An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBL CO2 coolingControl system status10.04.2014 Tomasz Blaszczyk, Claudio Bortolin, Florian Corbaz, Olivier Crespo-Lopez, George Glonti, Jan Godlewski, Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny, Andrzej Zmuda, Dawid Szewczyk, Martijn Van Overbeek, Erno Roeland, Sylvain Nichilo

  2. Control system status • All WinCC OA users interfaces completed! • Personal Access Controls activated – each use his NICE login and passwordto accessto the SCADA L.Zwalinski M. OstregaIBL Control system status10.04.2014

  3. Control system status • One commonapplication for bothPLCs • Recipes for the bothplantsareequal L.Zwalinski M. OstregaIBL Control system status10.04.2014

  4. Control system status • Automatic start-up functions tested (plant A&B) • Cooling plant SWAP proceduresbetweenplants– fully tested! L.Zwalinski M. OstregaIBL Control system status10.04.2014

  5. Control system status • PID parameterstuning completed • Small changedpossibleduringlong term tests • PID parameters set to recipes and PLCscode L.Zwalinski M. OstregaIBL Control system status10.04.2014

  6. Control system status • LHC logging for A&B activated and tested • LASER alarms to CCC fully operational and tested with TI operators • DIP data to DCS are available and continouslypublishing • Direct Modbuscommunication ready for DCS to try L.Zwalinski M. OstregaIBL Control system status10.04.2014

  7. Control system status • All cabling for JunctionBoxin Sector5 completed • Local emergency stop button installed and tested L.Zwalinski M. OstregaIBL Control system status10.04.2014

  8. Control system status • TODO: • JB MVs end switchesstill to be replaced – waiting for ROTAREX • DSS cables still to be pulled probably this week • DSS actions (to cooling and from cooling) to be defined in the upcoming meeting • Water leak detection – waiting for Sergey M. • Water safety system to be installed and cabled • Blow system to be installed • Install cables in sector 5 for Manifold box (NTC sensors on in and out lines) – once manifold box in place L.Zwalinski M. OstregaIBL Control system status10.04.2014

  9. Thank You! L.Zwalinski M. OstregaIBL Control system status10.04.2014