An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chandra Users’ CommitteeCXC Manager’s Status ReportFor the period April 09 – October 09 Edward Mattison CXC Deputy Manager 29 October 2009

  2. Topics • Program Level Status • Program Management • Spacecraft • Science Instruments and Calibration • Mission Planning • OCC • Data Processing • CXCDS • Chandra Director’s Office • Education and Public Outreach • Mission Metrics • Chandra Grant Awards CXC Status Report/CUC

  3. Top Level Summary • Spacecraft and instruments are performing superbly • The CXC contract extension for up to 10 additional years and $573M is expected to be signed in mid-November CXC Status Report/CUC

  4. Program Level Status – Program Management • Budget • The CXC’s budget is on track with the FY09 Operating Plan • CXC contract extension • SAO submitted (in July) the requested proposal to extend the CXC contract for up to 10 years • We are currently working with MSFC and subcontractors to resolve audit questions and to deal with NGST rate changes that resulted from NGST’s corporate reorganization • Expect signed contract extension in mid-November CXC Status Report/CUC

  5. Program Level Status – Program Management • Facilities • SAO and NGST studied the feasibility of moving the OCC from Kendall Square to Cambridge Discovery Park, to save ~$1M/yr • Produced detailed plan and schedule • After considering benefits vs. risk, MSFC declined to approved the move • Reviews and Conferences • Peer Review (6/22/09) • Supernova Remnant workshop (7/8/09) • Quarterly review (9/2/09) • Calibration review (9/21/09) • Chandra’s First Decade of Discovery (9/22-25/09) • Einstein Fellows Symposium (10/27/09) CXC Status Report/CUC

  6. Program Level Status – CXC Organization CXC Status Report/CUC

  7. Program Level Status – Operations • Spacecraft • Continues to operate extremely well overall • Nominal passages through summer eclipse season • Science Instruments • Instruments are operating extremely well CXC Status Report/CUC

  8. Program Level Status – Operations • Anomalies • Momentum Unloading Propulsion System (MUPS) pressure drop • Propellant pressure reading decreased abruptly 7/19 • Cause: Pressure transducer operates incorrectly • Impact: Benign; Demonstrated CXC’s skill in handling anomaly situation • Grating status switch operates unexpectedly • HETG move flag set to ‘failed’ 7/7/09 (grating move was okay) • Cause: Previously-failed microswitch unexpectedly came to life • Impact: Benign; Updated software to ignore switch state • Incorrect command sequence uploaded • Cause: Operator error 8/28 • Impact: Benign (but could have led to safing action if not identified); Updated procedures to prevent recurrence CXC Status Report/CUC

  9. Program Level Status – Operations • Mission Planning: Load-interrupting TOOs • No load-interrupting TOOs during this period • Several loads were replanned to respond to anomalous conditions • Data Processing • Automatic processing is current; mean time from end of observation to delivery to user remains at about one day CXC Status Report/CUC

  10. Program Level Status – Operations • CXC Data System Releases Version Date Main contents DS 7.6.11.13 4/24 CfP11 proposal review support DS 8.0 7/14 Migrate operations to Solaris 10 DS 8.1 9/16 Migrate CDO, mission planning operations to Linux CIAO 4.1.2 4/20 Port to Solaris 10; release Level 3 tools CAT 3.1.2 5/21 CSCview, novice user fixes, VO cone search GoogleEarth1.0 6/26 Web interface to CSC field of view & images CAT 3.1.4 9/18 VO cone search verbosity fix CSC = Chandra Source Catalog VO = Virtual Observatory CXC Status Report/CUC

  11. Program Level Status – Operations • Calibration Database (CalDB) Releases • CalDB 4.1.3 7/7 ACIS T-gain epoch 37 • CalDB 4.1.4 9/17 ACIS T-gain epoch 38 • GO and Fellows Program, CXC Director’s Office • GO peer review 6/22; 668 proposals submitted, 207 approved • Einstein Fellows call for proposal posted; proposals due 11/5 • Grant issuance is current; average time to award < 3 weeks • Education and Public Outreach • CXC’s “Beautiful Universe” HD podcast series won the Communicator Award of Excellence, the professional peer-judged award by the same group that oversees the Webbys • “From Earth to the Universe, ” the International Year of Astronomy exhibit developed by the CXC’s EPO group, has been exhibited in over 200 locations in 65 countries, including close to 40 installations in a variety of settings in the US. See http://www.fromearthtotheuniverse.org. CXC Status Report/CUC

  12. Mission MetricsMUPS Fuel Usage CXC Status Report/CUC

  13. Mission MetricsThruster Warm Starts CXC Status Report/CUC

  14. Mission MetricsObserving Efficiency CXC Status Report/CUC

  15. Data Delivery Effectiveness CXC Status Report/CUC

  16. Grant Award Effectiveness CXC Status Report/CUC