slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 PowerPoint Presentation
Download Presentation
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009

Loading in 2 Seconds...

play fullscreen
1 / 26

Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 - PowerPoint PPT Presentation


  • 153 Views
  • Uploaded on

Mason School District. Building Work Committee Renovation & Expansion Project Presentation March 7, 2009. THE TEAM. Mason School District Building Committee Mary McDonald Bob Bergeron Fred Greenwood Bob Hemmer Bernie O’Grady The Jordon Institute Energy Consultants Paul Levelle

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Building Work Committee Renovation & Expansion Project Presentation March 7, 2009' - page


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Mason School District

Building Work Committee

Renovation & Expansion

Project Presentation

March 7, 2009

slide3

Mason School DistrictBuilding Committee

Mary McDonald

Bob Bergeron

Fred Greenwood

Bob Hemmer

Bernie O’Grady

The Jordon InstituteEnergy Consultants

Paul Levelle

Kirk Stone

Daniel V Scully Architects

Daniel Scully

Katie Cassidy Sutherland

The Jordon InstituteConstruction Managers

John Gaston

David Bryson

Other Key Contributors

Mark Richardson

George & Catherine Schwenk,

The Mason Congregational Church

NH DOE

& lots of on-lookers! …

slide5

To Provide Information

    • How We Got Here : Needs Assessment & Design Themes
    • What it looks like : Building Plans Overview
    • Estimated Cost
    • Schedule
  • To Answer Questions
    • Your thoughts, questions, ideas & overall Feedback
    • Prepare for March 12th Vote
slide6

How We Got Here

    • Withdrawal from Mascenic School District
    • Creation of Mason School District
    • Create Curriculum
    • Build a Staff
    • Find a "Home" for students
  • What We Considered
    • Building a New School for K thru 12
    • Build a New Building for K thru 5
    • Utilize Existing Buildings for K thru 5
    • Add on to Existing Building for K thru 5
slide7

Proposed : Site Modification

Town Hall

Existing School

Parsonage

Old Road

School Lot Line Adjustment

Relocation of Parsonage Lot

slide8
REQUIRED Life & SafetyADA AccessFire EgressNH Dept. of EducationStructural Repair Fire Detection UpgradeBuilding Code Upgrade
slide12
REQUIRED Administration SpaceREQUIRED CafeteriaPrincipalSuperintendentStaff RoofConference RoomCafeteriaKitchen
slide14

Computer /ArtExpansionUtilized forComputer / MediaRoom and Art RoomIf Population Bubble OccursIt Can Be Utilized As A Larger Grade Classroom

slide15

School / TownShared SpaceExpanded Space Can Be UtilizedFor School Music SpaceShared With The Town It CanBe Utilized AS A Meeting Space, Function Hall, Etc.

slide21

Schedule Outline

Mason School District Bond Appropriation March 12, 2009

Lot line & Site finalization - Parsonage relocated June 2009

Ground Breaks for Addition July 2009

School Starts – Classrooms & Mechanical

Room Complete Admin & SPED in Temps August 2009

Addition Complete June 2010

Renovation of Administration & Building Connection August 2010

Temporary Classrooms removed August 2010

Building Project Completed September 2010

High Performance Certification December 2010 / January 2011

slide23

Estimated Cost & Potential Aid

Architectural / Engineering Design$ 577,109Site / Construction$3,886,425Total Bond Appropriation$4,274,534TOTAL DOES NOT DEDUCT NH AID (30%) TOTAL DOES NOT DEDCUCT GRANT PROPOSALS TOTAL DOES NOT DEDUCT ECONOMIC STIMULUS OPPORTUNITIES (Possibly as high as 5+%)

slide25

What Your Vote Will Do

  • YES
    • Will have the project proceed as presented.
    • (The action that the Building Committee Endorses)
  • NO
    • Will stop all present projects.
    • Require us to resubmit a plan to the NH Dept. of Ed.
    • If plan does not meet their approval, they take over the process.
    • Possible closing of school and require us to tuition K thru 5.
    • Loss of NH State funding possible.
    • Loss of Federal Funding.
    • Present debt due to Mascenic due in full this year.
    • Tax impact will be significantly higher.
    • Cost of sending our children to school may be significantly higher.
    • (This action is NOT endorsed by the Building Committee)