7

Engineered-Timber

Construction

sdo, Juni 02

slide8

Engineered-Timber Construction

Project:

Musuem

Place:

Haus, AT

Product:

WS-T-7x193

Application:

Connect main and secondary purlins with aluminum bar carrier

Planning:

Fa. Holzbau Stiegler, Haus

Calculation:

DI Koppelhuber, Rottenmann

Construction:

Fa. Holzbau Stiegler, Haus

slide10

Engineered-Timber Construction

Project:

Car Dealership

Place:

Gross Dietmanns, AT

Product:

WS-T-7x153

Anwendung:

Befestigung Unterzug

Planning, Calculation and Construction:

Fa. Mokesch, Gmünd

sdo, Juni 02

slide12

Hall Construction

Project:

Agricultural storage

Place:

Schwanden, CH

Product:

WS-T-7x153

Application:

Support connection

Planning und Calculation:

Hüsser Holzleimbau, Bremgarten

Construction:

Marti Holzbau, Schwanden

sdo, Juni 02

slide13

Hall Construction

sdo, Juni 02

slide14

Engineered-Timber Construction

Project:

Real Estate Agency

Place:

Seewen, CH

Product:

WS-T-7x133

Application:

Truss plates connection, elbow connection

Planning, Calculation and

Construction:

Strübi Holzbau, Seewen

sdo, Juni 02

slide16

Engineered-Timber Construction

Project:

Horse Stable

Place:

Legenhausen, DE

Product:

WS-T-7x153

Application:

Truss plate connection

Planning:

Calculation:

Sieveke Zimmerei GmbH, Lohne, Hr. Logemann

Construction:

Fritz Katze+Sohn GmbH,Vechta

Sieveke Zimmerei GmbH, Lohne

sdo, Juni 02

slide18

Engineered-Timber Construction

Project:

Transport Bridge

Place:

Heerbrugg, CH

Product:

WS-T-7x233

Application:

Truss plate connection

Planning:

RLC, Rheineck

Calculation:

MKP Merz Kaufmann Partner AG, Altenrhein

Construction:

Schönauer&Graf GmbH, Rebstein

sdo, Juni 02

slide21

Engineered-Timber Construction

Project:

Cartier

Place:

Genf, CH

Product:

WS-T-7x153

Application:

Truss plate connection

Planning and Calculation:

Häring+Co. AG, Pratteln

Construction:

Roth AG, Burgdorf

sdo, Juni 02

slide23

Engineered-House Building

Project:

Musuem

Place:

Haus, AT

Product:

WS-T-7x193

Application:

Connecting main and secondary purlins with aluminum plates

Planning:

Fa. Holzbau Stiegler, Haus

Calculation:

DI Koppelhuber, Rottenmann

Construction:

Fa. Holzbau Stiegler, Haus

slide24

Building of Elements

Project:

Glass faccade Lofts

Place:

Widnau, CH

Product:

WT-T-5x153

Application:

Bend resistant edge connection

Planning, Calculation and Construction:

Sieber-Viertl Holzbau GmbH, Diepoldsau

sdo, Juni 02

slide25

House Building

Project:

Truss plate connection

Place:

Finnland

Product:

WS-T-5x93

Application:

Truss Plate connection

Planning, Calculation and Construction:

Vierumäen Teollisuus, Vierumäki

sdo, Juni 02

slide26

House Building

sdo, Juni 02