An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Discounting Overview H. Scott Matthews 12-706 / 19-702 / 73-359 Lecture 3

  2. Announcements • HW 1 Returned • Comments from TA’s (good, need to do better) • Solutions / “best answers” posted this afternoon • Pipeline Case (for next Monday) is posted • Chris Hendrickson will do that case

  3. Project Financing • Goal - common monetary units • Recall - will only be skimming this material in lecture - it is straightforward and mechanical • Especially with excel, calculators, etc. • Should know theory regardless • Should look at problems in Chapter and ensure you can do them all on your own by hand

  4. General Terms and Definitions • Three methods: PV, FV, NPV • Future Value: F = $P (1+i)n • P: present value, i:interest rate and n is number of periods (e.g., years) of interest • i is discount rate, MARR, opportunity cost, etc. • Present Value: • NPV=NPV(B) - NPV(C) (over time) • Assume flows at end of period unless stated

  5. Notes on Notation • But [(1+i)-n ] is only function of i,n • $1, i=5%, n=5, [1/(1.05)5 ]= 0.784 = (P|F,i,n) • As shorthand: • Future value of Present: (P|F,i,n) • So PV of $500, 5%,5 yrs = $500*0.784 = $392 • Present value of Future: (F|P,i,n) • And similar notations for other types

  6. Timing of Future Values • Normally assume ‘end of period’ values • What is relative difference? • Consider comparative case: • $1000/yr Benefit for 5 years @ 5% • Assume case 1: received beginning • Assume case 2: received end

  7. Timing of Benefits • Draw 2 cash flow diagrams • NPV1 =1000 + 952 + 907 + 864 + 823 = $4,545 • NPV2 = 952 + 907 + 864 + 823 + 784 = $4,329 • NPV1 - NPV2 ~ $216 • Note on Notation: use U for Uniform $1000 value (a.k.a. “A” for annual) so (P|U,i,n) = (P|A,i,n)

  8. Finding: Relative NPV Analysis • If comparing, can just find ‘relative’ NPV compared to a single option • E.g. beginning/end timing problem • Net difference was $216 • Alternatively consider ‘net amounts’ • NPV1 =1000 + 952 + 907 + 864 + 823 = $4,545 • NPV2 = 952 + 907 + 864 + 823 + 784 = $4,329 • ‘Cancel out’ intermediates, just find ends • NPV1 is $216 greater than NPV2

  9. Internal Rate of Return • Defined as discount rate where NPV=0 • Literally, solving for breakeven discount rate • Graphically it is between 8-9% • But we could solve otherwise • E.g. • 1+i = 1.5, i=50% • Plug back into original equation<=> -66.67+66.67

  10. Decision Making • Choose project if discount rate < IRR • Reject if discount rate > IRR • Only works if unique IRR (which only happens if cash flow changes signs ONCE) • Can get quadratic, other NPV eqns

  11. Another Analysis Tool • Assume 2 projects (power plants) • Equal capacities, but different lifetimes • 70 years vs. 35 years • Capital costs(1) = $100M, Cap(2) = $50M • Net Ann. Benefits(1)=$6.5M, NB(2)=$4.2M • How to compare? • Can we just find NPV of each? • Two methods

  12. Rolling Over (back to back) • Assume after first 35 yrs could rebuild • Makes them comparable - Option 1 is best • There is another way - consider “annualized” net benefits • Note effect of “last 35 yrs” is very small!

  13. Recall: Annuities • Consider the PV (aka P) of getting the same amount ($1) for many years • Lottery pays $A / yr for n yrs at i=5% • ----- Subtract above 2 equations.. ------- • a.k.a “annuity factor”; usually listed as (P|A,i,n)

  14. Equivalent Annual Benefit - “Annualizing” cash flows • Annuity factor (i=5%,n=70) = 19.343 • Ann. Factor (i=5%,n=35) = 16.374 • Of course, still higher for option 1 • Note we assumed end of period pays

  15. Annualizing Example • You have various options for reducing cost of energy in your house. • Upgrade equipment • Install local power generation equipment • Efficiency / conservation

  16. Residential solar panels: Phoenix versus Pittsburgh • Phoenix: NPV is -$72,000 • Pittsburgh: -$48,000 • But these do not mean much. • Annuity factor @5%, 20 years (~12.5) • EANC = $5800 (PHX), $3800 (PIT) • This is a more “useful” metric for decision making because it is easier to compare this project with other yearly costs (e.g. electricity)

  17. Benefit-Cost Ratio • BCR = NPVB/NPVC • Look out - gives odd results. Only very useful if constraints on B, C exist.

  18. Question 2.4 from Boardman • 3 projects being considered R, F, W • Recreational, forest preserve, wilderness • Which should be selected?

  19. Question 2.4 Project “R with Road” has highest NB

  20. Beyond Annual Discounting • We generally use annual compounding of interest and rates (i.e., i is “5% per year”) • Generally, • Where i is periodic rate, k is frequency of compounding, n is number of years • For k=1/year, i=annual rate: F=P*(1+i)n • See similar effects for quarterly, monthly

  21. Various Results • $1000 compounded annually at 8%, • FV=$1000*(1+0.08) = $1080 • $1000 quarterly at 8%: • FV=$1000(1+(0.08/4))4 = $1082.43 • $1000 daily at 8%: • FV = $1000(1 + (0.08/365))365 = $1083.27 • (1 + i/k)kn term is the effective rate, or APR • APRs above are 8%, 8.243%, 8.327% • What about as k keeps increasing? • k -> infinity?

  22. Continuous Discounting • (Waving big calculus wand) • As k->infinity, PV*(1 + i/k)kn --> PV*ein • $1083.29 using our previous example • What types of problems might find this equation useful? • Where benefits/costs do not accrue just at end/beginning of period

  23. IRA example • While thinking about careers.. • Government allows you to invest $2k per year in a retirement account and deduct from your income tax • Investment values will rise to $5k soon • Start doing this ASAP after you get a job. • See ‘IRA worksheet’ in RealNominal

  24. Real and Nominal • Nominal: ‘current’ or historical data • Real: ‘constant’ or adjusted data • Use deflator or price index for real • For investment problems: • If B&C in real dollars, use real disc rate • If in nominal dollars, use nominal rate • Both methods will give the same answer

  25. Real Discount Rates (Campbell notation) • Market interest rates are nominal • They reflect inflation to ensure value • Real rate r, nominal i, inflation m • Simple method: r ~ i-m <-> r+m~i • More precise: • Example: If i=10%, m=4% • Simple: r=6%, Precise: r=5.77%

  26. Garbage Truck Example • City: bigger trucks to reduce disposal $$ • They cost $500k now • Save $100k 1st year, equivalent for 4 yrs • Can get $200k for them after 4 yrs • MARR 10%, E[inflation] = 4% • All these are real values • See “RealNominal” spreadsheet for nominal values