An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Power Peer Review Gus Simiao Vortex Hydro Energy simiaog@vortexhydroenergy.com 734 253 2451 November, 2011 ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN ENERGY

  2. VIVACE Technology

  3. Purpose, Objectives, & Integration • The VIVACE converter is a transformational technology. • It taps into a vast new source of clean and renewable energy, that of water currents as slow as 2 to 4 knots, previously off limits to conventional turbine technology that target rivers with water currents greater than 4 knots. • The vast majority of river/ocean currents in the United States are slower than 3 knots.

  4. Technical Approach • Increase the conversion efficiency from hydrokinetic energy to cylinder kinetic energy. • Increase the conversion efficiency from the cylinder kinetic energy to electric energy generation. • Perform open water testing on an improved VIVACE system that will incorporate the improvements obtained from objectives 1 and 2.

  5. Plan, Schedule, & Budget Schedule • Initiation date: 9/1/2010 • Planned completion date: 12/31/2012 Budget: • Planned and actual budget are tracking very closely • 15% of project budget expended as of August 2011

  6. Accomplishments and Results • VHE designed and is currently fabricating its next generation power takeoff (PTO) unit. • The new PTO will incorporate lessons learned that improve hydrodynamic efficiency as well as conversion efficiency from hydrodynamic to electricity.

  7. Challenges to Date • The most prevalent challenge has been software development for the power takeoff unit. • VHE’s design process makes provision for several software iterations, culminating in a laboratory test at the U of Michigan Marine Hydrodynamics Lab

  8. Next Steps • Laboratory testing of new PTO expected in November and December of 2011 and January 2012 • Open water testing in the St. Clair River, at Port Huron, MI is scheduled for spring / summer 2011