Objective Tree

Objective Tree. Compressor ReVamp and Fabrication PO9452. Compressor ReVamp and Fabrication. Making Compressor Safe to Handle. Design of ReVamp. Room Considerations. Future Considerations. Instillation of Compressor. Communicate with Dresser Rand. ReVamp.

Download Presentation

Objective Tree

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective Tree Compressor ReVamp and Fabrication PO9452

  2. Compressor ReVamp and Fabrication Making Compressor Safe to Handle Design of ReVamp Room Considerations Future Considerations Instillation of Compressor Communicate with Dresser Rand ReVamp

  3. Communicating with Dresser Rand Fixing date for Compressor arrival (Anna Cheung) Acquiring technical documents (Anna Cheung) Act as team liaison with Dresser Rand (Sneha Rao, Anna Cheung)

  4. Making Compressor Safe to Handle Structural Analysis of floor and Compressor (Alex Scarangella, Anna Cheung) Safety Training at Dresser Rand (Team) Noise and vibration reduction/ damping (Ed Budriss) Ventilation and airflow analysis of room (Alex Scarangella)

  5. Room and Space Considerations Prepare space for storage of Compressor (Anna Cheung) Ensure suitable floor layout and access to Compressor (Anna Cheung) Prepare workspace for disassembly of compressor (Anna Cheung)

  6. Design of ReVamp Reduce output air pressure to 100psi (Sneha Rao, Edward Budriss, Alex Scarangella) Reduce horse power of compressor motor to 25hp (Sneha Rao, Edward Budriss, Alex Scarangella) Make considerations of reduced electrical feed (Edward Wolfe)

  7. Instillation of Compressor (Contract) Getting Compressor safely into designated work space (Team) Mount Compressor (Team) Ensure Compressor is stable (Team)

  8. ReVamp Take Compressor Apart (Sneha Rao, Ed Budriss, Alex Scarangella, Anna Cheung) Reduce Pressure to 100psi (Sneha Rao, Ed Budriss, Alex Scarangella, Anna Cheung) Electrical Feed Reduction (Ed Wolfe) Reduce horse power to 25hp (Sneha Rao, Ed Budriss, Alex Scarangella, Anna Cheung)

  9. Future Considerations Ready Compressor for instillation of Variable Valve timing mechanism (Ed Wolfe, Sneha Rao, Ed Budriss) Prepare data acquisition (Ed Wolfe) Prepare fabrication and Compressor drawings (Sneha Rao)