1 / 3

September 29,2014|VRWG

September 29,2014|VRWG. Steven Weaver. Manager, Operational performance, training and Integration. Review of Existing Procedures. Curtailment Procedures and Priority. Minimum Generation – Post Wind Integration. CROP.25005 Minimum Generation Minimum Generation Emergency

pancho
Download Presentation

September 29,2014|VRWG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. September 29,2014|VRWG Steven Weaver Manager, Operational performance, training and Integration Review of Existing Procedures Curtailment Procedures and Priority

  2. Minimum Generation – Post Wind Integration • CROP.25005 Minimum Generation • Minimum Generation Emergency • Software will dispatch Generators to Emergency Minimum • Day-Ahead transactions can be curtailed • If the above actions do not mitigate the Minimum Generation Emergency, non-dispatchable Generators may be reduced. (Wind is curtailed here) • In economic order using a bid de-stacker to EmerMin • Pro rata curtailment where prices are identical • Some latitude for inter-temporal constraints and system capacity • No wind has been curtailed for a Minimum Generation Emergency condition, post wind integration.

  3. Transmission Curtailment – Post Wind Integration • SOP-RTMKTS 0060 0020 Monitor System Security • Dispatchable generators to Economic Minimum • Deny Real-Time only Self Schedule Generators • Deny Day-Ahead Self Schedule Generators pro-rata • May be modified for any of the following • Thermal constraint sensitivity • System and area capacity • Minimum run and minimum down times • Other reliability concerns (i.e. voltage performance, stability) • Language added to SOP detailing process for making pro rata generator curtailments

More Related