slide1
Download
Skip this Video
Download Presentation
Looking back and future prospective in Ukraine

Loading in 2 Seconds...

play fullscreen
1 / 20

Looking back and future prospective in Ukraine - PowerPoint PPT Presentation


  • 334 Views
  • Uploaded on

Looking back and future prospective in Ukraine (State Program on preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine ). State Special-Purpose Program On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Looking back and future prospective in Ukraine' - ostinmannual


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Looking back and future prospective in Ukraine

(State Program on preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine )

slide2
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

State Special-Purpose Program on preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine was approved by the Decree #107 of the Cabinet of Ministers on the 22-th of February 2008

  • The program contains 21 tasks, based on the UEFA requirements and corresponding government guarantees.
  • General budget of the Program is estimated around 16,06 billion EUR (160,59 billion UAH), of which 2,86 billion EUR (28,59 billion UAH) – from the State Budget of Ukraine (17,8% of state budget);2,26 billion EUR (22,58 billion UAH) – funds from local budgets (14,1%); 10,96 billion EUR (109,5 billion UAH, 68,1%) – from other sources (loans, investors, private funds etc).
  • The Program is the main mechanism of preparing and staging the final tournament of the European Football Championship 2012 in Ukraine. Program’s tasks, indicators and actions make up the basis for the detailed programs of the Host Cities, Crimea Autonomous Republic, state regional administrations, ministries and other bodies as well as for the plans of preparing the main objects (stadia, airports, health care establishments etc), in accordance with the UEFA requirements.
slide3
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

The structure of forecast volume of Program financing by categories of preparation, %

slide4
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

estimated expenditures by domains in eur mln
Estimated Expenditures (by domains in EUR mln)

State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

sport objects
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Sport objects
slide7
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Donetsk Dnepropetrovsk

slide8
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

  • Kiev
  • Project status: construction phase
    • Design team appointed (GMP)
    • Design in final phase (April 2009)
    • Simplified procurement procedure introduced (subcontactors)
    • General Contractor – Holding Company “Kyivmiskbud”
    • First stage: demolition - completed, construction works - started
  • Start of construction: end of 2008
  • End of construction: December 2010
  • Commissioning: June 2011
  • Complex project (constraints site,
  • timepressure)
slide9
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

  • Lviv
  • Project status: design phase
    • Design + master plan ready
    • Construction permit received
  • Contractor: “AZOVINTEX”
  • Start of construction: October 2008
  • Scheduledcommissioningdate:December 2010
slide10
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Kharkiv

slide11
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Odessa

transport infrastructure intercity connection
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Transport Infrastructure (Intercity connection)
slide13
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Airport - Ukraine: project status

  • No Construction work has started on any of the proposed Projects anddetailed design has yet to take place
  • Most Airports are 10 - 15% short of UEFA requirements even if all projectsare realised (development plans, support airports, and temporary terminals)
  • The construction work proposed for runways and terminals in Ukraine is fargreater than that envisaged for Poland
  • Donetsk:reconstruction of a new runway has started (completion Dec-09)
  • The other developments have yet to commence (taxiways and terminal)
  • Odessa: significant development works still to take place, including a new exhibition
  • centre which will be used as a temporary terminal for the event
  • Kiev, Dnepropetrovsk, Lviv, Kharkiv: very significant work (runway, taxiways, apron and also include a terminalbuilding) is required which makes it unlikely that they will achieve everythingbetween now and 2012
slide14
Russia,Baltik, Northland

From Russia

2

М-07

2

М-07

2

2

М-02

М-01

з країн ЄС

From EU countries

з країн ЄС

з країн ЄС

Н-22

Н-22

4

М-06

НН-1

4

Kiyv

4

4

М-06

4

М-09

From Russia

М-10

М-06

4

М-20

4

М-03

4

4

М-11

2

Kharkov

2

6

2

From EU countries

4

Lviv

М-03

4

М-03

М-05

2

2

4

2

Н-10

2

2

From Russia

М-03

4

4

4

6

4

М-06

2

4

Р-52

Р-51

М-18

2

4

4

4

М-04

Р-54

2

2

М-04

Dnipropetrovsk

4

М-18

М-03

2

4

4

Donetsk

Окружна

Н-11

From EU countries

Н-20

From Russia and country of Caucacian region

Romania, Bulgaria, Greece, Turkey in Poland and Lviv

М-14

М-16

Designation:

conditions appropriated part

major reconstruction part

reconstruction part

major composite reconstruction part

construction part

stream repairs and system improvement part

road safety

Road number

amount band

Odessa

М-15

International car check-point

4

State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Motorways

urban transport infrastructure in host cities
Urban transport infrastructure in host cities

State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

slide16
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Medical Assistance

accommodation
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Accommodation
energy supply
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Energy supply
expected results
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Expected results

Expectedresults of implementation of the program:

  • Staging the tournament according to all the requirements presented by UEFA and thus bringing benefit to the image of Ukraine;
  • Delivering 6 stadia meeting all FIFA and UEFA requirements enabling staging competitions of all the standards and increasing number of local an foreign tourists and fans;
  • Building, refurbishing of reconstructing more than 30 modern stadiums and training centers and thus develop infrastructure for local football competitions and training of Ukrainian teams;
  • Considerably develop and enhance transport infrastructure (airports, motor roads of general use, railway transport);
  • Creating conditions for intensive development of local business in all the domains of economy and spheres of social organization;
  • Attracting more than 10 billion EUR as investments;
  • Creation of employment (100 thousand addition vacancies);
  • Increasing amount of additional incomes for budgets of all the levels.
slide20
State Special-Purpose Program

On preparing and conducting of a final tournament of European Football Championship 2012 in Ukraine

Thank You for Attention

Welcome to Ukraine

Contacts:

Oksana Gryshkevych

E-mail: [email protected]

Tel: +380 44 286 03 00

ad